Home

Alaska District

Run scraper

POA-2015-27

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Discharge up to 1,386 cubic yards of rock fill material into 0.4425-acre of wetlands in order to construct a 75-foot long by 17-foot wide (toe-to-toe) driveway and a 100-foot by 180‑foot (toe-to-to) building pad. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated March 9, 2015. Sidney Bacom's stated purpose is to construct a driveway and pad for a single family residence. Please contact Shane McCoy at (907) 753-2715, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at shane.m.mccoy@usace.army.mil if further information is desired concerning this notice.

Discharge up to 1,386 cubic yards of rock fill material into 0.4425-acre of wetlands in order to construct a 75-foot long by 17-foot wide (toe-to-toe) driveway and a 100-foot by 180‑foot (toe-to-to) building pad. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated March 9, 2015. Sidney Bacom's stated purpose is to construct a driveway and pad for a single family residence. Please contact Shane McCoy at (907) 753-2715, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at shane.m.mccoy@usace.army.mil if further information is desired concerning this notice. POA-2015-27, Falls Creek_PN POA-2015-27, Falls Creek_PN Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas