Home

Galveston District

Run scraper

Martin Midstream Partners

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to expand a chemical storage facility on the Neches River.

Full Public NoticeProject PlansTCEQ Checklist The applicant proposes to expand an existing chemical storage facility. Such activities include installing a new ship dock with breasting dolphins, mooring dolphins, dock platform, and dock access trestle and installing 2,040 cubic yard of riprap along 880 linear feet of shoreline for bank stabilization. Additionally, the applicant proposes to hydraulically dredge 225,000 cubic yards of material and place it in Sabine Neches Navigation District Placement Area 23 or 24.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas