Carol Franson is the Regulatory point-of-contact for this permit application from Fred Wahl Marine Construction, Inc., for work impacting the Umpqua River Estuary in Reedsport, Oregon.
PUBLIC NOTICE for Permit Application
Issue Date: April 14, 2015
Expiration Date: May 13, 2015
US Army Corps of Engineers No: NWP-2002-40/4
30-Day Notice Oregon Department of State Lands No: Not Available
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:
U.S. Army Corps of Engineers
Carol S. Franson (carol.s.franson@usace.army.mil)
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Applicant: Mr. Fred Wahl
Fred Wahl Marine Construction, Inc. (FWMC)
100 Port Dock Road
Reedsport, Oregon 97467-4402
Location: The project is located in the Umpqua River Estuary at River Mile 10.75, an unnamed tributary, and adjacent wetlands on Bolan Island, Reedsport, Douglas County, Oregon. The site is in Sections 26 & 27 of Township 21 South, Range 12 West. (43.7127/-124.1046)
Waterway: Umpqua River Estuary, unnamed tributary, and adjacent wetlands.
Project Description: Fred Wahl Marine Construction (FWMC) proposes to construct a new boat maintenance facility consisting of a boat slip and wash basin with a concrete runway on both sides to accommodate the haul-out crane hoist. Impacts include:
Below the Mean High High Water (MHHW)--the excavation of approximately 3,538 cubic yards and the discharge of 205 cubic yards of material in an area measuring 9,059 square feet.
Sub-tidal impacts--the discharge of approximately 911 cubic yards and the excavation of 1,010 cubic yards of material from an area measuring 14,780 square feet.
Intertidal sand/mudflats—the discharge of approximately 151 cubic yards and the excavation of 933 cubic yards of material from an area measuring 3,652 square feet.
Intertidal salt marsh impacts—the excavation of 150 cubic yards from an area measuring 516 square feet.
Riparian areas at the Highest Measured Tide (HMT)—the discharge of approximately 30 cubic yards and the excavation of 381 cubic yards of material from an area measuring 2,200 square feet.
Included in the above impacts: proposed dredging of approximately 5,939 cubic yards.
Construction activities include the following:
Boat Slip Walls: An approximately 44-foot wide by 127-foot long boat slip would be constructed between the new pier and wash basin. The perimeter of the boat slip would be constructed of sheet piles installed using a vibratory hammer mounted to a crane. The slip wall would be tied to an anchor wall placed below ground approximately 35 to 45 feet behind the face of the slip wall. The two walls would be tied together with rods.
Shoreline Bulkhead Walls: Two shoreline bulkhead walls would be constructed along the bank of the Umpqua River Estuary to contain the existing banks during and after the proposed dredging activities. The walls would be constructed of sheet pile installed utilizing a vibratory hammer mounted to a crane. One shoreline bulkhead wall would extend north from the northern wall slip to the boat slip anchor wall and then an additional approximately 32 feet downstream along the bank of the river. The other shoreline bulkhead wall would extend south from the southern slip to the slip anchor wall and then an approximate 29 feet along the bank of the river. Within the sections between the slip walls, the shoreline bulkhead would be supported by an anchor wall that would be constructed approximately 45 feet behind the face of the wall, and perpendicular to the slip walls. The two walls would be tied together by tie rods.
Concrete Runways: Two approximate 11-foot concrete runways would be constructed parallel to the boat slip. The concrete runways would be utilized by the boat hoist and transport boats arriving at the facility for maintenance. They would be supported by plumb and batter pile bents constructed of 24-inch steel pipe piles. A total of 42 bents would be installed consisting of 84 piles to support the runways. Construction of the concrete runways would occur after all piling has been installed for the runways. Concrete work above the wetted channel would be cured using a spray-on curing compound and visqueen sheeting to minimize water quality impacts. The surface elevation of the runways would remain at 12.6 feet from the shoreline end of the runway to the in-shore end of the wash basin. The runways would be minimally sloped to bring the surface elevation down to the existing grade once the runways reach the railroad tracks.
Concrete Wash Basin: An approximate 150-foot long by 96-foot wide wash basin would be constructed at the end of the boat slip. Boats arriving at the site for maintenance would be guided through the slip by a boat hoist operated on the concrete runways. The boat hoist would then be able to lift the vessel and transport it to the wash basin for cleaning prior to maintenance services. The concrete boat basin would be constructed at the same elevation as the concrete runways, approximately 12.6 feet. It would be equipped with hard points spaced at 20 feet on center. The seven hard points would support cribbing for incoming boats during cleaning and allow for maintenance activities within the wash basin.
Wharf and Riprap Removal: The existing wharf and instream riprap would be removed. Working from a barge, the existing sheet pile along the bulkhead would be removed including the bulkhead fill material.
Slip Excavation and Dredging: A boat slip would be excavated to a constant depth of elevation approximately 10 feet between the new sheet pile walls. The dredge line would extend from the existing elevation approximately 10-foot contour within the river channel to the off-shore edge of the concrete wash basin. The river bottom would be graded back at a 3H:1V slope to the upstream and downstream side of the slip to match into the existing grade.
Concrete Pier: A concrete pier would be constructed to provide equipment access to boats in preparation for haul out. The concrete pier would be accessible from the upland portion of the facility via a gravel or paved path adjacent to the northern concrete runway. The deck of the pier would consist of a 196-foot by 70-foot concrete deck supported on 24-inch round steel pipe plumb and batter piles located in a grid pattern. A total of 118 piles would be installed to support the concrete pier.
Floating Dock: An 8-foot by 150-foot floating dock would be located to the west (downstream) of the concrete pier and would serve as a walkway to access moored boats. The dock would be constructed of at least 50 percent metal structural grates to allow water and light to pass through. The dock itself would be designed to float on the water surface. A light grated gangway measuring approximately 20 feet long by 3 feet wide would connect the floating dock to the concrete pier.
Catwalk Construction: A catwalk measuring 2 feet 6 inches wide would be constructed from the end of the upstream concrete runway to the existing dolphins to provide worker access. The catwalk would be constructed of prefabricated walkway with a grated base and tube truss railings and supported with five bents comprised of two 24-inch steel round piles.
Mitigation: If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose: To provide maintenance for large fishing vessels on dry land, facilities to increase business for fabricating fishing vessels, and draw active fishing vessels from the Alaskan fleets to Reedsport.
Drawing(s): Twenty (20) maps and drawings are attached and labeled Corps No. NWP-2002-40/4.
Additional Information: Additional information may be obtained from Carol Franson, Project Manager, U.S. Army Corps of Engineers at (541) 465-6894, or E-mail
carol.s.franson@usace.army.mil.
Authority: This permit will be issued or denied under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification: A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95 217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation: The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species: Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources: An initial evaluation of the proposed project area indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements: State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2004-40/4
Notice Issued: April 14, 2015
Oregon Department of State Lands No: Not Available Written Comments Due: May 13, 2015
WHO IS THE APPLICANT:
Mr. Fred Wahl
Fred Wahl Marine Construction, Inc. (FWMC)
100 Port Dock Road
Reedsport, Oregon 97467-4402
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES:
notice on the proposed project.
See attached U.S. Army Corps of Engineers public
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
2020 S.W. 4th Avenue, Suite 400, Portland, Oregon 97201-4953. Other project materials are
available by contacting the Corps per the attached public notice.
While not required, scheduling an appointment will ensure that water quality documents are
readily accessible during your visit. To schedule an appointment please call DEQ Water
Quality at Northwest Region at (503) 229-5552.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
Corps No. NWP-2002-40/4
Page 1 of 3
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
2020 S.W. 4th Avenue Suite 400
Portland, Oregon 97201-4953
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
People wishing to send comments via e-mail should send them in Microsoft Word (through
version 7.0), WordPerfect (through version 6.x) or plain text format. Otherwise, due to
conversion difficulties, DEQ recommends that comments be mailed in hard copy.
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No. NWP-2002-40/4
Page 2 of 3
PUBLIC NOTICE
OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM
CONSISTENCY CERTIFICATION
Date: April 14, 2015
U.S. Army Corps of Engineers No: Corps No. NWP-2002-40/4
Oregon Department of State Lands No: Not Available
NOTIFICATION:
For projects subject to coastal zone review, notice is hereby given that the project is being
reviewed by the Department of Land Conservation and Development (DLCD) as provided in
Section 307(c) of the Coastal Zone Management Act. The applicant believes that the
activities described in the attached materials would comply with and be conducted in a
manner consistent with the Oregon Ocean and Coastal Management Program. Project
information can be made available for inspection at DLCD's Salem office.
DLCD is hereby soliciting public comments on the proposed project's consistency with the
Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635
Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by
fax to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be
received by DLCD on or before the comment deadline listed in the accompanying Corps of
Engineers' Public Notice for Permit Application. For further information, you may call DLCD
at (503) 373-0050.
REVIEW CRITERIA:
Comments should address consistency with the applicable elements of the Oregon Coastal
management Program. These elements include the following:
Acknowledged Local Comprehensive Plans & Implementing Ordinances
Statewide Planning Goals
Applicable State Authorities incorporated into the Oregon Coastal Management
Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as
applicable.
INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your
comments to DLCD should explain why you believe the project is inconsistent and should
identify the Oregon Coastal Management Program element(s) in question. You should also
describe how the project could be modified, if possible, to make it consistent with the Oregon
Coastal Management Program.
Corps No. NWP-2002-40/4
Page 3 of 3
Corps No. NWP-2002-40/4
Page 1 of 20
Enclosure
Bolon Island - North of Reedsport
off of Hwy 101 at the intersection
with Lower Smith River Road
Approximate Project Area
I
'
I
\
<,
,
'y-
_)--
'
':
,.,--'
_/
_______ -- --\_ _____ _
,/
\
\
t:At-'IAft:t:DS
CONSULTING
>mw.obec.cvm
ct·ot,=n,
AM
Fl
1
CORPORATEOFFIC£920 COUIITTIY CLUB ROAD. SUTTE 1008 EUGENE. OREGON 97401-6089
REGIONAL OFFICES:
LAKE OSWEGO: SAL£M; MEDFORD. OREGON: VANCOUVER. WASHINGTON
BOLON ISLAND HAUL-OUT BASIN
DOUGLAS COUNTY, OREGON
~
.....
· -
--./
I
tf
I ii'\I
Corps No. NWP-2002-40/4
·
.,
Page 2 of 20
' .
\ __i i
Enclosure
Corps No. NWP-2002-40/4
Page 3 of 20
Enclosure
c: \ o b ec \ pwo b ec01 \ d02 11 234 \ JPA
Google Earth. 7/22/2012
Source:
../
/
/
/
//
/
/
/ /
/
/
/
/
11:
2015
AM
JOINT PERMIT APPLICATION
FIGURE 4
CORPOFIA TEOFFIC£:
920 COUIITFIY CLUB ROAD, SIJTT£ 1008 EUGENE, OREGON 97401-6089
REGIONAL OFFICES:
lAKE OSm?GO: SALEM; MEDFORD. OREGON: VANCOUVER. WASHINGTON
BOLON ISLAND HAUL-OUT BASIN
DOUGLAS COUNTY, OREGON
..ww.o/Jec.cam
'
CMI'IAICCD<'
CONSULTlNG
c~r~:rtm;;cnoJ
·
~---- -
/ - - - - - ---,
--- ---
/
/
/
Corps No. NWP-2002-40/4
Page 4 of 20
Enclosure
c : \ obec\ pwob e cOI \ d 0211234\ JPA Drawing s. d gn
Googte Earth Professional, 7/22/2012
Source:
,...,,
____
JOINT PERMIT APPLICATION
URE 4A
coRPOFIATEomcE.·
920 COUNTTIY CLUB ROAD, SUITE 1008 EUGENE. OREGON 97401-6089
REGIONAL OmCES:
LAKE OSWEGO: SALEM: MEDFORD. OREGON: VANCOIJV£!1. WASHINGTON
BOLON ISLAND HAUL-OUT BASIN
DOUGLAS COUNTY, OREGON
www.obec.com
'
t:Att'IAtt:t:Dl'
CONSULTING
""t:J/IV<;<;noJ
·
Corps No. NWP-2002-40/4
Page 5 of 20
Enclosure
Goog/e Earth Professiono/.7 /22/2012
Source:
Approximate Project Area
Subtidal Impact Area
- Below MLLW !0.54' EU
Intertidal Salt Marsh Impact Area
Intertidal Mudflats Impact Area
Below MHHW Impact Area
- Below 7.24' Elevation
Riparian HMT Impact Area
- Below 11.04 Elevation
Upland HMT Impact Area
- Below 11.04 Elevation
Above HMT Impact Area
- Above 11.04 Elevation
-
· -"Tt----
"- ........_
'-
'V
/
/
/
I
/
/
/
/
/
y
/
/
/
/
/
I
/
r
/
--./
/
/
/
/
/
/
\
/
~
'
/
/
/
·-..._
/
\
/
/
/
/
/
/
/
/
/
/
/
:._ ..
.'1
41111111111):
~
ENGINEERS
1~-.~!:~obt:\:.com
~CONSULTING
i
/
/
___ .
/
/
o.:a;o.v 9lJOk'/
)'--·7
,..-,
·I
DATE: MARCH 2015
JOINT PERMIT APPLICATION
DOUGLAS COUNTY, OREGON
FIGURE
5
!.A~~=OSWEGO.· ~.LEM !.~EDFOP.~. O.;;E.GOA':t'ANCDU!'E.-1: 1"/J.S:"f!NGTON
ijGJ~~~~·rr;;~f:E~g ROAD stFTE tCOS a E·\'f.
con.=cr..4iFOmCE:
IMPACT AREA OVERVIEW MAP
/
/
N BOLON ISLAND HAUL-OUT BASIN
!
/
/
/
Corps No. NWP-2002-40/4
Page 6 of 20
Enclosure
=
....,
~
~
c;
;;
..~
~
""
~
0:z:
~
~
0
~
,....
;:;
3::
;:
""
:::;;:
,...
~
~
=
....,
:::c
~
3::
""
~
(/)
()-.
0
=i
<
m m
;;u
<
.)>
m "
~z
z:o
tnZ
)>)>
-IV)
ti::Jr-
:r:ti::J
)>0
c.r;-0
Oz
c_
:5
=
~
=
b
~
;::;
Install floating dock and anchor piles. See Figure 1 3.
Construct concrete pier. See Figure 1 2.
Install scour wall sheet pile. See Figure 9.
Excavate and dredge boat slip. See Figure 8.
Remove existing wharf. See Figure 8.
100
50
100
SITE PLAN OVERVIEW
MLLW, El. 0.54
1 0. Construct stormwater facilities, see Figure 1 1.
9.
8.
7.
6.
5.
Construct wash basin. See Figure 1 0.
Install runway piles and runway concrete. See Figure 1 1.
3.
4.
Install sheet pile shoreline bulkhead walls and anchor
walls. See Figure 9.
Install sheet pile boat slip walls and anchor walls. See
Figure 9.
2.
1.
C:\obec\pwobec01 \ d0204653\0820-0001.00- POx- Site Plan Overview.dwg
4
·-I
t:::::J
1-:
Legend
Property Line
Wetland
Umpqua River
----- ---·
3/ 13/ 2015 4:11 PM
Corps No. NWP-2002-40/4
Page 7 of 20
Enclosure
Ioo
~
g
=
~
~
~ ~e")
z:o
""
=
~
~
.....
c:;
"
"'
m
r-
0::1
)>
-<
;;:c )>
()
-I -I
$:
$: $:
)>
c
(/)
3
0
g c, 2i
0 1'1;C::
"""'~
(t)
:tJ::!
:e~~
:es;;Cio)
,.
.:-'
;::
;::
~
~
"'
~
0
~
;;;:;
>o
c.r:-o
~ Oz
c I(/)
50 -oor>>
= (/)z
;
~
;::
==
>
~
"'
0
~
=
~
""
~
"'
~
~
;:;
TOTAL
9,059
3,538
--
--
--
--
3,509
26
3
--
--
--
--
CY
2
205
--
19
--
185
--
--
--
--
--
--
1
14,780
N/A
13
6181
11,1571
2,992
N/A
65
--
65
--
CY
65
--
65
--
Fill CY
2,778
600
N/A
2,178
SF*
839
65
--
774
CY
Removal
Upland HMT
839
65
--
774
Fill CY
1,010
--
--
--
--
1,010
--
--
--
--
--
--
CY
Removal
911
--
38
101
772
--
--
--
--
--
--
--
Fill CY
3,652
N/A
13
N/ A
1,6141
1,940
N/A
85
N/A
N/A
N/A
N/A
SF
933
--
--
--
--
929
--
4
--
--
--
--
CY
Removal
151
--
38
--
113
--
--
--
--
--
--
--
Fill CY
Intertidal Sand/Mudflat
Impacts
516
N/A
N/A
N/A
35 1
481
N/ A
N/A
N/A
N/A
N/A
N/A
SF
J
-
--
--
--
--
--
--
--
--
--
--
--
Fill CY
2,200
800
N/A
N/A
1231
894
150
N/A
N/A
7
211
15
SF
areo~.
30
10
-
--
-
--
--
--
--
16
3
1
Fill CY
47,411
1,300
N/A
N/A
N/A
N/A
N/A
N/A
14,585
27,254
N/A
4,272
SF
2,762
30
--
--
---
--
--
2,700
-
--
32
Removal
CY
3,510
13
--
--
--
--
---
756
2,692
--
49
Fill CY
Upland HMT Impacts
3/19/20151-18 PM
and a total of 2,300 square feet of these impacts will oco.tr within
381
26
--
--
--
341
14
--
--
--
--
--
CY
Removal
Riparian HMT Impacts
Impact area caltvlation includes over-water impact
150
--
--
--
--
150
--
--
--
--
--
--
CY
Removal
(~l~fl,$)
Intertidal Salt Marsh Impacts
BOLON ISLAND HAUL-OUT PROJECT PERMANENT IMPACT SUMMARY TABLE
Sub-tidal Impacts
N/ A
N/A
N/A
N/A
N/A
SF
175
N/A
175
N/A
SF*
Removal
Riparian HMT
*Impact arcto5a oro already accounted for In tho pormonont lmpoct 5ummory toblo.
TOTAL
Stormwater Facility
Construction
Shoreline Bulkhead
Construction
Construction
Boat Slip
Action
BOLON ISLAND HAUL-OUT PROJECT TEMPORARY
IMPACT SUMMARY TABLE
A total of 1,200 square feet of these impacts will oco.tr within the footprint of the existing wharf once it is removed.
Fill CY
lmpoct a reo colcvlotion include-s over-water/over-land impact are as.
tho footprint of the oxlstlng wharf once It Is removed.
1
Facility
Construction
N/A
6
Stormwater
N/A
Catwalk
Construction
2,9223
5,7822
300
29
Floating Dock
Construction
Construction
Concrete Pier
Proposed
Dredging
Removal
Existing Riprap
Remova l
Existing Wharf
Construction
N/A
N/ A
Concrete Runway
Construction
Wash Basin
N/A
18
SF
Removal
Below MHHW Impacts
Shoreline
Bulkhead
Construction
Construction
Boat Slip
Action
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Table.dwg
0
Corps No. NWP-2002-40/4
Page 8 of 20
~
....,
=
~
~
~
c;:;
;;
::;;
-c
_;;
.....
~
~
"'
::z
!3
0
· ~
0
~
"'
~
>
3::
;::
===
>
"'
0
""
=
:::;
~
3::
I
r-
..,
z
00
r-
<
)>
0
m
~
::::0 )>
"TI
::::0
)>
~
z:o
>>
(/lz
oor-
Oz
c_
-1(/l
>o
c.r:-o
Ioo
~
~
....,
~
~
1
Existing
wharf to be
removed
114 SF
7 CY Fill
Q\
0 ,\
Existing
riprap to be
removed
450 SF
40 CY Fill-~
Wetland
Property Line
HMT, El. 11.04
MHHW, El. 7.24
- - - - - - - MLLW, EL 0.54
l:::C:.J
1"=40'-0"
PLAN
~ Wetland Impacts (516 SF, 150 CY Removal)
Legend
1
1
/
. I! !'.'
I I t t
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Plan- Pier Removal.dwg
0
-------------r -
Enclosure
\
'
Wetland D
) ,
\
\
I
I
\
Excavation
limits ----+-~
I
I '
I
/
.....
I ,
'\
,.
I .
\
I
I I
EXISTING WHARF REMOVAL & DREDGING
\
\
Wetland C
\
,,
Wetland A
'
3/13/2015 4:15PM
Corps No. NWP-2002-40/4
Page 9 of 20
Enclosure
;;;
'~
~
...,
~
~
""
=
0
~
""
=
.....
.....
:zo
)>)>
cnZ
0>..-
-ten
Oz
c_
r;-0
c.-
.....
0
:CO>
~
)>0
=:
g=
=
=
...,
~
==
;;
>
==
;::
""
0
~
=:
~
::c
...,
~
==
;g
Wetland B
Wetland A
Wetland C,
removed by
dredging
1"=40'-0"
PLAN
BOAT SLIP
\
\
u
,_
-~
~
0
..s::::
-;;;
Property Line
HMT, El. 11.04
MHHW, El. 7.24
MLLW, El. 0.54
c·~ ~~~~J Wetland
.
~ Wetland Impacts
Legend
Boat Slip
W a l l s - - + - - - _ 1).--+1-----liJ-L'l
Boat Slip
Shoreline
Bulkhead Walls
211 SF
3 CY Fill
-
Basin, see
Figure 10
/
/
3/13/2015 4:14PM
~iiJII~~;;hQ.
Pile supported
Concrete Pier,
see Figure 1 2
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Plan- Boat Slip.dwg
0
~
0
0..
/. o-~ tL/.
l()
.;;
l()
0
N
.........
(")
.........
(")
~
· /..<>-~ t" L/
.. o-~vv
c
>
E
u.. ~=
CU)>-u..
calt)U>..ccooU
i.i:
'Vi
00
00
'
"'t'
"'t
q
I-
~
r--.., It)
"'C
jjj
c
I-'
c
~Nt'-..
a.
~
:::>
>c
~
c
::;)
~
I
~
"'C
c
Cll
C))
.....Cll
Cll
di...
:;:;
I-
~
I
"'Lt)O-o
~
...cCll
<(
Cll
c
c
...Cll
0
...
I
Cll
>
0
..0
<(
I
r
u
c
0
u
-z
( /)
'
;_
<(
~
I
(/)
0
0It)
<(
I
~
z<(
....J
a..
Cl
b
I
0
C'?
jl
.....
3:
"·v;c
0
"'
..c:
VI
0
~
t:
0
0::
><
0
0..
0
q
0
0
0
0
N
co
5?M
l()
-o
"0
N
0
"
/
0
u
C1)
.D
0
3:
0.
'"f
PROJECT: 0820-0001
.D
30
DATE: MARCH 2015
BOLON ISLAND
HAUL-OUT BASIN
FRED WAHL MARINE CONSTRUCTION
Corps No. NWP-2002-40/4
·~
CONSULTING
ENGINEERS
www.obec.com
PLAN
WASH BASIN
10
FIGURE 10 OF 20
REEDSPORT, OR
Page 10 of 20
Enclosure
Corps No. NWP-2002-40/4
Page 11 of 20
Enclosure
Ioo
z:o
Ulz
)>)>
oor-
-i(ll
Oz
c_
c.-
)>0
r;-0
i
~
~
""
..,
area
------------------~1
;;
--~
~
~
:z:
0
~
"'
~
0
~
,.....
~
3:
~
=
:::!:
>
"'
~
"'
~
=:!
~
=
...,
3:
"'
~
I
1 "=80'-0"
PLAN
Proposed
grading
limits
'\(Pipe pile·
'/
~
I)
~
Concrete Runway
27,274 SF
2,743 CY Fill
I
r
CONCRETE RUNWAY & STORMWATER
Stormwater
Filter Strips
\
\
Stormwater Swale
2,100 SF
23 CY Fill
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Plan- Concrete Runway.dwg
Upland HMT Fill Area
HMT, El. 11.04
~ Riparian HMT Fill Area
Wo///J
Legend
3/13/2015 4:16PM
:i.
"-
legend
"
~
Runoff direction
It)
0
lt:~~.~~:~:r:l
£-
L.i..:.,;,;.;.;.;..;.:_.:._:_,;,j Wetland
/
.:::::_
(")
~ Wetland Impacts
:1/
/
- - - - - - MLLW, El. 0.54
Concrete Pier,
MHHW, El. 7.24
15,853 SF
1,070 CY Fill
HMT, El. 11.04
Plumb pipe piles
\ /
\ longitudinal
batter piles
\\
t
~
~...
(I)
0>
~
-o
~
0:
....QJ
~
u
c
0
u
I
c
0
a:
I
X
0
"-
)
0
q
~
00
0
0
N
CXl
PLAN
0
/
(")
It)
-o
~
Runway
I
\
Property line
CONCRETE PIER
1"=40'-0"
"0
N
0
-o
/
0u
QJ
..0
0
~
/
a.
u
QJ
PROJECT: 0820·0001
..0
0
/
(j
DATE: MARCH 2015
BOLON ISLAND
HAUL-OUT BASIN
FRED WAHL MARINE CONSTRUCTION
Corps No. NWP-2002-40/4
·~
CONSULTING
ENGINEERS
www.obec.com
PLAN
CONCRETE PIER
12
FIGURE 12 OF 20
REEDSPORT, OR
Page 12 of 20
Enclosure
Legend
··· .I Umpqua River
:. ·.
'·
· ,.·
..·.
.:~; ··
;
.
'·
. ·.. .,
··. ;_ · ·
..
_. - ..
·.
''·..
. ·.·..
__ ,:
_.
. ' ..·
. '
·.· . .
. . ·..
'· ·
·. Partially .·
grated .·. ,.
::· deck on
floats
--.,-.·.
.·
.
--~
...
.,
:
··_ ,
: ' .
.._, ..
..,·: '·"
:
.· ' ·: Floati~~ Dock,
: 1,280 SF
··
· 109 CY Fill
....
·- \:.··
~~
:;':
. ·... -~- ... ' .
....
·...
.::·:
;:
:.
.
·.. :
.....
--~.
·., :·
,,
·'
pipe
piles
..
·,· ;,
::.::.
.
.._. _'·,..._·.·
. ~ .-.... . ...
._,_
.. ·..
. . .:.
·· ,: :. ._· _, .
,. ··.. ·. ,·.
-~
,. _ ·.·..
. ·.. ~
.. '··
·. -,·_··
.
. .. . .
· . Gangway .
{))
·. :
-"'g
·'
.,:-·· ·'·:, .·:.
..,
~
"'0
,.
...
' , ....
, ,; -
:-
:-· .
·'
. .
..
. . · · ··,
:::--'~ : _·· ..·:
..
. ·... ··'' ..
Concrete
.. Pier, see
· · ·. Figure 12 .··
..
.,
.
··-' : '
0
{))
. : . . .. .
...
c:
·-s
()
()
0
u::
.. .. ,,
c:
. ·:_.-:_·_
. : _ _:: ,__ : .
0
0::
. ' .. ...
··.·· :
·., . .. .
..
···
><
. ..· _.··
0
0..
PLAN
0
q
0
0
0
FLOATING DOCK
1"=30'-0"
0
N
co
5?-M
Note:
It)
-<>
"0
N
Floating dock impacts all below
MLLW elevation (subtidal).
0
"'0
/"
0
~
..0
~
Q.
'i
PROJECT: 0820-0001
..0
.30
DATE: MARCH 2015
BOLON ISLAND
HAUL-OUT BASIN
FRED WAHL MARINE CONSTRUCTION
Corps No. NWP-2002-40/4
·..._..
CONSULTING
ENGINEERS
www.obec.com
PLAN
FLOATING DOCK
13
FIGURE 13 OF 20
REEDSPORT, OR
Page 13 of 20
Enclosure
Corps No. NWP-2002-40/4
Page 14 of 20
Enclosure
~
-len
g
""
=
~
--~
~
~
,.,
:z
0
~
r;-0
cr-
c:z
""0
(/)0
)>()
-I -I
0'
0~
cnZ
z:o
)>)>
oor-
Oz
c_
.....
0
Ioo
;.;
)>0
g
=
~
=
b
~
3:::
;:::
l>
<::>
~
~
,.,
""
!::!
=
~
3:::
~
.....
,.,
""
=
1
1
Ti
Tip El. -1 0.1 5'
r
El. -35.15'
'i. Tie Rod----
Cut off El. +9.85' (typ.)
T.O. concrete El. + 1 2.6 (typ.)
Anchor
Wall
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Section- Boat Slip.dwg
<::>
1 "=20'-0"
SECTION
·'
j<'
I
ci..
<(
a.
24" dia.
Pipe Piles
Rock elev. varies,
shallowest at
approx. El. -45'
Boat Slip Wall
sheet pile
BOAT SLIP
...o.C
a.
x
Lo
0
*''Y?J
7->:Y>" '
Dredged
Mud line El. -1 0' ~
MHHW El. 7.24
Floating camel fender,
typ. (24" log)
Slip
44'-0"
Legend
Water
Surface
Anchor
Wall
sheet pile
3/13/2015 4:18PM
::E
0..
co
""i
.:!:..
ll)
:0
;;
N
N
'---.
M
+
'---.
w
M
Qj
Q)
t;
d
.....:
z
V)
0>
<(
1:
x..2
ca
~=
~9
~
a...o
J:<'l
u
0
I
Ct!
V)
1:
'iii
c
co
<(
0
~
I
..1:
:0
V)
c
~
0
I
z
:0
0
1-
0
0
I
<'I
=II
u
w
lI
V)
c:
0
·~
:0
N
Vl
X
+
0
0..
w
0
>c
C!
~
::>
0
0
0
1:
Ct!
0
N
0
co
d
5!M
.....:
ll)
..0
0
+-
\
"0
N
0
~
0
u
<1J
~ r--------------,r---------------------------r---------------------------.--------------------.--------~
~
a.
'i
PROJECT: 0820-0001
..0
3-0
DATE: MARCH 2015
BOLON ISLAND
HAUL-OUT BASIN
FRED WAHL MARINE CONSTRUCTION
Corps No. NWP-2002-40/4
·'
CONSULTING
ENGINEERS
www.obec.com
SECTION
WASH BASIN
15
FIGURE 15 OF 20
REEDSPORT, OR
Page 15 of 20
Enclosure
Corps No. NWP-2002-40/4
Page 16 of 20
Enclosure
~
=
.....,
~
0::
~
c;
~
~
~
~
""
~
~
_.....
:z:
0
;::""
0
'""'
~
~
;;
3:
;=
""
,..
==
~
~
"'
~
=
.....,
~
3:
~
-I
~
.......
:::tl
m
-
..,r-n)>0
..,--tZ
Cllm
--1(/l
0
)>
o:;l
z:o
>>
cnZ
oor-
Ioo
>o
c.r;-0
Oz
c_
-fen
~
=
~
=
~
\.Tie Rod
~~
1"=30'-0"
SECTION
-·-··-1+4-!~4--1-!+-ll.J.i-l+l+l'.J-.tfu~~~~s~
Downstream
Shoreline
Bulkhead Wall
Tip El. -35.15'
El. 14.6'
Pier deck
C:\obec\pwobecOl \ d0204653\0820-0001 .00- POx- Section- Boat Slip At Pier.dwg
)>
""
44'-0"
Wetland C
Impacts
·I
El. 12.6'
·I
Water
Surface
Upstream
Shoreline
Bulkhead
Wall
Anchor Wall
Legend
. [
Wetland D
Impacts
Catwalk
I:
BOAT SLIP AT PIER
I
3/1 3/ 2015 4:19PM
Corps No. NWP-2002-40/4
Page 17 of 20
Enclosure
~
~
=:
g
=
~
=
____ _
<.n
...,
=
~
:::c
:0:
;g
,
varies ~
RockEl.
El. -35.15'
El. 12.6'
!i. Tie Rod
\:!..._)
(
Concrete
Runway
( Boat Slip
Sheet Pile
Wall
127'-7~"
11
Catwalk
~ Scour Wall
96'-11 7/s"
1 "=40'-0"
SECTION (D\ BOAT SLIP LOOKING UPSTREAM
Wash Basin
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Section- Boat Slip Looking Upstream.dwg
c
!i. Exist. Dolphin
3/13/2015 4:20 PM
Corps No. NWP-2002-40/4
Page 18 of 20
Enclosure
~
m
00
.......
z
:::oo
-c()
m--1
(/)
:zo
(l)z
)>)>
oor-
-I(/)
c_
Oz
r;-0
cr-
)>0
Ioo
i
=
~
-----------------------,
=
:;:::
.....
~
=
""'
=
~
c;:;
:::
""
=
.....
~
3:::
~
'
24" dia.
pipe piles
Mud line
approx.
El. -15.0
Floating log
El. +14.6
Existing
subtidal
area
C:\obec\pwobec01 \d0204653\0820-0001.00- POx- Section- Pier.dwg
...,
=
""'
1 "=20'-0"
SECTION
~
.....
Longitudina l
batter piles
~-----
PIER
Transverse
batter piles
Remove existing pier
Above HMT
Concrete
deck
Legend
Water
Surface
Rock
Shoreline
Bulkhead
Wall
\_Steel
pile cap
3/13/2015 4:21 PM
::E
0..
~
"i
li. SLIP
1
1
22 -0 11
11 -0"
ll)
0
~
1
4 -0
4 1-0 11
11
~-------------------+------------------~
M
.::::_
M
TOC El. +12.6
Steel edge
guide - --../
?- - --- - l
.
. LJ
Boat Slip
sheet pile
wall - - --...
Geofabric
6" perf. pipe
24" dla.
pipe pile
74" crushed rock
I
><
0
0..
I
0
q
Legend
0
0
0
Water
Surface
0
N
co
0
./'
M
ll)
'()
"'"
DETAIL
~
1/2"=1 -0"
0
N
0
PILES AT RUNWAY
1
~
ca
Q)
~ ~----------.----------------------.---------------------.---------------,------~
~
a.
'£
PROJECT: 0820-0001
.!l
3(j
DATE: MARCH 2015
BOLON ISLAND
HAUL-OUT BASIN
FRED WAHL MARINE CONSTRUCTION
Corps No. NWP-2002-40/4
·'
CONSULTING
ENGINEERS
www.obec.com
DETAIL
PILES AT RUNWAY
19
FIGURE 19 OF 20
REEDSPORT, OR
Page 19 of 20
Enclosure
I·
2'-6"
·I
Prefabricated
walkway, grated
base, tube truss
railings to span
'i. SLIP
22'-0"
24" pile
Floating camel
fender (24"
dia. log) - - - ,
c
0
·n
Ql
1/)
)(
0
0..
0
q
0
0
0
SECTION
N
3/8"=1'-0"
0
co
~
CATWALK
M
Legend
It)
-<>
"0
N
0
"0
/
Water
Surface
0
~
~ ~------------,-------------------------.-------------------------,-----------------~------~
~
a.
'i 1-'-P-"-'RO:. :. :JE:. :_CT:.::. :-=-:08=20:_:-0:..:..:00:.:..1..0
30
DATE: MARCH 2015
---l
BOLON ISLAND
HAUL-OUT BASIN
FRED WAHL MARINE CONSTRUCTION
Corps No. NWP-2002-40/4
·~
CONSULTING
ENGINEERS
www.obec.com
SECTION
CATWALK
20
FIGURE 20 OF 20
REEDSPORT, OR
Page 20 of 20
Enclosure