The applicant has revised its plans for a facility expansion and associated mitigation.

Full Public NoticeProject PlansMitigation PlanResponse to Comments Dow proposes to discharge fill material into 10.71 acres of adjacent wetlands (same amount as previous public notice) for the construction of a Pressure Swing Adsorption Unit along with a reduced footprint for the parking area/lay down area (change from previous public notice). The proposed Pressure Swing Adsorption Unit is needed to take a hydrocarbons waste gas stream which is currently burned and convert this waste gas stream to a beneficial use product. The parking area/lay down area will support construction and operations of the Propane Dehydrogenation Unit and Light Hydrocarbon 9 Unit facilities which are both being built in uplands, where previous manufacturing facilities and equipment were located. The entire 35.3 acre project site will be utilized for this revised project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas