You can copy from here when filling out the rest of the page.
ASH SLOUGH ADDENDUM ONE MITIGATION BANK IN EAST BATON ROUGE PARISH
ASH SLOUGH ADDENDUM ONE MITIGATION BANK IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: A.S.H Mitigation Bank, LLC c/o Pangaea Conservation and Compliance LLC, Attn: Leonard McCauley, P.O. Box 2171, Denham Springs, LA 70727
LOCATION OF WORK: The 123.9 acre site is located approximately two miles south of Baker, Louisiana, in East Baton Rouge Parish, on Rafe Meyer Road, as shown on enclosed drawings (Latitude: 30.574058 N, Longitude:–91.193675W). The Project is located within the Bayou Sara-Thompson Creek Hydrologic Unit 08070201.
CHARACTER OF WORK: Degrade spoil banks and redistribute material for the purpose of enhancing and restoring traditional surface hydrology to the site for the construction of a mitigation bank. The proposed restoration will re-establish 24.4 acres, rehabilitate 4.2 acres and enhance 13.4 acres of bottomland hardwoods. In addition to the restoration acreage 21.3 acres of hydric inclusions and 34.8 acres of non-hydric inclusions will be included in the conservation servitude for the proposed bank.
JOINT PUBLIC NOTICE
April 27, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, La. 70160-0267
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(504) 862-2548/ FAX (504) 862-2574
Jacqueline.R.Farabee@usace.army.mil
Project Manager
Jacqueline Farabee
Permit Application Number
MVN-2014-00771-MR
(225) 219-3225/FAX (225) 325-8250
Elizabeth.Hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 150414-03
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers
and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ X ] Section 404 of the
Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
ASH SLOUGH ADDENDUM ONE MITIGATION BANK IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: A.S.H Mitigation Bank, LLC c/o Pangaea Conservation and
Compliance LLC, Attn: Leonard McCauley, P.O. Box 2171, Denham Springs, LA 70727
LOCATION OF WORK: The 123.9 acre site is located approximately two miles south of Baker,
Louisiana, in East Baton Rouge Parish, on Rafe Meyer Road, as shown on enclosed drawings
(Latitude: 30.574058 N, Longitude:91.193675W). The Project is located within the Bayou
Sara-Thompson Creek Hydrologic Unit 08070201.
CHARACTER OF WORK: Degrade spoil banks and redistribute material for the purpose of
enhancing and restoring traditional surface hydrology to the site for the construction of a
mitigation bank. The proposed restoration will re-establish 24.4 acres, rehabilitate 4.2 acres
and enhance 13.4 acres of bottomland hardwoods. In addition to the restoration acreage 21.3
acres of hydric inclusions and 34.8 acres of non-hydric inclusions will be included in the
conservation servitude for the proposed bank.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
-2applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the
address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit
for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of N/A acre(s) of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
-3If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interested in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Enclosure
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Contents
I. Bank Property Location ................................................................................................ 3
II. Objective ..................................................................................................................... 3
A. Aquatic Resource Type and Functions to be Restored/Enhanced/Preserved ......... 4
B. Watershed Contributions ......................................................................................... 5
III. Site Selection ............................................................................................................. 6
IV. Site Protection Instrument.......................................................................................... 7
V. Baseline Information .................................................................................................. 7
A. Land Use ................................................................................................................. 7
B. Soils ........................................................................................................................ 7
C. Hydrology ................................................................................................................ 8
D. Vegetation ............................................................................................................... 9
VI. Description of Work................................................................................................... 9
A. Soils/Hydrologic Work Plan ..................................................................................... 9
B. Vegetation ............................................................................................................. 10
VII. Maintenance Plan .................................................................................................. 12
VIII. Performance Standards ....................................................................................... 12
A. Initial Success Criteria ........................................................................................... 13
B. Interim Success Criteria ........................................................................................ 13
C. Long-Term Success Criteria ................................................................................. 14
IX. Monitoring Requirements ......................................................................................... 14
A. Permanent circular monitoring stations ................................................................. 15
B. Transects .............................................................................................................. 15
C. Soil Profile ............................................................................................................. 16
D. Floristic Survey...................................................................................................... 16
E. Photographs .......................................................................................................... 16
F. Qualitative Analysis ............................................................................................... 17
G. Hydrologic Conditions ........................................................................................... 17
H. Ledgers ................................................................................................................. 17
X. Monitoring Reports.................................................................................................... 17
A. As-Built Report ...................................................................................................... 17
B. Initial Success Criteria Report ............................................................................... 18
C. Interim Success Criteria Report ............................................................................ 19
D. Long Term Success Criteria Report ...................................................................... 21
XI. Bank Credits .......................................................................................................... 22
A. Credit Determination ............................................................................................. 22
B. Schedule of Credit Availability ............................................................................... 23
XII. Adaptive management plan .................................................................................... 23
XIII. Long Term Protection and Maintenance ................................................................ 24
XIV. Funding ................................................................................................................. 24
A. Construction and Establishment (C&E) Funds ...................................................... 24
B. Long Term Maintenance/Management Funds ....................................................... 25
XV. Other Information.................................................................................................... 27
Page 1 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Attachment MWP-A-Figures
Attachment MWP-B-Cost Analysis Report
Page 2 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
MITIGATION WORK PLAN FOR BOTTOMLAND HARDWOOD HABITAT
I. Bank Property Location
The center point of the property is located at Latitude 30.574058 N and Longitude
-91.193675 W, approximately 2.0 miles south of Baker, Louisiana in East Baton Rouge
Parish. The property is located in the Hydrologic Unit Code (HUC) 08070201 (Bayou
Sara Thompson Watershed).
Driving directions to the site are as follows: From the intersection of Interstate 10 and
Interstate 110, drive north on Interstate 110 toward Baker for approximately 7.5 miles;
take Exit 8A toward Baker (north) onto Louisiana Highway 19 North (Scotland Avenue);
proceed north for approximately 2.1 miles; turn left (west) on to Rafe Meyer Road;
proceed for approximately 0.5 miles; and the property will be on the right (see MBI
Attachment A, Figures 1-2).
II. Objective
A.S.H. Mitigation Bank, LLC (Owner), as the owner in fee title, will record a conservation
servitude for 123.95 acres. A.S.H. Mitigation Bank, LLC (Sponsor) will implement
mitigation improvements, including re-establishment (24.4 acres), rehabilitation
(4.2 acres), and enhancement (13.4 acres), for a total of 42.0 acres of bottomland
hardwoods at the Bank (Figures C1-C2 and Tables 1-2). The goal of the Ash Slough
Headwaters Mitigation Bank Addendum I (ASHMB I) is to restore a 110.8-acre
bottomland hardwood (BLH) wetland community as a species diverse, sustainable
ecosystem by restoring natural hydrology, surface topography, and vegetative
communities at the Bank site, and to implement performance standards, monitoring
protocols, and remedial actions as described in this Mitigation Work Plan to ensure the
Bank success. In addition to the 42.0 acres of restored wetlands, the Bank also
includes 21.3 acres of hydric inclusions and 34.8 acres of non-hydric inclusions.
Table 1. Current Habitat Types and Land Use
Habitat Type
Land Use
Acreage
Agricultural Wetlands Agricultural
48.3
Forested Wetlands
Recreational
50.1
ROW
-
12.4
Total
---
110.8
Page 3 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Table 2. Mitigation Bank Habitat Types
Habitat Type
Acreage
Mitigation Type
Bottomland Hardwood
24.4
Re-establishment I
Bottomland Hardwood
4.2
Rehabilitation I
Bottomland Hardwood
13.4
Enhancement I
Bottomland Hardwood
21.3
Hydric inclusion
Uplands
34.8
Non-hydric inclusion
Non-wetland
12.7
Non-mitigation
Total
110.8
---
Total Mitigation and Inclusions 98.1
---
A. Aquatic Resource Type and Functions to be Restored/Enhanced/Preserved
The Sponsor will restore and maintain 42.0 acres of BLH habitat in compliance with the
provisions of this MBI. Restoration will consist of re-establishment, rehabilitation, and
enhancement (Figure 4). The restoration of BLH habitat at the Bank will require that the
Sponsor plant those areas which were previously cleared for agricultural and
silvicultural purposes and which are currently in agricultural use. The Bank also
includes 56.1 acres of hydric and non-hydric inclusions. The remaining 12.7 acres of
non-mitigation features will consist of ROW. Table 2 identifies resource types
(Louisiana Natural Heritage Program descriptions) and acreages to be restored, along
with method of compensation (i.e., re-establishment, rehabilitation, and enhancement,
etc.).
The following is a description of the natural resource types:
·
·
·
·
·
·
Forested, alluvial wetlands occupying broad floodplain areas flanking large
river systems,
Maintained by a natural hydrologic regime of alternating wet and dry periods
that follow seasonal flooding events,
Provide important ecosystem functions including maintenance of water
quality, providing productive habitat for a variety of fish and wildlife species,
and regulation of flooding and stream recharge,
Soils are alluvial deposits, heavy clays to silty clays, high in organic matter
and nutrients,
Dominant forest species can be aggregated into specific associations based
on environmental factors such as physiography, topography, hydric soils, and
hydrologic regimes, and
Vegetation associations are typically mixtures of broadleaf deciduous, needle
leaf deciduous and evergreen trees and shrubs.
Page 4 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Due to hydrologic modification of the natural drainage patterns, Bank lands are currently
hydrologically impaired due to drainage swales. Water which would have naturally
sheetflowed across Bank lands is currently conveyed to Ash Slough via drainage
swales (Figure C3).
Restoration efforts will include re-establishing a more natural hydrologic regime for the
Bank lands. The filling of drainage swales will restore sheetflow across the property
(Figures C4 and C4a-b). Water that is currently flowing through drainage swales will be
allowed to sheetflow across the site and into Ash Slough, as it did historically.
Reforestation efforts associated with re-establishment, rehabilitation, and enhancement
will utilize one-year old seedlings (acquired from nurseries utilizing stock grown from
local seed sources) which are representative of a species assemblage historically
common to bottomlands hardwoods of the area. This species assemblage is identified
in The Natural Communities of Louisiana published in 2009 by the Louisiana
Department of Wildlife and Fisheries (LDWF) and the Louisiana Natural Heritage
program (LNHP). BLH forests are forested, alluvial wetlands occupying broad
floodplain areas that flank large river systems. BLH forests may be called fluctuating
water level ecosystems characterized and maintained by a natural hydrologic regime of
alternating wet and dry periods. These forests support distinct assemblages of plants
and animals associated with particular landforms, soils, and hydrologic regimes. They
are important natural communities for maintenance of water quality, providing a very
productive habitat for a variety of fish and wildlife, and are important in regulation of
flooding and stream recharge. Trees of these species which are commercially available
will be utilized. Table 3 identifies the species assemblage to be planted.
B. Watershed Contributions
1. Watershed Need
The ASHMB I site is located in the Bayou Sara-Thompson Creek watershed, specifically
within the drainage area of the headwaters of Ash Slough.
Through these improvements, the Bank will be capable of sustaining wetland functions,
values, and services in accordance with an IRT-approved plan and this MBI. The
functional benefit to the Bayou Sara-Thompson Creek watershed will include an
increase in the quantity and quality of BLH habitat for resident and migratory wildlife and
the conversion of the Bank to a more natural ecosystem. In the future, and as more
commercial, industrial and residential development occurs in the vicinity, the Bank will
provide an increased functional value with respect to the reduction of flooding and the
reduction of point source pollution within the watershed.
Page 5 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
2. Watershed Benefits
The Bank will also benefit the Bayou Sara-Thompson Creek watershed through the
retention of surface water runoff, stream flow maintenance, nutrient cycling, aquatic
productivity, improved plant and wildlife habitat, and the reduction of non-point source
pollution (nutrients and suspended solids) originating from agricultural activities.
The restoration work will increase the wetland functions over that currently performed by
the Bank in its current condition. The Sponsor would offer the credits produced from
this lift as compensation for wetland losses resulting from work authorized by
Department of the Army (DA) permits.
III. Site Selection
This site was selected based on its proximity and direct connectivity to existing
water resources. Additionally, this site was historically bottomland hardwood, but was
hydrologically disconnected from natural hydrological patterns due to the construction of
drainage features.
The goal of this Bank is to remove the site from agricultural use and to restore
42 acres (re-establish 24.4 acres, rehabilitate 4.2 acres, and enhance 13.4 acres) of
pasture to a high-quality, self-sustaining bottomland hardwood forested wetland
ecosystem that exhibits natural species composition and supports a wildlife habitat
typical of healthy bottomland hardwoods. The restoration and protection of BLH
ecosystems will be accomplished through the restoration of agricultural land underlain
by hydric soils and hydrological restoration.
Establishment of this Bank will include an increase in the quantity and quality of BLH
habitat for resident wildlife and the conversion of the site to a more natural ecosystem.
The majority of adjacent lands are currently used for agriculture, residential, and
commercial purposes; therefore, this Bank will establish a refuge for wildlife.
The quality of downstream receiving waters (Subsegment LA040103 Comite Riverentrance of White Bayou to Amite River) has previously been identified by the Louisiana
Department of Environmental Quality (LDEQ) as being impaired for Primary Contact
Recreation (PCR) use due to fecal coliform, with suspected sources of impairment listed
as onsite treatment (septic) systems and sanitary sewer overflows (collection system
failures). A Total Maximum Daily Load (TMDL) was completed for Subsegment
LA040103 for fecal coliforms on March 28, 2012. The cessation of agricultural activities
along with removal of drainage swales, degrading access roads, and planting of trees
for this project will aid in meeting the current and future TMDLs through the resulting
water quality improvements due to increased filtration and plant uptake (i.e., nonpoint
source pollution prevention).
Page 6 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
IV. Site Protection Instrument
(See Section X. Long-Term Protection and Maintenance, Subsection A. "Conservation
Servitude" of this MBI.)
V. Baseline Information
This section contains both the historical and current ecological and physical
information about the Bank Site.
A. Land Use
1. Historical Land Use
ASHMB I lands were historically bottomland hardwoods, which were cleared for
silvicultural and agricultural use prior to 1970. This is confirmed by aerial photography
maintained by CEMVN. According to the landowner, the site has been used for
agricultural activities (currently cattle grazing and hay production) only for over 60 years.
2. Current Land Use
Bank lands are currently in agricultural use as pasture. Adjacent land use is
predominately agricultural and residential (Figure C5).
B. Soils
The soil types present at the Bank, as identified in the East Baton Rouge Parish Soil
Survey, include:
·
·
·
·
Frost silt loams, occasionally flooded (FrA and FoA) zero to one percent
slopes (approximately 20 percent of Bank area);
Oprairie silts (OpA) zero to three percent slopes
(approximately 10 percent of Bank area);
Deerford-Verdun complex (DaA) zero to two percent slopes
(approximately 30 percent of Bank area); and
Jeanerette silt loam (JeA) zero to one percent slopes
(approximately 40 percent of Bank area).
Frost silt loam soils are poorly drained and slowly permeable soils found on broad flats
and depressions. Oprairie silt loams are somewhat poorly drained and slowly
permeable soils found throughout the parish. Deerford-Verdun complexes are
somewhat poorly drained and very slowly permeable soils covering two-thirds of the
parish.
Page 7 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Field investigations and a wetland delineation conducted in 2014 confirmed these soil
types, along with hydric indicators. Figure C6 presents the current soil types within the
project area.
Hydric soils indicate that the site is inundated or saturated for at least 14 consecutive
days per year. During the months of December to April: Frost silt loam soils typically
have a water table between the surface and 1.5 feet below the surface and Oprairie
silts typically have a water table between 1.0 and 2.0 feet below the surface.
Agricultural use of this property in the past has likely modified soils through the loss of
organic material due to traditional cultivation, loss of biomass and leaf litter, and
increased runoff.
C. Hydrology
1. Historical Hydrology and Drainage Patterns
Prior to the construction of drainage swales, surface water on the site was able to pond
in depressions or sheetflow across the site into Ash Slough.
2. Existing Hydrology and Drainage Patterns
The ASHMB I site is located in the Bayou Sara Thompson Creek watershed. The site
is currently in agricultural use as livestock pasture and utilized for hay production. The
headwaters of Ash Slough are located at the northeastern corner of the site, with Ash
Slough generally flowing through the property toward the southeast (to Cypress Bayou
and thence to the Comite River). An unnamed drainageway passes through the center
of the property and connects to Ash Slough near the northeast corner of the site.
Water which would have naturally sheetflowed across Bank lands is currently conveyed
to Ash Slough by drainage swales. Current and proposed drainage patterns are
depicted on Figures C3 and C4.
CEMVN issued jurisdictional determination # MVN-2014-00915-SK for the Bank on July
7, 2014, which concluded that the Bank is comprised of approximately:
·
·
·
Section 404 Wetlands: 28.24 acres,
Non-Wetlands: 81.94 acres, and
Open water: 0.61 acres.
Page 8 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
D. Vegetation
1. Historical Plant Community
Plant species which were likely present on the site historically (based on existing
forested areas which have persisted since the 1940's) include:
·
·
·
·
·
·
·
·
·
·
Cherrybark Oak (Quercus pagoda Raf.)
Laurel oak (Quercus laurifolia Michx.)
Willow Oak (Quercus phellos L.)
Nuttall Oak (Quercus texana Buckley)
Water Oak (Quercus nigra L.)
Drummond Red Maple (Acer rubrum L. var. drummondii (Hook. & Arn. ex Nutt.)
Sarg.)
American Elm (Ulmus americana L.)
Sweetgum (Liquidambar styraciflua L.)
Baldcypress (Taxodium distichum (L.) Rich.)
Green Ash (Fraxinus pennsylvanica Marsh.)
2. Existing Plant Community
Dominate vegetation within forested areas are laurel oak (Quercus laurifolia), water oak
(Quercus nigra), slippery elm (Ulmus rubra), honey locust (Gleditsia triacanthos), water
hickory (Carya Aquatica), sugarberry (Celtis laevigata), and Chinese tallow (Triadica
sebifera).
Dominate vegetation within cleared agricultural areas consists of bahiagrass (Paspalum
notatum), leathery rush (Juncus coriaceus), and common rush (Juncus effusus).
VI. Description of Work
This Bank will provide 42.0 acres of bottomland hardwood forest to compensate
for unavoidable wetland impacts for the Bayou Sara Thompson Creek watershed
area. In order to accomplish this task, the Sponsor shall complete the following
soils/hydrologic and habitat work.
A. Soils/Hydrologic Work Plan
Hydrologic restoration will consist of the restoration of natural surface flow and stream
flow on the Bank in a manner that mimics natural hydrology observable at undisturbed
bottomland hardwood forests.
Page 9 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Drainage Swales:
Currently, precipitation runoff is conveyed to Ash Slough via drainage swales. Removal
of these features will contribute to the ability of runoff on-site to sheetflow across the site
re-establishing a more natural regime.
Spoil bank material excavated during the construction of the drainage swales will be
used to fill all drainage swales to natural grade. Figure C4 presents the location of
drainage swales to be removed.
The Sponsor will implement temporary seeding for stabilization of bare soils as needed
during Bank establishment/construction.
B. Vegetation
The site will be reforested with an assemblage of species tailored to mimic native
bottomland hardwood forests in this area. Table 3 identifies the species assemblage to
be planted. Species will be planted in a random mixture as dictated by terrain and by
edaphic conditions. Single species row plantings will be avoided.
Species assemblages to be planted are representative of species assemblages
historically common to surrounding bottomland hardwood forests of the area. For
verification, the identified assemblages were cross-referenced with those identified in
East Baton Rouge Parish in the USDA/NRCS PLANTS online database. Reference
sites were found to be consistent with bottomland hardwood forests described in The
Natural Communities of Louisiana (Louisiana Natural Heritage Program, August 2009,
available at: http://www.wlf.louisiana.gov).
Table 3.
Species Assemblages to be Planted
Common
Name
(USDA)
Observed
on site
Recorded In
East Baton
Rouge Parish
(USDA)
Wetland
Indicator
Status Region
2 (USDA)
Percent
Composition
Quercus nigra L.
Water oak
Yes
Yes
FAC
15%
Quercus pagoda Raf.
Cherrybark
oak
Yes
Yes
FAC+
10%
Quercus texana Buckley
Nuttall oak
No
Yes
FACW
10%
Quercus phellos L.
Willow oak
Yes
Yes
FACW-
10%
Quercus laurifolia Michx.
Laurel oak
Yes
Yes
FACW
10%
Quercus michauxii Nutt.
Swamp
chestnut oak
Yes
Yes
FACW
10%
Liquidambar styraciflua L.
Sweetgum
Yes
Yes
FAC+
5%
Scientific Name
Bottomland Hardwood
Page 10 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Celtis laevigata.Willd.
Sugarberry
Yes
Yes
FACW
5%
Ulmus americana L.
American elm
Yes
Yes
FACW
5%
Acer rubrum L. var. drummondii
(Hook. & Arn. Ex Nutt.) Sarg.
Drummond's
maple
Yes
Yes
OBL
5%
Carya aquatica (Michx.) Nutt.
Water hickory
Yes
Yes
OBL
5%
Taxodium distichum (L.) Rich.
Bald Cypress
No
Yes
OBL
5%
Fraxinus pennsylvanica Marsh.
Green ash
No
Yes
FACW
5%
Re-establishment and Rehabilitation Areas:
For those 28.6 acres of non-wetland and wetland agricultural pastures and cleared
wetland pasture which are proposed for as re-establishment and rehabilitation, an
appropriate combination of hard and soft mast producing bare-root stock will be planted.
Vegetative plantings will be used to restore natural vegetation throughout the property.
One year old bare-root seedlings obtained from a registered, licensed regional nursery,
and of regional eco-type species properly stored and handled to ensure viability, will be
planted during the period November through March (planting season). Events such as
spring flooding may warrant temporary storage of the seedlings and delay of planting
until late spring or early summer. If listed seedling species are not available,
substitutions may be made if the substitutions are approved by the IRT. The anticipated
schedule for planting is the non-growing season of 2015-2016.
Proposed planting spacing in areas designated as re-establishment and rehabilitation
will be 9'x 9' (for an initial density of 538 trees per acre) of bare-root stock. Hard mast
species will be planted so that they comprise not less than 50 percent, but not more
than 70 percent, of the planted seedlings. If overstocking of soft mast occurs due to
adjacent forested areas, the Sponsor will conduct adaptive management/thinning of soft
mast as needed to correct the hard mast to soft mast ratio. Initial / interim planting
success rates for re-establishment and rehabilitation areas will be a minimum of 250
trees per acre. Long-term success for all replanted areas will be 80% canopy coverage.
Weedy vegetation within planted areas will be maintained by mowing and/or herbicidal
application through Year 5 (prescribed burning will not be used) with spot treatments
through Year 15 or achievement of long-term success criteria.
Enhancement Areas:
Those 13.4 acres of the Bank which are designated as enhancement are currently
forested with a mix of native and invasive species and grazed by cattle. The Sponsor
will remove the site from agricultural use, remove/control invasive species, enhance
wetland hydrology, and provide supplemental planting of bare-root stock. Invasive
species within enhancement areas will be removed and stumps will be treated with
herbicide. The existing canopy will be assessed with respect to hard to soft mast ratios,
Page 11 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
and trees will be removed as needed. Bare-root stock will be planted to replace those
trees removed and in order to achieve a hard mast percentage of at least 50% but not
more than 70%.
Invasive Species Control:
Planted areas will be maintained, on an as-needed basis, by the use of mechanical or
chemical control or some combination thereof in order to control noxious/exotic species
colonization and competition from other plants.
The Sponsor will eradicate Chinese tallow tree and any other existing noxious/exotic
vegetation on the site by all necessary physical, chemical, or mechanical means on the
Bank. Noxious/exotic vegetation stem density shall be controlled so that it comprises,
on an acre-by-acre basis, not more than one percent of the total stem density.
VII. Maintenance Plan
Maintenance activities will be conducted by the Sponsor during establishment of the
Bank (i.e., until all credits are sold), and the Long-term Steward will conduct
maintenance activities after all credits are sold (see Section III of the MBI
Responsibilities of Parties).
A. The Bank will be monitored through year 50 or later, if canopy cover of 80
percent has not been achieved to prevent re-infestation by noxious/exotic
vegetation. Noxious/exotic vegetation stem density shall be controlled so that
it comprises, on an acre-by-acre basis, not more than one percent of the total
stem density. Section VI.B.7 of the Mitigation Work Plan details the
elimination/control of invasive plants.
B. The property boundary will be monitored and maintained as needed.
Boundary maintenance of the Bank will include the posting of signs to
demarcate the Bank boundary. Fencing will be maintained between the Bank
and any adjacent lands which are grazed.
C. The Owner will make periodic inspections of the property of not less than
once per year to verify that use of the property is consistent with this MBI and
the conservation servitude and to inspect for any damage caused by flood,
fire, storm, wind, accident, vandalism, negligence, or other act or event that
causes damage to the Bank.
VIII. Performance Standards
In order for the Bank to be considered acceptable for mitigating wetland impacts
associated with DA permits, the Property will be restored in accordance with the
Mitigation Work Plan such that it meets wetland criteria as described in the 1987 Corps
Page 12 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
of Engineers Wetland Delineation Manual (the 1987 Manual) as well as the November
2010 Regional Supplement for the Corps of Engineers Wetland Delineation Manual:
Atlantic and Gulf Coastal Plain Region Version 2.0. Performance standards (success
criteria) used to measure the success of the Bank are provided below.
A. Initial Success Criteria
1. Hydrology: Ground surface elevations must be conducive to establishment and
support of hydrophytic vegetation, and re-establishment and maintenance of hydric soil
characteristics. To that end, all alterations of the natural topography (ditching, spoil
banks, land leveling, bedding, fire breaks, etc) that have affected the duration and
extent of surface water have been removed or otherwise rendered ineffective in
accordance with this Mitigation Work Plan.
2. Vegetation: A minimum of 250 planted seedlings per acre must survive through the
end of the second spring following the planting (i.e., Year 1). Those surviving seedlings
must be representative both in species composition and percentage identified in this
Mitigation Work Plan. This criterion will apply to initial plantings, as well as, any
subsequent replanting that may be needed to meet this requirement.
B. Interim Success Criteria
1. Hydrology: By Year 3 (two years following attainment of the one-year survivorship
criteria), site hydrology will be restored such that the property meets the wetland
criterion as described in the 1987 Manual, as well as the November 2010 Regional
Supplement to the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf
Coastal Plain Region Version 2.0. Data demonstrating that wetland hydrology has been
re-established is to be collected by the Sponsor and submitted to CEMVN in the
monitoring report for the interim success criteria.
2. Vegetation and Vegetative Plantings:
a. For a given planting, a minimum of 250 seedlings/saplings per acre must be present
(with a 60 to 40 hard mast to soft mast ratio) at the end of the fourth year (i.e. Year 5)
following successful attainment of the one-year survivorship criteria. Trees established
through natural recruitment may be included in this tally; however, no less that 125 hard
mast-producing seedlings per acre must be present. Surviving hard mast seedlings
must be representative of the species composition and percentage identified in this
Mitigation Work Plan. Exotic/invasive species may not be included in this tally.
b. By Year 5 (four years following successful attainment of the one-year survivorship
criteria), the Bank and the perimeter will be virtually free (approximately 5% or less on
an acre-by-acre basis) of exotic/invasive vegetative species.
c. Developing plant community must exhibit characteristics and diversity indicative of a
viable native forested wetland community commensurate with stand age and site
Page 13 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
conditions by Year 5. Achievement of wetland vegetation dominance is defined as a
vegetation community where more than 50% of all dominant species are facultative
(FAC) or wetter, excluding FAC- plants, using "routine delineation methods" as
described in the 1987 Manual as well as the November 2010 Regional Supplement to
the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf Coastal Plain
Region Version 2.0.
C. Long-Term Success Criteria
1. Forest canopy coverage exceeds eighty percent of forested land mass, as measured
by an approved method. Forest canopy species abundance and composition is
consistent with the restoration goals identified in the restoration plan and credit
assessment methodologies. The long term species composition should fall within the
range of 50:50 to 40:60 soft mast to hard mast ratio.
2. When forest canopy coverage exceeds eighty percent, the Bank will be essentially
void of exotic/invasive vegetation (all seed-producing trees removed from Bank and
perimeter and less than 3% of the understory on an acre per acre basis). An active
treatment program will continue as part of the long-term maintenance program.
3. If thinning to maintain or enhance the ecological value of the Bank is determined
necessary by the IRT at this time, the Sponsor/Steward will develop a thinning plan in
coordination with the IRT. Thinning operations shall be performed by the
Sponsor/Steward per the requirements of the thinning plan.
4. The Sponsor will provide documentation that the "Long-Term Maintenance and
Protection" escrow account is fully funded.
IX. Monitoring Requirements
The Sponsor agrees to perform all work necessary to monitor the Bank to
demonstrate compliance with the success criteria established in this Mitigation Work
Plan. The Sponsor will monitor the Bank in the spring of each monitoring year using the
guidelines in Section VIII of this Mitigation Work Plan.
Surveys of permanent monitoring stations will occur in the following time frame:
1. Immediately following planting of the Bank to establish baseline information.
2. In Years 1, 3, 5 and after achieving interim success criteria, monitoring will occur
every 3 years until an average canopy coverage of 80% is established.
3. If thinning is required after successfully achieving the long-term success criteria,
the site will be surveyed prior to and following the first thinning operation
following plantings.
Page 14 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
If monitoring for any given year determines that the Bank is not progressing as
expected, monitoring will continue on an annual basis until the Bank successfully meets
or exceeds established milestones. After achieving the interim success criteria,
monitoring will occur every 3 years until average canopy coverage of 80% is obtained.
If thinning is required after successfully achieving the long-term success criteria, the site
will be surveyed prior to and following the first thinning operation following plantings.
The survey of the permanent monitoring stations will collect data to evaluate the
survival rate of planted vegetation; number, species and growth rates (average heights
and diameter). In addition to planted seedlings, surveys will include the number by
species of volunteering trees, shrubs and woody vines. Surveys will also collect
information regarding colonizing plant species, the wetland plant status (scaled from
obligate (OBL) to upland (UPL) of each and the number by species of exotic/noxious
specimens.
A. Permanent circular monitoring stations
Immediately following initial planting of the Bank, the Sponsor will randomly
establish a permanent circular monitoring station for every 20 acres on the Bank. Each
station will have a minimum area of 1/20th acre (radius=26 feet). Stations will be
identified with a permanent marker (e.g., an 8-foot PVC pipe anchored with a metal
T-post at plot center) and GPS coordinates will be recorded for each station. A map will
be provided to CEMVN (See Reporting Protocols below) that depicts the location of the
monitoring stations as well as a coordinating list containing the coordinates for each
station. All individual planted seedlings/saplings falling within each monitoring station
will be marked with a numbered tag that uniquely identifies each seedling. A
document providing seedling information shall be presented (to CEMVN) for each
monitoring station and this document shall not only list the specific tag number for each
seedling within the monitoring station, but also the species (by scientific and common
name), height, diameter, wetland rating, hard mast or soft mast categorization, and
general condition of each stem.
To establish baseline information this data will be obtained immediately following
the initial planting of the Bank site or phase of the Bank.
B. Transects
The Sponsor shall establish transects along planted rows to be used to determine
overall survivorship of planted seedlings. Transects shall make up approximately 3% of
the total number of rows and arranged so that a representative sample of the entire
track is obtained. The beginning and ending points of each transect shall be marked
with a permanent marker (e.g., an 8-foot PVC pipe anchored with a metal T post) and
GPS coordinates shall be recorded for these points.
Page 15 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
To establish baseline information transects will be surveyed to determine the
number by species of planted seedlings within 60 days of planting. Transects will be
surveyed until successful attainment of the interim success criteria. Initial and interim
transect surveys shall record the species present, the number of living seedlings for
each species, the wetland indicator status of each species, the mast type of each
species and describe the general condition of the seedlings. Any failed areas of
plantings should be noted along with an explanation for the failure.
C. Soil Profile
The Sponsor will collect data on the hydrologic conditions of the Bank as
necessary. Sufficient data shall be provided to accurately demonstrate variations in soil
conditions. Information to demonstrate hydric properties within the soil shall be
provided as a description of the upper 12 inches of the soil profile. Such data will be
presented as points with GPS coordinates for each point, a hydric indication for each
point, and an explanation to support the information for each point. This information
shall also be provided on a referenced map included as an attachment.
The Sponsor will be required to submit a Corps issued JD (at Year 3) to show
that the Property meets the wetland criterion as described in the 1987 Manual as well
as the Regional Supplement of the Corps of Engineers Wetland Delineation Manual:
Atlantic and Gulf Coastal Plain Region Version 2.0.
D. Floristic Survey
To document the attainment of the long-term success criteria the Sponsor will
complete a comprehensive floristic survey for the Bank as part of the monitoring
requirements.
A floristic survey should be comprehensive over the entire site, and should be
conducted using systematic field techniques. This survey should provide a list of plants
and communities existing on the site. If adverse conditions such as disease, drought,
predation, or herbivory, etc. exist and have impacted the plantings then this information
and these conditions need to be discussed in the report.
E. Photographs
Digital images shall be taken from ground level at each monitoring station and
from elevated positions throughout the Bank to document overall conditions. These
ground level images should provide a North, South, East and West image for each
station.
Page 16 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
F. Qualitative Analysis
The Sponsor shall evaluate the entire extent of the Bank (or phase of the Bank
that this report represents) and provided observations concerning overall seeding
survivorship, colonization of the Bank by volunteer plant species, wildlife utilization and
any other information that is pertinent to achievement of initial success criteria.
G. Hydrologic Conditions
A description of the condition of any applicable hydrology altering features
(culverts, ditches, plugs, etc.) and a general discussion of hydrologic conditions at
monitoring stations shall be provided.
H. Ledgers
The Sponsor will utilize the Regulatory In-Lieu Fee and Bank Information
Tracking System (RIBITS) as a ledger to show all transactions. The Sponsor will input
the following information: transaction date, permittee name, credits/acres sold, and DA
permit number. No other reporting measures are required.
X. Monitoring Reports
Independent of the As-built Report, the Sponsor will submit monitoring reports
documenting monitoring efforts at the Bank to the CEMVN by July 31st of the year
monitoring occurs. Besides monitoring results for that monitoring year, reports will
include a financial assurance report documenting withdrawals and deposits. The
monitoring reports will follow the guidelines listed below:
The monitoring report will include data sufficient for comparison to the
performance standards found in Section VIII. of this Work Plan. The Sponsor shall also
include, in these reports, a discussion of all activities which took place at the Bank.
A. As-Built Report
An as-built report will be submitted to CEMVN within 60 days following
completion of all work required to restore or enhance special aquatic sites. The as-built
report will describe in detail the work performed and provide a list of species planted,
the number of each species, the hard or soft mast categorization, and the wetland
rating. No deviation from the Mitigation Work Plan may occur without prior approval
from the IRT. The as-built report will include a discussion of the coordination with IRT
members, a description of and reasons for any approved deviation. The as-built report
shall provide:
Page 17 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
a. A survey showing finished grades and plantings with written documentation,
plan view and cross sectional drawings of all construction and establishment
work implemented on the bank.
b. Survey data collected from the permanent monitoring stations and the transects.
This survey data should include the number and species of the seedlings planted,
timing of all work events, and maps showing the location (including latitude/longitude) of
all monitoring stations as described in this Work Plan. .
c. Detailed descriptions of site preparation, planting procedures, etc.
B. Initial Success Criteria Report
The Sponsor shall monitor the Bank in the spring (March 15-May 31) of its
second growing season following initial planting of the Bank. The Sponsor will provide
an Initial Success Criteria Report by July 31st of that year.
The Sponsor shall provide details in accordance with this Mitigation Work Plan,
on any maintenance/management work conducted on the Bank after submission of the
As-Built Report. The Sponsor shall provide a brief description of any anticipated
maintenance/management work to be conducted prior to attainment of interim success
criteria.
1. Vegetation
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings
falling within each permanent circular monitoring plot as described and as established in
accordance with Section IX. of this Mitigation Work Plan. A description of the general
condition of the seedlings, including the number and species of surviving seedlings in
each monitoring station, the tag number and a discussion of likely causes of mortality
for the non-survivors shall be provided. A number (by species) of exotic/invasive
species, including, a description of the generalized degree of distribution and whether
they are seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in IX.B of this Mitigation Work Plan. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and whether they are seed bearing trees or
seedlings.
Page 18 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
2. Hydrologic Data
The Sponsor shall provide a description of the condition of any applicable
hydrology altering features (culverts, ditches, plugs, etc.) and a general discussion of
hydrologic conditions at monitoring stations.
3. Photographs
The Sponsor must submit digital photographs in accordance with section IX.E. of
this Mitigation Work Plan.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in IX.F.
of this Mitigation Work Plan.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial
account statements for both the financial assurance accounts and the Long-term
Maintenance and Protection Fund. If any escrowed funds were used, the Sponsor will
include a narrative describing that use, the justification for that use and supporting
documentation (e.g. receipts). The Sponsor shall also provide any justification for any
requested release from financial assurance accounts.
.
C. Interim Success Criteria Report
The Sponsor shall monitor the Bank in the spring (March 15-May 31) of its third growing
season following attainment of the one-year survivorship criteria for the Bank. The
Sponsor will provide an Interim Success Criteria Report by July 31st of that year.
1. Vegetation
Note: For a given planting, a minimum of 250 seedlings/saplings per acre must be
present at the end of the fourth year (i.e. Year 5) following successful attainment of the
one-year survivorship criteria. Trees established through natural recruitment may be
included in this tally; however, no less than 125 hard mast-producing seedlings per acre
must be present. Surviving hard mast seedlings must be representative of the species
composition and percentage identified in this Mitigation Work Plan. Exotic/invasive
species may not be included in this tally.
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings
falling within each permanent circular monitoring plot as described and as established in
Page 19 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
accordance with Section IX. of this Mitigation Work Plan. A description of the general
condition of the seedlings, including the number and species of surviving seedlings in
each monitoring station, the tag number and a discussion of likely causes of mortality
for the non-survivors shall be provided. A number (by species) of exotic/invasive
species, including, a description of the generalized degree of distribution and whether
they are seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in IX.B of this Mitigation Work Plan. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and whether they are seed bearing trees or
seedlings.
2. Hydrologic Data
By Year 3, two years following attainment of the one-year survivorship criteria,
the Sponsor must provide a corps issued wetland determination to prove that site
hydrology has been restored such that the Property meets the wetland criterion as
described in the 1987 Manual as well as the November 2010 Regional Supplement to
the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf Coastal Plain
Region Version 2. The Sponsor shall submit a wetland delineation report and a request
for a jurisdictional determination to CEMVN.
3. Photographs
The Sponsor must submit digital photographs in accordance with section IX.E. of
this Mitigation Work Plan.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in IX.F.
of this Mitigation Work Plan. The Sponsor shall provide details on any
maintenance/management work conduction on the Bank after submission of the Initial
Success Criteria Report. The Sponsor shall provide a brief description of any
anticipated maintenance/management work to be conducted prior to attainment of longterm success criteria. Note: By year 5, four years following successful attainment of the
one-year survivorship criteria, the developing community must exhibit characteristics
and diversity indicative of a viable native forested wetland community commensurate
with stand age and site conditions; the Bank and the perimeter will be virtually free
(approximately 5% or less on an acre-by-acre basis) of exotic/invasive vegetation.
Page 20 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial
account statements for both the financial assurance accounts and the Long-term
Maintenance and Protection Fund. If any escrowed funds were used, the Sponsor will
include a narrative describing that use, the justification for that use and supporting
documentation (e.g. receipts). The Sponsor shall also provide any justification for any
requested release from financial assurance accounts.
D. Long Term Success Criteria Report
1. Vegetation
Note: For a given planting, a minimum of 250 seedlings/saplings per acre must be
present at the end of the fourth year (i.e. Year 5) following successful attainment of the
one-year survivorship criteria. Trees established through natural recruitment may be
included in this tally; however, no less than 125 hard mast-producing seedlings per acre
must be present. Surviving hard mast seedlings must be representative of the species
composition and percentage identified in this Mitigation Work Plan. Exotic/invasive
species may not be included in this tally.
a. Permanent Circular Plot Data
The Sponsor shall provide plot data in tabular form on all planted seedlings
falling within each permanent circular monitoring plot as described and as established in
accordance with Section IX. of this Mitigation Work Plan. A description of the general
condition of the seedlings, including the number and species of surviving seedlings in
each monitoring station, the tag number and a discussion of likely causes of mortality
for the non-survivors shall be provided. A number (by species) of exotic/invasive
species, including, a description of the generalized degree of distribution and whether
they are seed bearing trees or seedlings will also be provided.
b. Transect Data
The Sponsor shall provide data in tabular form for the total number of planted
seedlings as described in IX.B of this Mitigation Work Plan. A description of the general
condition of the seedlings and the discussion of likely causes of mortality, if appropriate
shall also be provided. Exotic/invasive species should be noted along with information
on the generalized amount of each and whether they are seed bearing trees or
seedlings.
2. Hydrologic Data
Note: By Year 3, two years following attainment of the one-year survivorship
criteria, the Sponsor must provide a corps issued wetland determination to prove
Page 21 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
that site hydrology has been restored such that the Property meets the wetland
criterion as described in the 1987 Manual as well as the November 2010 Regional
Supplement to the Corps of Engineers wetland Delineation Manual: Atlantic and Gulf
Coastal Plain Region Version 2. The Sponsor shall submit a wetland delineation report
and a request for a jurisdictional determination to CEMVN.
Provide supporting documentation that the hydrology achieved at year three still
exists on the site.
3. Photographs
The Sponsor must submit digital photographs in accordance with section IX.E. of
this Mitigation Work Plan.
4. Qualitative Analysis
The Sponsor must provide a qualitative analysis of the site as described in IX.F.
of this Mitigation Work Plan. The Sponsor shall provide details on any
maintenance/management work conduction on the Bank after submission of the Initial
Success Criteria Report. The Sponsor shall provide a brief description of any
anticipated maintenance/management work to be conducted prior to attainment of longterm success criteria. Note: By year 5, four years following successful attainment of the
one-year survivorship criteria, the developing community must exhibit characteristics
and diversity indicative of a viable native forested wetland community commensurate
with stand age and site conditions; the Bank and the perimeter will be virtually free
(approximately 3% or less on an acre-by-acre basis) of exotic/invasive vegetation.
5. Funding
The Sponsor shall provide CEMVN with copies of the most recent financial
account statements for both the financial assurance accounts and the Long-term
Maintenance and Protection Fund. If any escrowed funds were used, the Sponsor will
include a narrative describing that use, the justification for that use and supporting
documentation (e.g. receipts). The Sponsor shall also provide any justification for any
requested release from financial assurance accounts.
XI. Bank Credits
A. Credit Determination
Credits in the Bank were determined using an approved method put forth by
CEMVN prior to Bank approval. Results will be included as Attachment MWP-B. In
addition, CEMVN may also use best professional judgment in the determination of such
credits.
Page 22 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
B. Schedule of Credit Availability
Upon submittal of all appropriate documentation by the Sponsor, and
subsequent approval by CEMVN in consultation with the IRT, CEMVN will release
credits for use by the Sponsor according to the following schedule:
1. Thirty percent (30%) of total anticipated project credits will be available for debiting
upon confirmation that all items in Section XI. F (1-7) of the MBI have been completed.
2. An additional twenty percent (20%) of total anticipated credits will be available for
debiting upon providing documentation that the vegetative plantings have been
conducted and completion of the work necessary to restore site topography and wetland
hydrology of the Bank as outlined in Section VI. of this Work Plan.
3. An additional twenty percent (20%) of the total anticipated credits would be released
upon successfully completing the initial success criteria (Section VIII. A.)
4. An additional twenty percent (20%) of the total anticipated credits would be released
upon successfully completing the interim success criteria (Section VIII B.).
5. The remaining ten percent (10%) of the total anticipated credits would be released
once the long-term success criteria (Section VIII. C.) are met.
XII. Adaptive management plan
If seedling survival falls below the target survival criteria or if target species ratios are
not met, the Sponsor shall address the causes of mortality before replacing all lost
seedlings of the appropriate species during the following planting season. Replanting,
monitoring and reporting, as previously described, shall occur as needed to achieve and
document the required survival rate. No additional credits will be released until it is
determined by CEMVN that seedling replanting has achieved the required survivorship
success criteria.
If the survival criteria are not met after three attempts, CEMVN will convene a meeting
of the IRT and the Sponsor to decide if replanting should continue. Should the IRT
determine that achieving the required survival rate would not be likely, the IRT will
reassess the Bank to determine whether its use should be discontinued or if a new
management potential should be calculated incorporating the new conditions. If the IRT
determines that the number of successful mitigation credits remaining in the Bank is
exceeded by the number of mitigation credits sold to permittees, the Sponsor shall
provide replacement mitigation within one year of this decision in an amount equivalent
to the value represented by the credits sold within the unsuccessful areas.
Page 23 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
XIII. Long Term Protection and Maintenance
To ensure long-term sustainability of the resource, the Sponsor shall burden the
property with a perpetual conservation servitude as described in Section X of this MBI.
XIV. Funding
Section IX. A of this MBI provides specific details about the funding for the Construction
and Establishment (C & E) Activities for the Bank.
A. Construction and Establishment (C&E) Funds
1. Estimate of C & E Funds Required
Initial construction and establishment costs and ongoing management funds required to
manage and monitor the lands through the first 15 years are outlined in MWP
Attachment C of this Mitigation Work Plan. These costs have been estimated by
identifying costs (based upon mitigation banking experience) associated with individual
tasks necessary to construct, establish, maintain, manage, and monitor (see MWP
Attachment C of this Mitigation Work Plan Cost Structure for Ash Slough Headwaters
Mitigation Bank Addendum I). These costs are then broken down by year in separate
tables in MWP Attachment C for each of construction, establishment, and long-term
maintenance/protection. Funding amounts have been adjusted for inflation every five
years based on the Consumer Price Index. To fund this account, the Sponsor proposes
to establish an escrow account for construction and a separate escrow account for
establishment.
Financial assurances shall be reduced as success criteria are achieved. The value of
the financial assurance to remain will be based on the work a third party may be
required to perform to assure successful attainment of remaining milestones (i.e.,
funding for exotic control, replanting due to failure of plantings, etc.) should the Sponsor
be in default.
The principal amount ($23,437.40) of the Construction Fund will be phased out in a
single transaction. Upon verification by the IRT that the construction work has been
completed, the CEMVN, acting on behalf of the IRT, shall advise the provider of the
financial assurance to release 100 percent ($23,437.40) of the principal amount of the
Construction Fund.
Copies of the annual status of the financial assurances will be provided to CEMVN upon
request and/or in monitoring reports.
The financial assurances shall guarantee payment to a third party, as determined
appropriate by the CEMVN in consultation with the IRT, in the event that the Sponsor
does not fulfill its obligations to perform, as specified in this MBI.
Page 24 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
Payment to Sponsor, or a third party as identified by CEMVN, of a specified amount of
the financial assurances shall be made upon written notification by CEMVN to the
financial institution.
2. C&E Funding Mechanism
To fund this account, the Sponsor proposes to fund a "Construction and
Establishment Fund" escrow account. This account will be administered by a federallyinsured depository that is "well-capitalized" or "adequately-capitalized" as defined in
Section 38 of the Federal Deposit Insurance Act.
3. C & E Release Schedule
The Financial assurances shall be reduced as success criteria are achieved and
the probability decreases that those funds would be needed according to the following
schedule:
1. Upon verification that all hydrologic modifications, construction, and planting as
describe in this Mitigation Work Plan (Attachment C of the MBI) have been completed to
the satisfaction of CEMVN, in consultation with the IRT, CEMVN shall advise the
Sponsor and the financial institution that the C & E financial assurance may be reduced
to $25,823.69.
2. Upon verification by CEMVN, in consultation with the IRT, that the initial success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall advise the Sponsor and the financial institution that the C & E
financial that assurance may be reduced to $23,372.21.
3. Upon verification by CEMVN, in consultation with the IRT, that the interim success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall advise the Sponsor and the financial institution that the C&E
financial assurance may be reduced to $12,172.10.
4. Upon verification by CEMVN, in consultation with the IRT, that the long-term success
criteria have been attained for all tracts to the satisfaction of CEMVN, in consultation with
the IRT, CEMVN shall notify the Sponsor and the financial institution that the remaining
C&E financial assurance may be released to the Sponsor.
B. Long Term Maintenance/Management Funds
1. Long-term Management Needs
To ensure that sufficient funds are available to provide for the perpetual maintenance and
protection of the Bank, the Sponsor is establishing the "Long-Term Maintenance and
Protection" escrow account. This account will be administered by a federally-insured
Page 25 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
depository that is "well-capitalized" or "adequately-capitalized" as defined in Section 38 of
the Federal Deposit Insurance Act. The account will be incrementally funded through
credit sales and shall contain a minimum balance of $55,000.00 by the time 70% of the
total number of credits are sold or upon successful achievement of the Interim Success
Criteria, whichever occurs first. Any accrued interest shall be used in the operation,
maintenance or other purpose directly benefitting the Bank. Only the interest
accumulated may be withdrawn for this purpose. The principal shall not be used and
shall remain as part of the Bank's assets to ensure that sufficient funds are available
should perpetual maintenance responsibilities be assumed by a third party. The Sponsor
or Long-term Steward may withdraw the accumulated interest only with written approval
from CEMVN and may only be used to maintain the Bank. The Sponsor shall provide
copies of depository account statements to CEMVN upon request and within monitoring
reports.
2. Annual Cost Estimates for Long-Term Needs
The cost of long-term management is $25,838.53 from year 16 to year 50. This amounts
to $72,354.29 when adjusted for inflation every five years. Attachment B contains a
description of the necessary work and an itemization of costs to perform the work for long
term management and protection of the Bank.
3. Long-Term Maintenance and Protection Funding Mechanism
To ensure that sufficient funds are available to provide for the perpetual maintenance and
protection of the Bank, the Sponsor is establishing the "Long-Term Maintenance and
Protection" escrow account. This account will be administered by a federally-insured
depository that is "well capitalized" or "adequately capitalized" as defined in Section 38 of
the Federal Deposit Insurance Act. The account will be incrementally funded by deposit
a minimum of $1,309.52 into the account per credit /acre sold at the time of credit sale.
The deposit value per credit/acre must reflect, at a minimum, the total fund value divided
by no more than 90% of anticipated credits. Once the account is fully funded
($55,000.00), no incremental fund per credit sale is required. The account shall be fully
funded by the time 70% of the total number of credits are sold or upon successful
achievement of the Long-term Success Criteria, whichever occurs first. If the Long-term
Success Criteria are met prior to fully funding the escrow account then the Sponsor must
deposit into the escrow account the difference between the amount determined to be full
funding and the account balance difference between the amount determined to be full
funding and the account balance. Documentation that the account is fully funded is a prerequisite for release of the remaining credits following attainment of the Lon-term Success
Criteria as identified in this Mitigation Work Plan. Accrued interest in excess of the value
of the fully funded account may only be used for the administration, operation,
maintenance and/or other purposed that directly benefit the Bank. The principal shall not
be used and shall remain as part of the Bank's assets to ensure that sufficient funds are
available should perpetual maintenance responsibilities be assumed by a third party. The
Sponsor or Long-term Steward may withdraw the accumulated interest only with written
Page 26 of 27
ATTACHMENT C: MITIGATION WORK PLAN
FOR BOTTOMLAND HARDWOOD HABITAT
ASH SLOUGH HEADWATERS MITIGATION BANK - ADDENDUM I
approval from CEMVN and only to be used to maintain the Bank. The Sponsor shall
provide copies of depository account statements to CEMVN upon request and in their
monitoring reports.
Page 27 of 27
¯
Legend
Project Area - 110.8 ac.
0
250
500
750
1,000
Feet
Forested - 50.1 ac.
Pasture - 48.3 ac.
ROW - 12.4 ac.
Existing Conditions
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C1
Date: March 2015
Scale:1:5,000
Source:
¯
Legend
Project Area - 110.8 ac.
Reestablishment (24.4 ac.)
Rehabilitation (4.2 ac.)
Enhancement (13.4 ac.)
Hydric Inclusion (21.3 ac.)
0
250
500
750
1,000
Feet
Non-hydric Inclusion (34.8 ac.)
Non-Mitigation - ROW & Access Roads (12.7 ac.)
Mitigation Types
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C2
Date: March 2015
Scale:1:5,000
Source:
¯
Ash Slo
ugh
Legend
Project Area - 110.8 ac.
0
250
500
750
1,000
Feet
Stream
Flow Direction
Wetlands - 28.24 ac.
Existing Drainage
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C3
Date: March 2015
Scale:1:5,000
Source:
¯
B
C
B
Ash Slo
ugh
A
A
D
Legend
Project Area - 110.8 ac.
Stream
Flow Direction
0
250
500
750
1,000
Feet
Typical Cross-Section
Wetlands - 28.24 ac.
Proposed Drainage
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C4
Date: March 2015
Scale:1:5,000
Source:
CROSS-SECTIONS A'A' & B-B'
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C4a
Date: March 2015
Scale: N/A
Source:
CROSS-SECTIONS A'A' & B-B'
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C4b
Date: March 2015
Scale: N/A
Source:
¯
Legend
1 mile buffer - 3,132 ac.
Project Boundary - 110.8 ac. Project
Boundary - ASHMB
Agriculture - Cropland - Grass Dense
Pine Thicket
Non-Vegetated Urban
Upland Forest - Deciduous
Upland Forest - Evergreen
Upland Forest - Mixed
Upland Scrub/Shrub - Deciduous
Upland Scrub/Shrub - Evergreen
Upland Scrub/Shrub - Mixed
Vegetated Urban
Water
Wetland Barren
Wetland Forest - Deciduous Wetland
Forest - Mixed
0
0.5
1
1.5
2
Miles
Landuse / Land Cover within One Mile Buffer
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C5
Date: March 2015
Scale:1:32,000
Source:
¯
W
UA
JeA
OpA
FoA
OpA
W
FrA
JeA
DaA
DaA
UA
DaA
JeA
Legend
Project Area - 110.8 ac.
DaA - Deerford-Verdun Complex
Netterville St.
f
Greely Rd.
Ra
e
FoA - Frost Silt Loam
O ld
Me
FrA - Frost Silt Loam
OpA - Oprairie Silt
OpA - Oprairie Silt, 0-1% Slope
OpB - Oprairie Silt, 1-3% Slope
UA - Udarents
Abraham Dr.
JeA - Jeanerette Silt Loam
yer R d.
FrA - Frost Silt Loam, Occ. Flooded
0
250
500
750
W - Water
NRCS Soils Map
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C6
Date: March 2015
Scale:1:5,500
Source:
1,000
Feet
¯
Legend
Project Boundary - ASHMB
Project Boundary - ASHMB - Addendum I - 110.8 ac.
Drainage Area (for ASHMB & Addendum I)
0
0.5
1
1.5
2
Miles
Drainage Area
Ash Slough Headwaters Mitigation Bank - Addendum I
East Baton Rouge
Figure: C7
Date: March 2015
Scale:1:40,000
Source:
Financial Assurance for Ash Slough Headwaters Mitigation Bank Addendum I
Site Acreage (Conservation Servitude)
Planted Acreage
Seedlings (Total)
Perimeter Boundary Miles
Hydrology Work (Days)
123.95
42
22596
1.85
7.00
Construction Item Cost
Soil Preparation
Seedlings and Labor
Broadcast Spraying
Hydrology Restoration
Total
Unit
Acre
Tree
Acre
Day
Unit Cost
$25.00
$0.65
$25.00
$950.00
Total Cost
$
1,050.00
$
14,687.40
$
1,050.00
$
6,650.00
$
23,437.40
Establishment Item Cost
Taxes (Annually 15 years)
Invasive Species Control (Spot Treatment)
Mobilization
Monitoring (Initial Success/Vegetation)
Monitoring (Interim Success/Vegetation)
Monitoring (Interim Success/Hydrology)
Long-term Monitoring (10 years)
Boundary Maintenance (15 years)
Total
Unit
Yearly for 16 years
Acre
Yearly for 15 years
Acre
Acre
Plot
Yearly for 10 years (years 5-15)
Mile
Unit Cost
$650.74
$25.00
$100.00
$25.00
$25.00
$1,000.00
$100.00
$225.00
Total Cost*
$
10,411.80
$
1,050.00
$
1,500.00
$
1,050.00
$
1,050.00
$
6,000.00
$
1,000.00
$
416.25
$
22,478.05
Long-Term Fund Annual Costs Years 16-50
Taxes (Annually)
Acre
Invasive Species Control (Spot Treatment) at 1%
Acre
Mobilization
Yearly
Account Maintenance and Misc
10-Year Boundary Maintenance (Annualized)
Mile
Total
* Cost does not reflect inflationary adjustment
** Cost of Mobilization and Account Maintenance cover by ASHMB
Unit Cost
Total Cost
$5.25 $
$25.00 $
$416.25 $
$
650.74
10.50
**
**
77.01
738.24
Financial Assurance (Construction Fund) Year 0
Item
Total Cost at Year 0
5-Year Inflationary Adjustment
Percent of Cost
3.2%
YEAR 0
Soil Preperation
Planting (Seedlings and Labor)
Broadcast Spraying
Hydrology Restoration
Total
Total Per Acre
$
$
$
$
$
$
1,050.00
14,687.40
1,050.00
6,650.00
23,437.40
558.03
$
$
$
$
$
$
1,050.00
14,687.40
1,050.00
6,650.00
23,437.40
558.03
4%
63%
4%
28%
100%
Financial Assurance (Establishment Fund) Year 0 to Year 15
Item
Total Cost at Year 0
YEAR 0
Taxes
YEAR 1
Monitoring (Initial Success/Vegetation)
Mobilization
Taxes
TOTAL - INITIAL SUCCESS CRITERIA1
YEAR 2
Broadcast Spraying (50%)
Mobilization
Taxes
YEAR 3
Monitoring (Interim Success/Hydrology)
Mobilization
Taxes
YEAR 4
Broadcast Spraying (30%)
Mobilization
Taxes
YEAR 5
Monitoring (Interim Success/Vegetation)
Mobilization
Taxes
TOTAL - INTERIM SUCCESS CRITERIA2
YEAR 6
Invasive Species Control (5%)
Mobilization
Taxes
YEAR 7
Invasive Species Control (5%)
Mobilization
Taxes
YEAR 8
Invasive Species Control (2%)
Mobilization
Taxes
YEAR 9
Invasive Species Control (2%)
Mobilization
Taxes
YEAR 10
Invasive Species Control (1%)
Mobilization
Long-term Monitoring
Taxes
Boundary Maintenance
$
5-Year Inflationary Adjustment
Percent of Cost
3.2%
650.74
2.5%
$
$
$
$
1,050.00
100.00
650.74
2,451.48
4.1%
0.4%
2.5%
9.1%
$
$
$
525.00 $
100.00 $
650.74 $
525.00
100.00
650.74
2.0%
0.4%
2.5%
$
$
$
6,000.00 $
100.00 $
650.74 $
6,000.00
100.00
650.74
23.2%
0.4%
2.5%
$
$
$
315.00 $
100.00 $
650.74 $
315.00
100.00
650.74
1.2%
0.4%
2.5%
$
$
$
$
1,229.10
117.06
761.74
11,200.11
4.8%
0.5%
2.9%
41.7%
$
$
$
52.50 $
100.00 $
650.74 $
61.46
117.06
761.74
0.2%
0.5%
2.9%
$
$
$
52.50 $
100.00 $
650.74 $
61.46
117.06
761.74
0.2%
0.5%
2.9%
$
$
$
21.00 $
100.00 $
650.74 $
24.58
117.06
761.74
0.1%
0.5%
2.9%
$
$
$
21.00 $
100.00 $
650.74 $
24.58
117.06
761.74
0.1%
0.5%
2.9%
$
$
$
$
$
10.50
100.00
500.00
650.74
416.25
14.39
137.02
685.12
891.67
570.36
0.1%
0.5%
2.7%
3.5%
2.2%
$
$
$
$
$
$
$
$
650.74 $
1,050.00
100.00
650.74
2,451.48
1,050.00
100.00
650.74
10,892.95
$
$
$
$
$
Financial Assurance (Establishment Fund) Year 0 to Year 15
Item
Total Cost at Year 0
5-Year Inflationary Adjustment
Percent of Cost
3.2%
YEAR 11
Invasive Species Control (1%)
$
10.50 $
14.39
Mobilization
$
100.00 $
137.02
Taxes
$
650.74 $
891.67
YEAR 12
Invasive Species Control (1%)
$
10.50 $
14.39
Mobilization
$
100.00 $
137.02
Taxes
$
650.74 $
891.67
YEAR 13
Invasive Species Control (1%)
$
10.50 $
14.39
Mobilization
$
100.00 $
137.02
Taxes
$
650.74 $
891.67
YEAR 14
Invasive Species Control (1%)
$
10.50 $
14.39
Mobilization
$
100.00 $
137.02
$
650.74 $
891.67
Taxes
YEAR 15
Invasive Species Control (1%)
$
10.50 $
16.84
Mobilization
$
100.00 $
160.40
Long-term Monitoring
$
500.00 $
801.98
Taxes
$
650.74 $
1,043.76
3
TOTAL - YEAR 15 (CANOPY COVER80%)
$
9,133.63 $
12,181.11
Total
$
22,478.05 $
25,832.69
Total Per Acre
$
190.42 $
218.83
1
The total shown for "Initial Success Criteria" includes costs estimated to occur during Year 0 - Year 1.
2
The total shown for "Interim Success Criteria" includes costs estimated to occur during Year 2 - Year 5.
3
The total shown for "Year 15 (Canopy Cover80%)" includes costs estimated to occur during Year 6 - Year 15.
0.1%
0.5%
3.5%
0.1%
0.5%
3.5%
0.1%
0.5%
3.5%
0.1%
0.5%
3.5%
0.1%
0.6%
3.1%
4.0%
46.6%
99.5%
Long-Term Maintenance and Protection Fund anticipated to Year 16 to Year 50 for Ash Slough Headwaters Mitigation Bank Addendum I
Inflation Rate
Total
3.20%
$
55,000.00
Time (Year)
Item
Total Cost at Year 0
5-Year Inflationary Adjustment
Escrow Account Activity
15
$
$
$
55,000.00
16 Annual Cost 16-50
$
738.24 $
1,222.01 $
(1,222.01)
17 Annual Cost 16-50
$
738.24 $
1,222.01 $
(1,222.01)
18 Annual Cost 16-50
$
738.24 $
1,222.01 $
(1,222.01)
19 Annual Cost 16-50
$
738.24 $
1,222.01 $
(1,222.01)
20 Annual Cost 16-50
$
738.24 $
1,386.10 $
(1,386.10)
21 Annual Cost 16-50
$
738.24 $
1,386.10 $
(1,386.10)
22 Annual Cost 16-50
$
738.24 $
1,386.10 $
(1,386.10)
23 Annual Cost 16-50
$
738.24 $
1,386.10 $
(1,386.10)
24 Annual Cost 16-50
$
738.24 $
1,386.10 $
(1,386.10)
25 Annual Cost 16-50
$
738.24 $
1,622.53 $
(1,622.53)
26 Annual Cost 16-50
$
738.24 $
1,622.53 $
(1,622.53)
27 Annual Cost 16-50
$
738.24 $
1,622.53 $
(1,622.53)
28 Annual Cost 16-50
$
738.24 $
1,622.53 $
(1,622.53)
29 Annual Cost 16-50
$
738.24 $
1,622.53 $
(1,622.53)
30 Annual Cost 16-50
$
738.24 $
1,899.29 $
(1,899.29)
31 Annual Cost 16-50
$
738.24 $
1,899.29 $
(1,899.29)
32 Annual Cost 16-50
$
738.24 $
1,899.29 $
(1,899.29)
33 Annual Cost 16-50
$
738.24 $
1,899.29 $
(1,899.29)
34 Annual Cost 16-50
$
738.24 $
1,899.29 $
(1,899.29)
35 Annual Cost 16-50
$
738.24 $
2,223.25 $
(2,223.25)
36 Annual Cost 16-50
$
738.24 $
2,223.25 $
(2,223.25)
37 Annual Cost 16-50
$
738.24 $
2,223.25 $
(2,223.25)
$
738.24 $
2,223.25 $
(2,223.25)
38 Annual Cost 16-50
39 Annual Cost 16-50
$
738.24 $
2,223.25 $
(2,223.25)
40 Annual Cost 16-50
$
738.24 $
2,602.48 $
(2,602.48)
41 Annual Cost 16-50
$
738.24 $
2,602.48 $
(2,602.48)
42 Annual Cost 16-50
$
738.24 $
2,602.48 $
(2,602.48)
43 Annual Cost 16-50
$
738.24 $
2,602.48 $
(2,602.48)
44 Annual Cost 16-50
$
738.24 $
2,602.48 $
(2,602.48)
45 Annual Cost 16-50
$
738.24 $
3,046.39 $
(3,046.39)
46 Annual Cost 16-50
$
738.24 $
3,046.39 $
(3,046.39)
47 Annual Cost 16-50
$
738.24 $
3,046.39 $
(3,046.39)
48 Annual Cost 16-50
$
738.24 $
3,046.39 $
(3,046.39)
49 Annual Cost 16-50
$
738.24 $
3,046.39 $
(3,046.39)
50 Annual Cost 16-50
$
738.24 $
3,566.03 $
(3,566.03)
$
25,838.53 $
72,354.29
* Per the provisions outlined in Section X.C of the Mitigation Work Plan.
Per Acre*
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1,309.52
Investment Acc't Balance
55,000.00
56,087.99
57,221.67
58,402.97
59,633.89
60,752.41
61,917.92
63,132.37
64,397.84
65,716.45
66,854.01
68,039.35
69,274.48
70,561.48
71,902.53
73,023.15
74,190.83
75,407.56
76,675.39
77,996.47
79,049.07
80,145.87
81,288.75
82,479.62
83,720.51
84,634.29
85,586.45
86,578.60
87,612.42
88,689.66
89,368.23
90,075.30
90,812.07
91,579.78
92,379.73
92,693.66
Return
4.20%
Investment Earning
$
$
2,310.00
$
2,355.70
$
2,403.31
$
2,452.92
$
2,504.62
$
2,551.60
$
2,600.55
$
2,651.56
$
2,704.71
$
2,760.09
$
2,807.87
$
2,857.65
$
2,909.53
$
2,963.58
$
3,019.91
$
3,066.97
$
3,116.02
$
3,167.12
$
3,220.37
$
3,275.85
$
3,320.06
$
3,366.13
$
3,414.13
3,464.14
$
3,516.26
$
3,554.64
$
$
3,594.63
$
3,636.30
$
3,679.72
$
3,724.97
$
3,753.47
$
3,783.16
$
3,814.11
$
3,846.35
$
3,879.95