Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Application for Permit Pantano Wash Bank Protection and River Park Phase 3:Tanque Verde Road to Fort Lowell Park

To construct armored bank (Soil Cement) flood protection, a channel grade control structure in Pantano Wash, and a multi-use pathway facility including a pedestrian bridge over Rose Hill Wash.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas