The U.S. Army Corps of Engineers, Albuquerque District, (Corps) is evaluating a permit application for the Gold Basin LLC-C/O Simpson Estates (Gold Basin Mine) to reclaim historic mine disturbed areas and conduct future placer mining and reclamation on an approximately 32.28-acre parcel of property in Chaffee County, Colorado. The project would result in permanently impacts to an approximately 2,500 linear foot reach of the Cache Creek stream channel, which is a tributary of the Arkansas River. Details of the project are provided below and in the attached maps and drawings. The purpose of this public notice is to inform interested parties of the project and to solicit comments.

SUMMARY: The U.S. Army Corps of Engineers, Albuquerque District, (Corps) is evaluating a permit application for the Gold Basin LLC-C/O Simpson Estates (Gold Basin Mine) to reclaim historic mine disturbed areas and conduct future placer mining and reclamation on an approximately 32.28-acre parcel of property in Chaffee County, Colorado. The project would result in permanently impacts to portions of an approximately 2,500 linear foot reach of Cache Creek, which is a tributary of the Arkansas River. Details of the project are provided below and in the attached maps and drawings. The purpose of this public notice is to inform interested parties of the project and to solicit comments. APPLICANT: Laurens Leffingwell, Gold Basin LLC-C/O Simpson Estates, 30 North Lasalle Street, Suite 1232, Chicago, Illinois 60602. AGENT: George Robinson, R Squared, Inc., 3916 North State Highway 67, Sedalia, Colorado 80135. LOCATION: The project is located along Cache Creek in Section 5, T12S-R80W, Chaffee County, Colorado. Latitude 39.033º N, Longitude -106.354º W. BACKGROUND: The Gold Basin Mine is a historic mine dating back to the early 1900s. Historically, mine reclamation was not a common practice until mine reclamation laws were passed in the 1960s. After years of abandonment, the mine obtained its first permit in 1992 authorizing mining activities within a 10-acre permit area alongCache Creekunder the name Gold Basin Mine. In 2013, Gold Basin Mine was acquired by Gold Basin Mine, LLC. DESCRIPTION OF WORK: The applicant proposes to upgrade the 1992 permit to include prior and future mining activities through a Colorado Division of Reclamation Mining and Safety (CDRMS) 112 permit, which will expand the permit area beyond the original 10-acre permit area. The applicant proposes to conduct placer mining and reclamation activities along the stream channel, including a portion of the previouslydisturbed mine site,as authorized and required by CDRMS. In addition to reclamation activities required by CDRMS for new disturbances, the applicant proposes to reclaim portions of historic mine disturbed areas along the stream reach, including restoration of the channel to pre-mine alignment and contours, as estimated by historical aerial imagery. PURPOSE AND NEED: The applicant’s stated purpose and need for the project is to conduct placer mining and reclamation within the existing mine. MITIGATION: The applicant has identified no wetlands along the stream within the project reach, largely due to past disturbances. The existing stream channel is comprised almost entirely of tailings and broken rock with a nearly complete absence of riparian vegetation. The Corps will verify the delineation once seasonal snow melts and, if wetlands are identified within the project area, preparation of a wetland mitigation plan may be required prior to authorization of any impacts to wetlands. PLANS AND DATA: Drawings showing the location of the work site and other data are enclosed with this notice. If additional information is desired, it may be obtained from the applicant, or from: Joshua G. Carpenter U.S. Army Corps of Engineers Southern Colorado Regulatory Office 200 South Santa Fe Avenue, Suite 301 Pueblo, Colorado 81003-4270 (719) 543-6914 Fax No. (719) 543-9475 E-mail: Joshua.G.Carpenter@usace.army.mil CULTURAL RESOURCES: The Corps consulted district files and records, the latest version of the National Register of Historic Places (NRHP), and state records of NRHP-eligible and potentially eligible historic properties to determine if there are any historic properties that may be affected by the proposed undertaking. The project area has not been recently surveyed for historic properties; further identification efforts will likely be required. Based on information contained in the application, the Corps has made a preliminary determination that the proposed project may affect historic properties that meet the criteria for inclusion in the NRHP. The Corps will initiate consultation with the Colorado State Historic Preservation Office (SHPO) to ensure compliance with Section 106 of the NRHP. ENDANGERED SPECIES: The Corps has reviewed the U.S. Fish and Wildlife Service's latest published version of federally-listed endangered and threatened species located in Chaffee County, Colorado to determine if any listed species or their critical habitat may occur in the proposed project area. The Corps has made a preliminary determination that the proposed project will not affect any federally-listed endangered or threatened species or their critical habitat that are protected by the Endangered Species Act. STATE WATER QUALITY CERTIFICATION: The applicant has applied to the Colorado Department of Public Health and Environment for certification that this work is in compliance with applicable State water quality standards. The applicant is responsible for obtaining all other required federal, state, and local authorizations for this work. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit that may be reasonably expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The evaluation of the impact of this activity will include application of the guidelines promulgated by the EPA Administrator under authority of Section 404(b) of the Clean Water Act. All factors relevant to the proposal and the cumulative effects will be considered; among these are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. If the District Engineer determines that the project complies with the 404(b)(1) guidelines, he will grant the permit unless issuance would be contrary to the public interest. In accordance with environmental procedures and documentation required by the National Environmental Policy Act of 1969, an environmental assessment will be prepared for this project. Upon completion, the assessment may be seen at the U.S. Army Corps of Engineers, Albuquerque District Office, at the address given above. COMMENTS: Any comments concerning this project should be received by the District Engineer no later than May 21, 2015. Comments received after the end of the public notice comment period will not be considered. However, more time may be given if a request, with a valid reason, is received prior to the suspense date. The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any person may request a public hearing. The request must be submitted, in writing, to the District Engineer within 21 days of the date of this notice and must clearly set forth the reasons for holding a public hearing.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas