NATURAL GAS LIQUEFACTION AND PIPELINE FACILITIES IN
CALCASIEU, JEFFERSON DAVIS, ACADIA, CAMERON, ALLEN, AND BEAUREGARD PARISHES, LOUISIANA
NAME OF APPLICANT: Lake Charles LNG Company, LLC / Lake Charles LNG Export Company, LLC / Trunkline Gas Company, LLC, Attn: Monica Howard, 1300 Main Street, RM14.030, Houston, TX 77056.
LOCATION OF WORK: Liquefaction facilities are adjacent to the existing Lake Charles LNG Import Terminal in Calcasieu Parish; pipeline facilities are in Calcasieu and Jefferson Davis Parishes. Pipeline components will occur in Calcasieu, Jefferson Davis, Acadia, Cameron, Allen, and Beauregard Parishes, Louisiana. (facility centerpoint: Latitude 30.1210, Longitude -93.2890).
Hydrologic Unit Code: 08080206 – Lower Calcasieu
Hydrologic Unit Code: 08080203 – Upper Calcasieu
Hydrologic Unit Code: 08080202 – Mermentau
Hydrologic Unit Code: 08080201 – Mermentau Headwaters
PROJECT SUMMARY: Construction of new natural gas liquefaction and pipeline facilities and modification of the existing Lake Charles LNG Import Terminal to export LNG.
CHARACTER OF WORK: This work will consist of the major components summarized below.
Liquefaction Facility (Figures 1-4): The Liquefaction Facility will require an approximately 286-acre site. This site will be cleared and permanently filled for ongoing operations, permanently impacting 105.27 acres of wetlands. Additional construction workspaces for the liquefaction facility will comprise four separate locations totaling approximately 325 acres in the immediate area of the Liquefaction Facility, with a permanent wetland impact of 110.15 acres.
LNG Carrier Berth (Figures 5-7): Mooring and breasting dolphins will be modified at the existing west dock, and breasting dolphins will be added to the existing east dock. Two temporary construction docks will be constructed. Approximately 26,000 cubic yards of material will be dredged from the existing basin for onshore disposal at an existing confined disposal facility.
Pipelines: Two new pipelines (one new 6.45-mile pipeline and one new 11.44 mile-pipeline in a new right-of-way) will be installed, and one existing pipeline will be modified. Where pipelines are installed and modified, the proposed activities include clearing rights-of-way, conducting trenching operations, installing various above and below ground pipelines and components, temporarily stockpiling materials, and performing horizontal directional drilling (HDD) operations. Following construction, rights-of-way will be restored to pre-construction grade and allowed to revegetate to the extent allowed under United States Department of Transportation (USDOT) regulations. The 6.45-mile 24-inch Mainline Loop will temporarily disturb 5.72 acres of wetlands and permanently convert 0.01 acre of forested wetland to non-forested wetland (Figures 8-10). The 11.44-mile 42-inch Mainline Connector will temporarily disturb 28.34 acres of wetlands and permanently convert 3.97 acres of forested wetland to non-forested wetland (Figures 11-14). The modifications to Mainline 200-1 will temporarily disturb 19.31 acres of wetland; no permanent impacts are expected (Figure 15). The single contractor yard (Figure 16) will not have wetland impacts.
Compressor Stations: One new compressor station will be constructed (Figure 17) and station piping at one existing compressor station will be modified (Figure 18). Construction of the new compressor station will permanently fill 2.60 acres of wetlands; modification of piping at the existing compressor station will not affect wetlands.
Meter Stations: Three new meter stations will be constructed (Figures 19-21) and five existing meter stations will be modified (Figures 22-25 and the Trunkline/LNG Export Meter on Figure 1). Activities at the meter stations will temporarily disturb 1.70 acres of wetlands, permanently fill 0.38 acre of wetlands, and permanently convert 0.16 acre of forested wetland to non-forested wetland.
Total Impacts: The Project will impact a total of 273.48 acres of jurisdictional wetlands. Of these, approximately 218.40 acres will be permanently filled for the liquefaction facilities, additional construction workspaces, and aboveground facilities; no permanent fill is associated with the pipelines. Construction of pipelines and aboveground facilities will temporarily disturb approximately 55.07 acres of wetlands. Approximately 4.14 acres of forested wetlands will be permanently converted to non-forested wetlands within the pipeline rights-of-way and aboveground facilities.
Mitigation: The applicant proposes to compensate for unavoidable project-related wetland impacts through a Permittee-Responsible Mitigation (PRM) project in the Lower Calcasieu Watershed, involving approximately 559 acres of coastal prairie and bottomland hardwood habitat restoration (details under development with appropriate resource agencies), and credit purchase from a USACE-approved Mitigation Bank.
JOINT PUBLIC NOTICE
May 11, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1938
Brian.W.Breaux@usace.army.mil
Project Manager
Brian Breaux
Permit Application Number
MVN 2014-01575 MB
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 150423-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
NATURAL GAS LIQUEFACTION AND PIPELINE FACILITIES IN
CALCASIEU, JEFFERSON DAVIS, ACADIA, CAMERON, ALLEN, AND BEAUREGARD
PARISHES, LOUISIANA
NAME OF APPLICANT: Lake Charles LNG Company, LLC / Lake Charles LNG Export Company,
LLC / Trunkline Gas Company, LLC, Attn: Monica Howard, 1300 Main Street, RM14.030, Houston,
TX 77056.
LOCATION OF WORK: Liquefaction facilities are adjacent to the existing Lake Charles LNG Import
Terminal in Calcasieu Parish; pipeline facilities are in Calcasieu and Jefferson Davis Parishes.
Pipeline components will occur in Calcasieu, Jefferson Davis, Acadia, Cameron, Allen, and
Beauregard Parishes, Louisiana. (facility centerpoint: Latitude 30.1210, Longitude -93.2890).
Hydrologic Unit Code: 08080206 Lower Calcasieu
Hydrologic Unit Code: 08080203 Upper Calcasieu
Hydrologic Unit Code: 08080202 Mermentau
Hydrologic Unit Code: 08080201 Mermentau Headwaters
PROJECT SUMMARY: Construction of new natural gas liquefaction and pipeline facilities and
modification of the existing Lake Charles LNG Import Terminal to export LNG.
CHARACTER OF WORK: This work will consist of the major components summarized below.
Liquefaction Facility (Figures 1-4): The Liquefaction Facility will require an approximately 286-acre
site. This site will be cleared and permanently filled for ongoing operations, permanently impacting
105.27 acres of wetlands. Additional construction workspaces for the liquefaction facility will
comprise four separate locations totaling approximately 325 acres in the immediate area of the
Liquefaction Facility, with a permanent wetland impact of 110.15 acres.
LNG Carrier Berth (Figures 5-7): Mooring and breasting dolphins will be modified at the existing west
dock, and breasting dolphins will be added to the existing east dock. Two temporary construction
docks will be constructed. Approximately 26,000 cubic yards of material will be dredged from the
existing basin for onshore disposal at an existing confined disposal facility.
Pipelines: Two new pipelines (one new 6.45-mile pipeline and one new 11.44 mile-pipeline in a new
right-of-way) will be installed, and one existing pipeline will be modified. Where pipelines are installed
and modified, the proposed activities include clearing rights-of-way, conducting trenching operations,
installing various above and below ground pipelines and components, temporarily stockpiling
materials, and performing horizontal directional drilling (HDD) operations. Following construction,
rights-of-way will be restored to pre-construction grade and allowed to revegetate to the extent
allowed under United States Department of Transportation (USDOT) regulations. The 6.45-mile 24inch Mainline Loop will temporarily disturb 5.72 acres of wetlands and permanently convert 0.01 acre
of forested wetland to non-forested wetland (Figures 8-10). The 11.44-mile 42-inch Mainline
Connector will temporarily disturb 28.34 acres of wetlands and permanently convert 3.97 acres of
forested wetland to non-forested wetland (Figures 11-14). The modifications to Mainline 200-1 will
temporarily disturb 19.31 acres of wetland; no permanent impacts are expected (Figure 15). The
single contractor yard (Figure 16) will not have wetland impacts.
Compressor Stations: One new compressor station will be constructed (Figure 17) and station
piping at one existing compressor station will be modified (Figure 18). Construction of the new
compressor station will permanently fill 2.60 acres of wetlands; modification of piping at the existing
compressor station will not affect wetlands.
Meter Stations: Three new meter stations will be constructed (Figures 19-21) and five existing meter
stations will be modified (Figures 22-25 and the Trunkline/LNG Export Meter on Figure 1). Activities
at the meter stations will temporarily disturb 1.70 acres of wetlands, permanently fill 0.38 acre of
wetlands, and permanently convert 0.16 acre of forested wetland to non-forested wetland.
Total Impacts: The Project will impact a total of 273.48 acres of jurisdictional wetlands. Of these,
approximately 218.40 acres will be permanently filled for the liquefaction facilities, additional
construction workspaces, and aboveground facilities; no permanent fill is associated with the
pipelines. Construction of pipelines and aboveground facilities will temporarily disturb approximately
55.07 acres of wetlands. Approximately 4.14 acres of forested wetlands will be permanently
converted to non-forested wetlands within the pipeline rights-of-way and aboveground facilities.
Mitigation: The applicant proposes to compensate for unavoidable project-related wetland impacts
through a Permittee-Responsible Mitigation (PRM) project in the Lower Calcasieu Watershed,
involving approximately 559 acres of coastal prairie and bottomland hardwood habitat restoration
(details under development with appropriate resource agencies), and credit purchase from a USACEapproved Mitigation Bank.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly notified of
the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total
of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would not affect any species listed as endangered by
the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the
survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for
Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army
Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office,
the Corps has determined that the proposed activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 16.4 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Enclosure
ACW Area A
Proposed
Liquefaction
Facility
ACW Area B
0
«
¬
Trunkline/LNG
Export Meter
«1
¬
LNG Terminal
ACW Area B
ACW Area D
2
¬
«
ACW Area C
«3
¬
Oklahoma
Legend
Arkansas
Mississippi
CALCASIEU
Texas
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
CAMERON
Wetland
10
«
¬
Wetland
Lake Charles
Liquefaction Project
Perennial Stream
Mile Post
0
500 1,000
Feet
Waterbody
K
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Jurisdictional Waters
of the United States
Proposed Liquefaction Facility
Page 1 of 25
Prepared by
4/15/2015
ACWS Area A
Grade at
Elev. 8'
Construction Area
Proposed
Liquefaction
Facility
Offices
Grade at
Elev. 11'
Grade at
Elev. 11'
Flare
Flare
M AT C H L I N E
Grade at
Elev. 8'
Operations
Liquefaction Trains
Grade at
Elev. 11'
Grade at
Elev. 6'
K
0
500
ACWS
Area B
Grade at
Elev. 12'
Grade at
Elev. 11'
1,000
Offices
Feet
ACWS
Area B
Legend
Proposed Liquefaction Facility
Lake Charles
Liquefaction Project
Liquefaction Project Features
Additional Construction Workspace (ACWS)
Access Roads
Cross Section
Proposed Liquefaction
Facility Layout
Sheet 1 of 2
Page 2 of 25
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
4/15/2015
M AT C H L I N E
Operations
Grade at
Elev. 6'
ACWS
Area B
Existing Dredge Spoil
Management Facility
Grade at
Elev. 12'
Offices
Construction Area
ACWS
Area B
Grade at
Elev. 8'
Construction Area
ACWS Area D
Offices
ns
Co
n
ctio
tru
Are
a
Construction Area
ACWS Area C
Offices
Grade at
Elev. 8'
Grade at
Elev. 8'
K
0
500
1,000
Feet
Legend
Proposed Liquefaction Facility
Lake Charles
Liquefaction Project
Liquefaction Project Features
Additional Construction Workspace (ACWS)
Access Roads
Cross Section
Proposed Liquefaction
Facility Layout
Sheet 2 of 2
Page 3 of 25
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
4/15/2015
500'
1000'
1500'
2000'
2500'
3000'
3500'
4000'
2500'
3000'
3500'
4000'
25'
20'
15'
10'
5'
0'
Proposed Liquefaction Facility - North ----> South
500'
1000'
1500'
2000'
25'
20'
15'
10'
5'
0'
Proposed Liquefaction Facility - West ----> East
500'
1000'
1500'
2000'
2500'
3000'
3500'
4000'
2000'
2500'
3000'
3500'
4000'
25'
20'
15'
10'
5'
0'
ACWS Area A - North ----> South
500'
1000'
1500'
25'
20'
15'
10'
5'
0'
ACWS Area B - North ----> South
500'
1000'
1500'
ACWS Area C - North ----> South
2000'
2500'
3000'
3500'
4000'
25'
20'
15'
10'
5'
0'
ACWS Area D - North ----> South
Legend
Lake Charles
Liquefaction Project
Pre-Construction Elevation Profile
Post-Construction Elevation Profile
Proposed Liquefaction
Facility Cross Sections
Page 4 of 25
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
4/15/2015
Page 5 of 25
Page 6 of 25
Page 7 of 25
¬
«
177
¬
«
176
00-3 Loop
Mainline 2
¬
«
178
179
¬
«
Legend
Oklahoma
JE
F
Mississippi
CA
LC
A
SI
E
U
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
Perennial Stream
0
500
Feet
1,000
Waterbody
Lake Charles
Liquefaction Project
Jurisdictional Waters
of the United States
Mainline 200-3 Loop
K
FE
RS
ON
DA
VI
S
Arkansas
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Page 8 of 25
Prepared by
4/15/2015
¬
«
182
¬
«
181
Mainline 200-3 Loop
¬
«
180
Legend
Oklahoma
Mississippi
CA
LC
A
SI
E
U
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
Perennial Stream
0
500
Feet
1,000
Waterbody
Lake Charles
Liquefaction Project
Jurisdictional Waters
of the United States
Mainline 200-3 Loop
K
JE
F
FE
RS
ON
DA
VI
S
Arkansas
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Page 9 of 25
Prepared by
4/15/2015
Appendix 1-G.1b
Typical Right-of-Way
Configuration for
Mainline 200-3 Loop
Page 10 of 25
3
«
¬
¬4
«
«2
¬
i
Ma
C
om
pr
es
so
r
S
ta
t io
n
20
3
eC
nlin
e
onn
r
ct o
1
¬
«
-A
Legend
Oklahoma
Arkansas
Mississippi
Texas
JE
F
FE
R
SO
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
N
D
AV
I
Upland
S
Wetland
Existing Facility
Wetland
10
«
¬
Mile Post
Perennial Stream
0
500
Feet
1,000
Waterbody
K
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Lake Charles
Liquefaction Project
Jurisdictional Waters
of the United States
Mainline Connector
Page 11 of 25
Prepared by
4/15/2015
Not Field Verified
Not Field Verified
Mainline Connector
6
¬
«
5
¬
«
7
¬
«
Legend
Oklahoma
Arkansas
Mississippi
Texas
JE
F
FE
R
SO
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
N
D
AV
I
S
Wetland
Existing Facility
Upland
Wetland
10
«
¬
Mile Post
Perennial Stream
0
500
Feet
1,000
Waterbody
K
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Lake Charles
Liquefaction Project
Jurisdictional Waters
of the United States
Mainline Connector
Page 12 of 25
Prepared by
4/15/2015
¬
«
189
Te
n
52 % Up
48 % Wet
Mainline Connector
«8
¬
Mixed - Not Delineated
ee
-K
in
de
r
Not Field Verified
11
¬
«
10
¬
«
¬9
«
ne
ss
MLV 303-A
¬
«
188
Legend
Oklahoma
Arkansas
Mississippi
Texas
JE
F
FE
R
SO
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
N
D
AV
I
S
Wetland
Existing Facility
Upland
Wetland
10
«
¬
Mile Post
Perennial Stream
0
500
Feet
1,000
Waterbody
K
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Lake Charles
Liquefaction Project
Jurisdictional Waters
of the United States
Mainline Connector
Page 13 of 25
Prepared by
4/15/2015
Appendix 1-G.1a
Typical Right-of-Way
Configuration for
Mainline Connector
Page 14 of 25
¬
«
198
¬
«
197
¬
«
194
Calcasieu Rive r H DD
Calcasieu Rive r H DD
Calcasieu Rive r H DD
¬
«
195
Calcasieu Rive r H DD
¬
«
196
Legend
Oklahoma
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
Perennial Stream
0
500 1,000
Feet
Waterbody
Lake Charles
Liquefaction Project
Jurisdictional Waters
of the United States
Calcasieu River HDD
K
Mississippi
JE
F
FE
RS
ON
DA
VI
AL
LE
S
N
Arkansas
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Page 15 of 25
Prepared by
4/15/2015
Contractor Yard
Legend
Oklahoma
Arkansas
JEFFERSON DAVIS
Mississippi
Texas
CALCASIEU
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Contractor Yard
Page 16 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
to r
nne
c
Co
line
Ma
in
MLV 203-A
Compressor Station 203-A
«0
¬
¬
«
191
Legend
Oklahoma
Arkansas
Mississippi
CALCASIEU
Texas
JEFFERSON DAVIS
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Compressor Station 203-A
Page 17 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
Longville Compressor Station
¬
«
211
Legend
Oklahoma
Arkansas
Mississippi
BEAUREGARD
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Longville Compressor Station
Page 18 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
5
«
¬
Kinder Morgan Lake Charles
Legend
Oklahoma
Arkansas
Mississippi
CALCASIEU
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Kinder Morgan - Lake Charles
Page 19 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
Columbia Gulf - Eagan
Legend
Oklahoma
Arkansas
Mississippi
ACADIA
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Columbia Gulf - Eagan
Page 20 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
¬
«
197
TETCO - Allen
TETCO - Allen - Existing Meter Station
Legend
Oklahoma
Arkansas
Mississippi
ALLEN
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
TETCO - Allen
Page 21 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
NGPL - Lakeside
Oklahoma
Mississippi
Texas
Legend
JEFFERSON DAVIS
Arkansas
CAMERON
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
NGPL - Lakeside
Page 22 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
Texas Gas Woodlawn
Legend
Oklahoma
Arkansas
Mississippi
CALCASIEU
Texas
JEFFERSON DAVIS
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Texas Gas Woodlawn
Page 23 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
Transco Ragley
Legend
Oklahoma
Arkansas
Mississippi
BEAUREGARD
ALLEN
Texas
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
JEFFERSON DAVIS
Wetland
Existing Facility
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
Transco Ragley
Page 24 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015
US 190 Meter
¬
«
208
Legend
Oklahoma
Arkansas
Mississippi
BEAUREGARD
Texas
Wetland
Existing Facility
Access Road
Proposed Permanent Easement
Contractor Yard
PAB
Mosaic (PEM)
Intermittent Stream
Temporary Workspace
Study Area
PEM
Mosaic (PFO)
Ephemeral Stream
HDD - Permanent Easement
Proposed Mainline Connector
PFO
Mosaic (PSS)
Un-Classified Stream
Additional Temporary Workspace
Proposed Mainline 200-3 Loop
PSS
Drainage
Additional Construction Workspace
Existing TGC Pipelines
Mixed Not Delineated
Transect
Upland
Wetland
10
«
¬
Mile Post
0
Lake Charles
Liquefaction Project
Perennial Stream
500
Feet
Waterbody
K
Jurisdictional Waters
of the United States
US 190 Meter
Page 25 of 25
1,000
Sources: LCLP, LDOTD, USGS, ESRI, TRC
INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.
Prepared by
4/15/2015