NATURAL GAS LIQUEFACTION AND PIPELINE FACILITIES IN CALCASIEU, JEFFERSON DAVIS, ACADIA, CAMERON, ALLEN, AND BEAUREGARD PARISHES, LOUISIANA

NAME OF APPLICANT: Lake Charles LNG Company, LLC / Lake Charles LNG Export Company, LLC / Trunkline Gas Company, LLC, Attn: Monica Howard, 1300 Main Street, RM14.030, Houston, TX 77056.

LOCATION OF WORK: Liquefaction facilities are adjacent to the existing Lake Charles LNG Import Terminal in Calcasieu Parish; pipeline facilities are in Calcasieu and Jefferson Davis Parishes. Pipeline components will occur in Calcasieu, Jefferson Davis, Acadia, Cameron, Allen, and Beauregard Parishes, Louisiana. (facility centerpoint: Latitude 30.1210, Longitude -93.2890).

Hydrologic Unit Code: 08080206 – Lower Calcasieu Hydrologic Unit Code: 08080203 – Upper Calcasieu Hydrologic Unit Code: 08080202 – Mermentau Hydrologic Unit Code: 08080201 – Mermentau Headwaters

PROJECT SUMMARY: Construction of new natural gas liquefaction and pipeline facilities and modification of the existing Lake Charles LNG Import Terminal to export LNG.

CHARACTER OF WORK: This work will consist of the major components summarized below.

Liquefaction Facility (Figures 1-4): The Liquefaction Facility will require an approximately 286-acre site. This site will be cleared and permanently filled for ongoing operations, permanently impacting 105.27 acres of wetlands. Additional construction workspaces for the liquefaction facility will comprise four separate locations totaling approximately 325 acres in the immediate area of the Liquefaction Facility, with a permanent wetland impact of 110.15 acres.

LNG Carrier Berth (Figures 5-7): Mooring and breasting dolphins will be modified at the existing west dock, and breasting dolphins will be added to the existing east dock. Two temporary construction docks will be constructed. Approximately 26,000 cubic yards of material will be dredged from the existing basin for onshore disposal at an existing confined disposal facility.

Pipelines: Two new pipelines (one new 6.45-mile pipeline and one new 11.44 mile-pipeline in a new right-of-way) will be installed, and one existing pipeline will be modified. Where pipelines are installed and modified, the proposed activities include clearing rights-of-way, conducting trenching operations, installing various above and below ground pipelines and components, temporarily stockpiling materials, and performing horizontal directional drilling (HDD) operations. Following construction, rights-of-way will be restored to pre-construction grade and allowed to revegetate to the extent allowed under United States Department of Transportation (USDOT) regulations. The 6.45-mile 24-inch Mainline Loop will temporarily disturb 5.72 acres of wetlands and permanently convert 0.01 acre of forested wetland to non-forested wetland (Figures 8-10). The 11.44-mile 42-inch Mainline Connector will temporarily disturb 28.34 acres of wetlands and permanently convert 3.97 acres of forested wetland to non-forested wetland (Figures 11-14). The modifications to Mainline 200-1 will temporarily disturb 19.31 acres of wetland; no permanent impacts are expected (Figure 15). The single contractor yard (Figure 16) will not have wetland impacts.

Compressor Stations: One new compressor station will be constructed (Figure 17) and station piping at one existing compressor station will be modified (Figure 18). Construction of the new compressor station will permanently fill 2.60 acres of wetlands; modification of piping at the existing compressor station will not affect wetlands.

Meter Stations: Three new meter stations will be constructed (Figures 19-21) and five existing meter stations will be modified (Figures 22-25 and the Trunkline/LNG Export Meter on Figure 1). Activities at the meter stations will temporarily disturb 1.70 acres of wetlands, permanently fill 0.38 acre of wetlands, and permanently convert 0.16 acre of forested wetland to non-forested wetland.

Total Impacts: The Project will impact a total of 273.48 acres of jurisdictional wetlands. Of these, approximately 218.40 acres will be permanently filled for the liquefaction facilities, additional construction workspaces, and aboveground facilities; no permanent fill is associated with the pipelines. Construction of pipelines and aboveground facilities will temporarily disturb approximately 55.07 acres of wetlands. Approximately 4.14 acres of forested wetlands will be permanently converted to non-forested wetlands within the pipeline rights-of-way and aboveground facilities.

Mitigation: The applicant proposes to compensate for unavoidable project-related wetland impacts through a Permittee-Responsible Mitigation (PRM) project in the Lower Calcasieu Watershed, involving approximately 559 acres of coastal prairie and bottomland hardwood habitat restoration (details under development with appropriate resource agencies), and credit purchase from a USACE-approved Mitigation Bank.

JOINT PUBLIC NOTICE May 11, 2015 United States Army Corps of Engineers New Orleans District Regulatory Branch Post Office Box 60267 New Orleans, Louisiana 70160-0267

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1938 Brian.W.Breaux@usace.army.mil Project Manager Brian Breaux Permit Application Number MVN 2014-01575 MB

(225) 219-3225 Project Manager Elizabeth Johnson WQC Application Number WQC 150423-02

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Water Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). NATURAL GAS LIQUEFACTION AND PIPELINE FACILITIES IN CALCASIEU, JEFFERSON DAVIS, ACADIA, CAMERON, ALLEN, AND BEAUREGARD PARISHES, LOUISIANA NAME OF APPLICANT: Lake Charles LNG Company, LLC / Lake Charles LNG Export Company, LLC / Trunkline Gas Company, LLC, Attn: Monica Howard, 1300 Main Street, RM14.030, Houston, TX 77056. LOCATION OF WORK: Liquefaction facilities are adjacent to the existing Lake Charles LNG Import Terminal in Calcasieu Parish; pipeline facilities are in Calcasieu and Jefferson Davis Parishes. Pipeline components will occur in Calcasieu, Jefferson Davis, Acadia, Cameron, Allen, and Beauregard Parishes, Louisiana. (facility centerpoint: Latitude 30.1210, Longitude -93.2890). Hydrologic Unit Code: 08080206 ­ Lower Calcasieu Hydrologic Unit Code: 08080203 ­ Upper Calcasieu Hydrologic Unit Code: 08080202 ­ Mermentau Hydrologic Unit Code: 08080201 ­ Mermentau Headwaters PROJECT SUMMARY: Construction of new natural gas liquefaction and pipeline facilities and modification of the existing Lake Charles LNG Import Terminal to export LNG.

CHARACTER OF WORK: This work will consist of the major components summarized below.

Liquefaction Facility (Figures 1-4): The Liquefaction Facility will require an approximately 286-acre site. This site will be cleared and permanently filled for ongoing operations, permanently impacting 105.27 acres of wetlands. Additional construction workspaces for the liquefaction facility will comprise four separate locations totaling approximately 325 acres in the immediate area of the Liquefaction Facility, with a permanent wetland impact of 110.15 acres. LNG Carrier Berth (Figures 5-7): Mooring and breasting dolphins will be modified at the existing west dock, and breasting dolphins will be added to the existing east dock. Two temporary construction docks will be constructed. Approximately 26,000 cubic yards of material will be dredged from the existing basin for onshore disposal at an existing confined disposal facility. Pipelines: Two new pipelines (one new 6.45-mile pipeline and one new 11.44 mile-pipeline in a new right-of-way) will be installed, and one existing pipeline will be modified. Where pipelines are installed and modified, the proposed activities include clearing rights-of-way, conducting trenching operations, installing various above and below ground pipelines and components, temporarily stockpiling materials, and performing horizontal directional drilling (HDD) operations. Following construction, rights-of-way will be restored to pre-construction grade and allowed to revegetate to the extent allowed under United States Department of Transportation (USDOT) regulations. The 6.45-mile 24inch Mainline Loop will temporarily disturb 5.72 acres of wetlands and permanently convert 0.01 acre of forested wetland to non-forested wetland (Figures 8-10). The 11.44-mile 42-inch Mainline Connector will temporarily disturb 28.34 acres of wetlands and permanently convert 3.97 acres of forested wetland to non-forested wetland (Figures 11-14). The modifications to Mainline 200-1 will temporarily disturb 19.31 acres of wetland; no permanent impacts are expected (Figure 15). The single contractor yard (Figure 16) will not have wetland impacts. Compressor Stations: One new compressor station will be constructed (Figure 17) and station piping at one existing compressor station will be modified (Figure 18). Construction of the new compressor station will permanently fill 2.60 acres of wetlands; modification of piping at the existing compressor station will not affect wetlands. Meter Stations: Three new meter stations will be constructed (Figures 19-21) and five existing meter stations will be modified (Figures 22-25 and the Trunkline/LNG Export Meter on Figure 1). Activities at the meter stations will temporarily disturb 1.70 acres of wetlands, permanently fill 0.38 acre of wetlands, and permanently convert 0.16 acre of forested wetland to non-forested wetland. Total Impacts: The Project will impact a total of 273.48 acres of jurisdictional wetlands. Of these, approximately 218.40 acres will be permanently filled for the liquefaction facilities, additional construction workspaces, and aboveground facilities; no permanent fill is associated with the pipelines. Construction of pipelines and aboveground facilities will temporarily disturb approximately 55.07 acres of wetlands. Approximately 4.14 acres of forested wetlands will be permanently converted to non-forested wetlands within the pipeline rights-of-way and aboveground facilities. Mitigation: The applicant proposes to compensate for unavoidable project-related wetland impacts through a Permittee-Responsible Mitigation (PRM) project in the Lower Calcasieu Watershed, involving approximately 559 acres of coastal prairie and bottomland hardwood habitat restoration (details under development with appropriate resource agencies), and credit purchase from a USACEapproved Mitigation Bank.

The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 30 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would not affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office,

the Corps has determined that the proposed activity would have no effect on any listed species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 16.4 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Water Quality Certifications, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Darrell S. Barbara Chief, Western Evaluation Section Enclosure

ACW Area A

Proposed Liquefaction Facility

ACW Area B 0 « ¬

Trunkline/LNG Export Meter

«1 ¬

LNG Terminal

ACW Area B ACW Area D 2 ¬ «

ACW Area C

«3 ¬ Oklahoma

Legend

Arkansas

Mississippi

CALCASIEU

Texas

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland CAMERON

Wetland

10 « ¬

Wetland

Lake Charles Liquefaction Project

Perennial Stream

Mile Post

0

500 1,000 Feet

Waterbody

K

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Jurisdictional Waters of the United States Proposed Liquefaction Facility

Page 1 of 25 Prepared by

4/15/2015

ACWS Area A

Grade at Elev. 8' Construction Area

Proposed Liquefaction Facility

Offices

Grade at Elev. 11' Grade at Elev. 11' Flare

Flare

M AT C H L I N E

Grade at Elev. 8'

Operations

Liquefaction Trains Grade at Elev. 11' Grade at Elev. 6'

K 0

500

ACWS Area B Grade at Elev. 12' Grade at Elev. 11'

1,000

Offices

Feet

ACWS Area B Legend Proposed Liquefaction Facility

Lake Charles Liquefaction Project

Liquefaction Project Features Additional Construction Workspace (ACWS) Access Roads Cross Section

Proposed Liquefaction Facility Layout Sheet 1 of 2

Page 2 of 25

INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP. 4/15/2015

M AT C H L I N E

Operations

Grade at Elev. 6'

ACWS Area B Existing Dredge Spoil Management Facility

Grade at Elev. 12'

Offices

Construction Area

ACWS Area B Grade at Elev. 8' Construction Area

ACWS Area D Offices ns Co

n ctio tru

Are

a

Construction Area

ACWS Area C

Offices

Grade at Elev. 8'

Grade at Elev. 8'

K 0

500

1,000

Feet

Legend Proposed Liquefaction Facility

Lake Charles Liquefaction Project

Liquefaction Project Features Additional Construction Workspace (ACWS) Access Roads Cross Section

Proposed Liquefaction Facility Layout Sheet 2 of 2

Page 3 of 25

INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP. 4/15/2015

500'

1000'

1500'

2000'

2500'

3000'

3500'

4000'

2500'

3000'

3500'

4000'

25' 20' 15' 10' 5' 0' Proposed Liquefaction Facility - North ----> South

500'

1000'

1500'

2000'

25' 20' 15' 10' 5' 0'

Proposed Liquefaction Facility - West ----> East

500'

1000'

1500'

2000'

2500'

3000'

3500'

4000'

2000'

2500'

3000'

3500'

4000'

25' 20' 15' 10' 5' 0' ACWS Area A - North ----> South

500'

1000'

1500'

25' 20' 15' 10' 5' 0' ACWS Area B - North ----> South

500'

1000'

1500'

ACWS Area C - North ----> South

2000'

2500'

3000'

3500'

4000'

25' 20' 15' 10' 5' 0' ACWS Area D - North ----> South

Legend

Lake Charles Liquefaction Project

Pre-Construction Elevation Profile Post-Construction Elevation Profile

Proposed Liquefaction Facility Cross Sections Page 4 of 25

INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP. 4/15/2015

Page 5 of 25

Page 6 of 25

Page 7 of 25

¬ « 177

¬ « 176

00-3 Loop Mainline 2

¬ « 178

179

¬ «

Legend

Oklahoma

JE F

Mississippi

CA

LC A

SI E

U

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

Perennial Stream

0

500 Feet

1,000

Waterbody

Lake Charles Liquefaction Project Jurisdictional Waters of the United States Mainline 200-3 Loop

K

FE RS ON

DA VI

S

Arkansas

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Page 8 of 25

Prepared by

4/15/2015

¬ « 182

¬ « 181

Mainline 200-3 Loop

¬ « 180

Legend

Oklahoma

Mississippi

CA

LC A

SI E

U

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

Perennial Stream

0

500 Feet

1,000

Waterbody

Lake Charles Liquefaction Project Jurisdictional Waters of the United States Mainline 200-3 Loop

K

JE F

FE RS ON

DA VI

S

Arkansas

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Page 9 of 25

Prepared by

4/15/2015

Appendix 1-G.1b Typical Right-of-Way Configuration for Mainline 200-3 Loop

Page 10 of 25

3 « ¬

¬4 «

«2 ¬

i Ma

C

om pr es

so r

S

ta

t io

n

20 3

eC nlin

e onn

r ct o

1 ¬ «

-A

Legend

Oklahoma Arkansas

Mississippi

Texas JE F

FE R

SO

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect N

D

AV I

Upland S

Wetland

Existing Facility

Wetland

10 « ¬

Mile Post

Perennial Stream

0

500 Feet

1,000

Waterbody

K

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Lake Charles Liquefaction Project Jurisdictional Waters of the United States Mainline Connector

Page 11 of 25

Prepared by

4/15/2015

Not Field Verified Not Field Verified

Mainline Connector

6 ¬ «

5 ¬ «

7 ¬ «

Legend

Oklahoma Arkansas

Mississippi

Texas JE F

FE R

SO

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect N

D

AV I

S

Wetland

Existing Facility

Upland Wetland

10 « ¬

Mile Post

Perennial Stream

0

500 Feet

1,000

Waterbody

K

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Lake Charles Liquefaction Project Jurisdictional Waters of the United States Mainline Connector

Page 12 of 25

Prepared by

4/15/2015

¬ « 189

Te n

52 % Up 48 % Wet

Mainline Connector

«8 ¬

Mixed - Not Delineated

ee

-K

in

de

r

Not Field Verified 11 ¬ «

10 ¬ «

¬9 «

ne ss

MLV 303-A

¬ « 188

Legend

Oklahoma Arkansas

Mississippi

Texas JE F

FE R

SO

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect N

D

AV I

S

Wetland

Existing Facility

Upland Wetland

10 « ¬

Mile Post

Perennial Stream

0

500 Feet

1,000

Waterbody

K

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Lake Charles Liquefaction Project Jurisdictional Waters of the United States Mainline Connector

Page 13 of 25

Prepared by

4/15/2015

Appendix 1-G.1a Typical Right-of-Way Configuration for Mainline Connector

Page 14 of 25

¬ « 198

¬ « 197

¬ « 194

Calcasieu Rive r H DD

Calcasieu Rive r H DD

Calcasieu Rive r H DD

¬ « 195

Calcasieu Rive r H DD

¬ « 196

Legend

Oklahoma

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

Perennial Stream

0

500 1,000 Feet

Waterbody

Lake Charles Liquefaction Project Jurisdictional Waters of the United States Calcasieu River HDD

K

Mississippi

JE F

FE RS ON

DA VI

AL LE

S

N

Arkansas

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Page 15 of 25

Prepared by

4/15/2015

Contractor Yard

Legend

Oklahoma Arkansas JEFFERSON DAVIS

Mississippi

Texas

CALCASIEU

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Contractor Yard

Page 16 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

to r nne c Co line Ma in

MLV 203-A

Compressor Station 203-A

«0 ¬

¬ « 191

Legend

Oklahoma Arkansas

Mississippi CALCASIEU

Texas

JEFFERSON DAVIS

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Compressor Station 203-A

Page 17 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

Longville Compressor Station

¬ « 211

Legend

Oklahoma Arkansas

Mississippi BEAUREGARD

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Longville Compressor Station

Page 18 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

5 « ¬

Kinder Morgan Lake Charles

Legend

Oklahoma Arkansas

Mississippi CALCASIEU

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Kinder Morgan - Lake Charles

Page 19 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

Columbia Gulf - Eagan

Legend

Oklahoma Arkansas

Mississippi ACADIA

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Columbia Gulf - Eagan

Page 20 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

¬ « 197

TETCO - Allen

TETCO - Allen - Existing Meter Station

Legend

Oklahoma Arkansas

Mississippi ALLEN

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States TETCO - Allen

Page 21 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

NGPL - Lakeside

Oklahoma

Mississippi

Texas

Legend

JEFFERSON DAVIS

Arkansas

CAMERON

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States NGPL - Lakeside

Page 22 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

Texas Gas Woodlawn

Legend

Oklahoma Arkansas

Mississippi CALCASIEU

Texas

JEFFERSON DAVIS

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Texas Gas Woodlawn

Page 23 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

Transco Ragley

Legend

Oklahoma Arkansas

Mississippi BEAUREGARD

ALLEN

Texas

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland JEFFERSON DAVIS

Wetland

Existing Facility

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States Transco Ragley

Page 24 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

US 190 Meter

¬ « 208

Legend

Oklahoma Arkansas

Mississippi BEAUREGARD

Texas

Wetland

Existing Facility

Access Road

Proposed Permanent Easement

Contractor Yard

PAB

Mosaic (PEM)

Intermittent Stream

Temporary Workspace

Study Area

PEM

Mosaic (PFO)

Ephemeral Stream

HDD - Permanent Easement

Proposed Mainline Connector

PFO

Mosaic (PSS)

Un-Classified Stream

Additional Temporary Workspace

Proposed Mainline 200-3 Loop

PSS

Drainage

Additional Construction Workspace

Existing TGC Pipelines

Mixed Not Delineated

Transect Upland Wetland

10 « ¬

Mile Post

0

Lake Charles Liquefaction Project

Perennial Stream

500 Feet

Waterbody

K

Jurisdictional Waters of the United States US 190 Meter

Page 25 of 25

1,000

Sources: LCLP, LDOTD, USGS, ESRI, TRC INFORMATION DEPICTED HEREON IS FOR REFERENCE PURPOSES ONLY AND IS COMPILED FROM BEST AVAILABLE DATA SOURCES. TRC ASSUMES NO RESPONSIBILITY FOR ERRORS ARISING FROM MISUSE OF THIS MAP.

Prepared by

4/15/2015

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas