Home

Galveston District

Run scraper

SpaceX

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Proposed amendment to SWG-2012-00381 for the construction of a commercial space launch facility

Full Public NoticeProject PlansTCEQ 401 QuestionaireMitigation Plan Department of the Army Permit SWG-2012-00381 was issued on 9 Sep 2014 authorizing the placement of fill material in 3.3 acres of waters of the United States (U.S.) for the purpose of constructing a commercial space launch facility. However, during final project design, SpaceX determined that an additional 2.13 acres of waters of the U.S. that were previously avoided will need to be filled to reach the projects purpose and need. If authorized, this will bring the total direct impacts from 3.9 acres to 5.43 acres.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas