Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LAUREL RIDGE LEVEE EXTENSION PROJECT IN ASCENCION PARISH

NAME OF APPLICANT: Pontchartrain Levee District, c/o GSA Consulting Engineers, Attn: Jake Lambert, P.O. Box 298, Gonzales, Louisiana 70707. LOCATION OF WORK: Approximately 1.3 miles west of the Amite River Diversion Canal and adjacent to Lake Martin beginning on the north end at Walls Cemetery Road and extending south to meet with the existing Laurel Ridge Levee at Gold Place Road in Prairieville, Louisiana, in Ascension Parish, within the Amite River and the Lake Maurepas Basins, in hydrologic units (HUC 08070202) and (HUC 08070204), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit fill for the construction of a 4.5 mile extension of the Laurel Ridge Levee. Approximately 430,000 cubic yards of fill will be placed to construct the levee that will vary in height from 12 and 16 feet and will be approximately 100 feet wide at the base. There will be a 15-foot maintenance strip on both sides of the levee and in some areas a drainage swale will be created on the protected side that is approximately 35-feet in width. Additionally 7 sluice gate outfall structures will be installed in the levee at strategic points to allow for the natural movement of water with reference to wetlands located on both sides of the levee and two ramps will be installed for access to the unprotected side of the levee. These sluice gates will remain in the normally open position until the threat of back water flooding occurs from a rise in the Amite River leading to the closure of those gates. The threshold indicator for the closure would be a flood stage of the Amite River at or above 6-feet NAVD88. A stage frequency analysis of the Amite River at the proposed outlet structures indicates that the gates would be closed for a flood event on average once every three years. The gates will then be opened when the water recedes and the threat has passed. An emergency overflow structure will also be installed at the southern end of the proposed levee. The levee foot print will impact approximately 98 acres of property. Of the 98 acres, 50.9 acres of forested wetlands will be permanently impacted as a result of this project, and 673 acres of wetlands will remain in the protected side of the levee. The applicant stated that the proposed levee project has been designed to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from Corps approved mitigation banks located in the watershed

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas