The applicant proposes to construct a new 15-mile toll way

Full Public NoticeProject PlansTCEQ Checklist The applicant proposes to discharge 55,773 cubic yards of fill material into 6.914 acres of forested, scrub-shrub, and emergent wetlands and 17,665 linear feet of stream during construction of a 15-mile new location controlled access road with intermittent frontage roads and associated facilities within a 400-foot- wide right-of-way (ROW). The project would include the construction of roads, embankments, bridges, culverts, drainage ditches, outfall channels, and detention ponds.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas