Home

Galveston District

Run scraper

Global Companies LLC

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a petroleum product transloading facility along the Sabine Neches Waterway.

Full Public NoticeProject Plans The applicant proposes to discharge fill material into 10.45 acres of forested wetlands, 3.27 acres of emergent wetlands, and 0.59 acre of open water as part of a project to construct a facility to trans-load crude oil, bitumen, distillates, renewable fuels, natural gas liquids and other petroleum products between rail and marine transportation modes. The proposed work would affect 126 linear feet of a Jefferson County Drainage District No. 7 drainage canal.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas