The applicant proposes to install approximately 100 linear feet of bulkheading and backfill the bulkhead with dredged material.

Full Public NoticeProject Plans The applicant proposes to install approximately 100 linear feet of bulkheading and backfill the bulkhead with dredged material. Approximately 635 cubic yards of GIWW bottom will be mechanically dredged to a depth of -5 feet below mean high water. Material not placed behind the bulkhead will be placed upon the adjacent property to raise the elevation. Additionally, the applicant proposes to install 50 9-inch-diameter wooden pilings for pier support. The applicant proposes a wrap-around C-shaped marina basin with a wrap-around, 4-foot-wide by 252-foot-long pier. Five 12-foot-long by 4-foot-wide finger piers will be constructed adjacent to the area of the pier abutting the shoreline. The finger piers will have two pilings spaced midway between them to create a double slip. The piers will not extend into the GIWW beyond the existing boathouse.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas