You can copy from here when filling out the rest of the page.
The applicant requests to amend their current permit for basin construction
Full Public NoticeProject Plans
The applicant proposes to amend the permit by including: 1) an additional 2 feet of allowable overdepth for a maximum authorized depth of -29 feet MLT (-25 feet, plus 2 feet advanced maintenance dredging, plus 2 feet allowable overdepth; 2) addition of an armor stone slope protection option to the originally authorized articulated block revetment option. For this option, the applicant requests that the slope protection area be extended from the top of slope to the toe of the slope for a total placement of 150,000 cubic yards of armor stone slope protection over a 12.29-acre area. Only one of the two options would be used, thus no additional fill-related impacts would be incurred as a result of either slope protection option; 3) a modification of the authorized grade for the dredged basin side slope from 3:1 to a range of 2.8-3.0:1. This modification will not change the originally permitted volume of material (4.4 mcy) to be excavated in association with basin construction.