You can copy from here when filling out the rest of the page.
Alaska Department of Natural Resources Division of Parks and Outdoor Recreations' tated purpose is to repair an existing structure to re-establish access to public facilities in the Halibut Cove State Park. Alaska Department of Natural Resources Division of Parks and Outdoor Recreations proposes to remove the six- 20 foot x 10 foot floats and seven-12 inch diameter steel piles from below the mean high water mark of Halibut Cove Lagoon (MHWM, 17.3 feet above mean low low water of 0 feet elevation). The existing beach stairs, 60 foot gangway and 36 foot trestle would be salvaged and re-installed. The applicant proposes to install two-40 foot x 10 foot floats, six-12 inch diameter pilings, and an additional 60 foot long trestle section below the MHWM of Halibut Cove Lagoon. The piling removal and installation would be completed using either a vibratory hammer or a gravity hammer. It is estimated that installation of the new piles would take 4 hours per pile, for a total time of 3 days. Please contact Katherine A. McCafferty at (907) 753-2692 by fax at (907) 420-0813 or by email at Katherine.a.mccafferty2@usace.army.mil if further information is desired concerning this notice.
Alaska Department of Natural Resources Division of Parks and Outdoor Recreations' tated purpose is to repair an existing structure to re-establish access to public facilities in the Halibut Cove State Park.Alaska Department of Natural Resources Division of Parks and Outdoor Recreations proposes to remove the six- 20 foot x 10 foot floats and seven-12 inch diameter steel piles from below the mean high water mark of Halibut Cove Lagoon (MHWM, 17.3 feet above mean low low water of 0 feet elevation). The existing beach stairs, 60 foot gangway and 36 foot trestle would be salvaged and re-installed. The applicant proposes to install two-40 foot x 10 foot floats, six-12 inch diameter pilings, and an additional 60 foot long trestle section below the MHWM of Halibut Cove Lagoon. The piling removal and installation would be completed using either a vibratory hammer or a gravity hammer. It is estimated that installation of the new piles would take 4 hours per pile, for a total time of 3 days.Please contact Katherine A. McCafferty at (907) 753-2692 by fax at (907) 420-0813 or by email at Katherine.a.mccafferty2@usace.army.mil if further information is desired concerning this notice.
POA-2015-318 Halibut Cove Lagoon PN
POA-2015-318 Halibut Cove Lagoon PN sheets 1-12