RAMP IMPROVEMENTS AND BARGE IN THE MISSISSIPPI RIVER IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: Shamrock Marine, LLC, c/o Thompson Engineering, 2970 Cottage Hill Road, Suite 190, Mobile, Alabama 36606.
LOCATION OF WORK: Within the Mississippi River Basin, in the Lower Mississippi River – Baton Rouge hydrologic unit (HUC 08070100), in the Mississippi River, left descending bank, mile marker 229.3, near Baton Rouge, Louisiana, in East Baton Rouge Parish, as shown on the enclosed drawings.
CHARACTER OF WORK: The applicant has requested approval to improve and maintain an existing concrete ramp, and install and maintain a building and gravel parking lot. Ramp improvements include removing sediment from the ramp, and installing a base course and a concrete cap on the existing ramp. It is estimated that 10-20 cubic yards of sediment will be removed from the ramp and spread above the Ordinary High Water Mark in the Mississippi River batture. Approximately 96 cubic yards of concrete and 64 cubic yards of base material will be used for ramp improvements. A 100’x30’ spud barge will be anchored at the River’s edge to load/unload supplies. The applicant also proposes to install a 16’x24’building and a 30’x60’ gravel parking lot in uplands on the Mississippi River batture. Existing access ramps will be utilized for access. Approximately 0.1 acre of jurisdictional wetlands will be impacted by the proposed ramp improvements. The impacted wetlands are frequently inundated and are not vegetated. Thus, it is anticipated that no mitigation will be required for this activity. Should mitigation be required for unavoidable wetland impacts, the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
July 20, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Water Quality Certification Section
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2675
Project Manager
Jamie Crowe
Jamie.M.Crowe@usace.army.mil
Permit Application Number
MVN 2014-2632 CO
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 150715-01
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS30:2047 A(3), and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
RAMP IMPROVEMENTS AND BARGE IN THE MISSISSIPPI RIVER
IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: Shamrock Marine, LLC, c/o Thompson Engineering, 2970
Cottage Hill Road, Suite 190, Mobile, Alabama 36606.
LOCATION OF WORK: Within the Mississippi River Basin, in the Lower Mississippi
River Baton Rouge hydrologic unit (HUC 08070100), in the Mississippi River, left
descending bank, mile marker 229.3, near Baton Rouge, Louisiana, in East Baton
Rouge Parish, as shown on the enclosed drawings.
CHARACTER OF WORK: The applicant has requested approval to improve and
maintain an existing concrete ramp, and install and maintain a building and gravel
parking lot. Ramp improvements include removing sediment from the ramp, and
installing a base course and a concrete cap on the existing ramp. It is estimated that
10-20 cubic yards of sediment will be removed from the ramp and spread above the
Ordinary High Water Mark in the Mississippi River batture. Approximately 96 cubic
yards of concrete and 64 cubic yards of base material will be used for ramp
improvements. A 100'x30' spud barge will be anchored at the River's edge to
load/unload supplies. The applicant also proposes to install a 16'x24'building and a
30'x60' gravel parking lot in uplands on the Mississippi River batture. Existing access
ramps will be utilized for access. Approximately 0.1 acre of jurisdictional wetlands will
be impacted by the proposed ramp improvements. The impacted wetlands are
frequently inundated and are not vegetated. Thus, it is anticipated that no mitigation
will be required for this activity. Should mitigation be required for unavoidable wetland
impacts, the applicant proposes to purchase wetland credits from a Corps approved
mitigation bank located in the watershed.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 30 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH Letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number
and be mailed to the Louisiana Department of Environmental Quality at the address
above. The application for this proposed project is on file with the Louisiana
Department of Environmental Quality and may be examined weekdays between 8:00
a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food
and fiber production, mineral needs, considerations of property ownership and, in
general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would not affect any species, nor affect
any habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
The New Orleans District has determined that the proposed project is located in
waters known to be utilized by the pallid sturgeon (Scaphirhynchus albus) and
determined that the proposed activity is not likely to adversely affect the species based
on the Standard Local Operating Procedure for Endangered Species of Louisiana
(SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers and
U.S. Fish and Wildlife Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
John M. Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
VICINITY MAP
R iver Rd S
Europe St
PROJECT SITE
Saint Fer di nand St
South Blvd
¨
§
¦
10
991
S
T
30
T
S
Service Layer Credits: Sources: Esri, DeLor me, NAVTEQ, USGS, Intermap, iPC, NRCAN , Esr i Japan, METI, Esri China (Hong Kong), Esri (Thailand ), Tom Tom, 2013
Sour ce: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Commu nity
³
1:4,800
0
400
800
Feet
1 inch = 400 feet
Service Layer Credits: Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2013
Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community - IMAGERY DATE: March 2010, 0.3M Resolution
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
AERIAL PHOTOGRAPH
AND VICINITY
MAP
AERIAL
PHOTOGRAPH
FIGURE 1
PROJECT NO.:
14-1101-0028
DATE:
FEBRUARY 2014
26 June 2015
Existing Site Conditions
Existing Mooring
Piling
Existing Ramp
OHWM
Existing Retaining
Wall
Existing Mooring
Piling
³
100' X 30' Barge
w/ Ramp
Proposed Site Improvements
Disposal Site for
Excavated Materials
(20 C.Y. Max.)
Approx. Dimensions
25' X 75'
A
200
(fig. 15)
OHWM
100
Access Route
(no improvements)
To Exist. Ramp and
New Parking
0
A
(fig. 15)
Gravel Parking
(Exist. Grade)
30'
16'
Existing
Power
Pole
24'
New Sign
(figure 12)
60'
Morgan
Building
(figure 14)
NOT TO SCALE
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
CURRENT AND PROPOSED SITE
AERIAL PHOTOGRAPH
FIGURE 2
PROJECT NO.:
14-1101-0028
DATE:
FEBRUARY 2014
26 June 2015
1
1
2
2
3
3
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
CROSS SECTIONS
FIGURE 3
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 4
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 5
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 6
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 7
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 8
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 9
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 10
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 11
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 12
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 13
26 June 2015
SHAMROCK MARINE, LLC
USACE LEVEE BATTURE PROJECT
EAST BANK MISSISSIPPI RIVER
AT INTERSTATE HIGHWAY 10 CROSSING
EAST BATON ROUGE PARISH, LOUISIANA
FIGURE 14
26 June 2015
26 June 2015