Home

Albuquerque District

Run scraper

The U.S. Army Corps of Engineers

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers, Albuquerque District, (Corps) and the Pueblo of Nambé Environment Department (NED) are evaluating an application for the Rio Nambé Debris Flow Barriers, located in the Pueblo of Nambé Reservation, Santa Fe County, New Mexico, which would result in impacts to approximately 1.2 acres (ac) or 926 linear feet (lf) of waters of the United States in the Rio Nambé. The Federal Emergency Management Agency (FEMA) is the federal funding agency for the proposed project. This notice is to inform interested parties of the proposed activity and to solicit comments on the Corps, NED and FEMA actions.

Application Number: SPA-2015-00080-ABQ Date: July 23, 2015 Comments Due: August 21, 2015

SUBJECT: The U.S. Army Corps of Engineers, Albuquerque District, (Corps) and the Pueblo of Nambé Environment Department (NED) are evaluating an application for the Rio Nambé Debris Flow Barriers, located in the Pueblo of Nambé Reservation, Sant Fe, County, New Mexico, which would result in impacts to approximately 1.2 acres (ac) or 926 linear feet (lf) of waters of the United States in the Rio Nambé. The Federal Emergency Management Agency (FEMA) is the federal funding agency for the proposed project. This notice is to inform interested parties of the proposed activity and to solicit comments on the Corps, NED and FEMA actions. AUTHORITY: This application is being evaluated under Sections 404 and 401 of the Clean Water Act (CWA) for the discharge of dredged or fill material in waters of the United States (U.S.). Tribal water quality certification is provided under the authority of Pueblo of Nambé water quality standards. APPLICANT: Philip Perez Governor, Pueblo of Nambé 15A NP 102 West Santa Fe, New Mexico 87506 LOCATION: The project area is located on the Pueblo of Nambé Reservation in Section 28 of Township 19N, Range 10E, Latitude 35.850328°, Longitude -105.892941°, Santa Fe County, New Mexico (Figures 1-7 of 7).

PROJECT DESCRIPTION: The applicant proposes to install three Geobrugg, ring-net, flexible debris flow barriers in the Rio Nambé at three separate locations upstream of Nambé Falls Reservoir (Figures 3-6 of 7). Ring-net debris flow barriers would be installed perpendicular to the stream channel in the valley for the purpose of capturing debris and sediment mobilized from the upper watershed during rain and snowmelt runoff events. The debris flow barriers system consists of a ring-net barrier rockfall protection system that is flexible and modified to resist the velocities and energies of lateral loads unique to debris flows. Ring-net debris flow barriers include a wire mesh and geotextiles to retain smaller debris and sediment, while allowing water to pass through the barrier (Figures 3-7 of 7). The ring-nets are anchored into bedrock in the valley walls by drilling and secured by grout. The applicant considered channel morphology, channel gradient, available storage capacity upstream of the potential barrier sites, accessibility for construction and maintenance, and bedrock conditions for debris flow barrier site selection. The debris flow barriers have been designed to capture approximately 7,583 cubic yards (cy) or 4.7 ac-ft, 408 cy or 0.25 ac-ft, and 804 cy or 0.5 ac-ft of debris and sediment at full capacity respectively for Sites 1, 2, and 3. At full capacity, the debris flow barriers would capture enough material to fill approximately 0.9 ac, 0.1 ac, 0.17 ac of waters of the U.S. respectively at Sites 1, 2 and 3. The debris flow barriers have been designed for a life span of up to 25 years, at which time the applicant may remove the barriers and allow any fill behind them to become revegetated and act as grade control as long as the upper watershed has recovered from fire impacts sufficient enough for the threat of debris flows to have been eliminated. The applicant would dredge material captured by the debris flow barriers on an as-needed basis and as recommended by the applicant’s contractor. Debris and sediment dredged from behind the barriers would be disposed in an upland location on Pueblo of Nambé lands that has been previously disturbed. Access for construction, operation, and maintenance of the debris flow barriers would be developed in uplands and provided by extending an existing jeep-trail at Site 1; a new roadway would need to be constructed at Site 2; and an existing 8-ft wide footpath would be expanded at Site 3. Based on the available information, the overall project purpose is storm water management. The applicant believes there is a need to capture debris flows from storm water because of the large amount of debris and sediment entering the Rio Nambé and Nambé Falls Reservoir from the 2011 Pacheco Fire scar, which adversely affected approximately 10,250 ac or 50% of primarily Rio Nambé watershed. The proposed project would reduce the amount of sediment and debris entering the reservoir, prevent downstream property damage from debris flows, and minimize public health and safety risk due to debris flows.

COMMENT SUBMITTAL AND DEADLINES: The Corps and NED are soliciting comments from all interested parties to consider and evaluate the impacts of this proposed activity. Any comments received will be considered to determine whether to issue, issue with special conditions, or deny a permit for this proposal. Submittal of Corps Permit Application Comments: All comments regarding the Corps permit application for the above-described project must be received on or before August 21, 2015, which is the close of the comment period. Comments on tribal Section 401 certification must be submitted as described below under “Water Quality Certification Comments”. Extensions of the comment period may be granted for valid reasons provided a written request is received by the limiting date. If no comments are received by that date, it will be considered that there are no objections. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the particular reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Comments and requests for additional information on the Corps permitting action should be submitted to: Kelly Allen, Project Manager US Army Corps of Engineers, Albuquerque District 4101 Jefferson Plaza NE Albuquerque, New Mexico 87109 Phone: 505-342-3216 E-mail: Kelly.E.Allen@usace.army.mil

Submittal of Water Quality Certification Comments: Section 401 requires that any applicant for an individual Section 404 permit provide proof of water quality certification to the Corps prior to permit issuance. For the above described project, the applicant is required to obtain water quality certification (WQC), under Section 401 of the CWA, from the NED. This document serves to notify the public that the NED will consider issuing WQC under Section 401 of the CWA. The purpose of WQC is to reasonably ensure that the permitted activities will be conducted in a manner compliant with applicable Pueblo of Nambé water quality standards. The NED will accept and consider written comments regarding the WQC received during the public comment period. Comments may be submitted electronically or by hard copy to: Steve Rydeen Manager of Environmental and Natural Resources Environment Department Pueblo of Nambé Rural Route 1, Box 117-BB Nambé Pueblo, New Mexico 87506 Phone: 505-455-4420 E-mail: srydeen@nambepueblo.org

Submittal of Comments on the FEMA action: Written comments on the proposed action can be mailed, emailed, or faxed to the contact below. If no substantive comments are received during the public comment period, FEMA plans to review and adopt the environmental decision document issued by the Corps upon issuance of the Clean Water Act permit, and FEMA will issue its own Finding of No Significant Impact (FONSI) to finalize the agency’s compliance with the National Environmental Policy Act (NEPA). Dorothy Weir Environmental Specialist FEMA Region 6 800 N Loop 288, Denton, TX 76209 Fax: 940-297-0152 Email: dorothy.weir@fema.dhs.gov

Please note that names and addresses of those who submit comments in response to this public notice may be made publicly available through the Freedom of Information Act. DISTRICT ENGINEER ALBUQUERQUE DISTRICT U.S. ARMY CORPS OF ENGINEERS

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas