Tom Taylor is the Regulatory point-of-contact for this proposal establish a 47.3-acre wetland mitigation project in Warrenton, Oregon.
Public Notice
Notice of Proposed Statewide In-Lieu Fee Program Instrument Modification for Clear Lake In-Lieu Fee Wetland Mitigation Project
30 Day Notice Issue Date:July 24, 2015
Closing Date: August 23, 2015
Corps File No.: NWP-2015-234
Interested parties are hereby notified that the U.S. Army Corps of Engineers, Portland District (Corps) is considering a proposal to modify the In-lieu Fee Program Instrument to establish a 47.3-acre wetland mitigation project, known as the Clear Lake In-lieu Fee (ILF) Project. The proposed ILF Project is located within the City of Warrenton, where it is zoned for residential development, in Clatsop County, Oregon, (see attachments). The ILF Project sponsor, the Oregon Department of State Lands (DSL), proposes to preserve mature forested and lake fringe wetland that were under threat of development, restore wetlands previously impacted by past road building activity, and create additional fringe wetlands along the Clear Lake shore. The proposed 47.3-acre ILF Project also would include nearly 15 acres of upland buffers surrounding the lake.
The proposed ILF Project would be located in Township 8 North, Range 10 West, Sections 16 and 17 (latitude 46.1728 North and longitude –123.9426 West). A Prospectus describing the proposed ILF Project has been received from the project sponsor and is now available for public review.
The Clear Lake ILF Project is being proposed by the sponsor primarily as a means to meet the requirements for compensatory mitigation for projects which may be permitted by the Corps under the authority of Section 404 of the Clean Water Act and by the DSL in implementing the provisions of Oregon’s Removal-Fill Law (ORS 196.800 - 196.990) and according to Rules for Issuance and Enforcement of Removal and Fill Permits (OAR 141-85) and Administrative Rules for Compensatory Wetland Mitigation Banking. The ILF Project sponsor would sell wetland credits to various parties to meet their obligations under the “no net loss of wetlands” policies of these federal and state regulations.
The proposed ILF Project will generate wetland credits by preserving existing high quality wetlands, re-establishing wetland areas that were filled by construction of access roads, creating additional wetland areas within the dune ridge ring by lowering adjacent uplands 1-3 feet to the water table, and enhancing some existing forested wetlands by plugging drainage ditches. A delineation report will be submitted to the Corps for review to verify the extent of existing wetlands and hydric soils. This information will determine how much of the area qualifies for restoration or enhancement credit ratios and will be documented in the ILF Project Mitigation Plan.
The proposed service area, which is the area within which the mitigation credits generated by the ILF Project may be used, includes the urbanizing areas of Warrenton, Astoria, and Gearhart. It consists of the following Hydrologic Unit Code (HUC) watersheds:
Lower Columbia subbasin (HUC4 17080006)
Portions of the Necanicum River subbasin (HUC4 17100201) that fall within the Oregon Department of Fish and Wildlife Clatsop Plains Conservation Opportunity Area
o Arch Cape Creek-Frontal Pacific Ocean (HUC6 171002010105).
o Lower Necanicum River (HUC6 171002010103)
Comments received in response to this notice will be provided to the ILF Project sponsor and to the federal, state and local agencies represented on the mitigation project interagency review team. This team will work with the ILF Project sponsor to create a detailed ILF Project Mitigation Plan that will specify the ecological goals of the project, grading and planting plans, monitoring, maintenance, and the number and schedule of wetland credits to be made available when performance standards have been met.
Comments on this proposed mitigation project may be submitted in writing using the post office address below or online via the Corps website: http://www.nwp.usace.army.mil/Missions/Regulatory/Notices.aspx. Comments should be received no later than August 23, 2015.
Please provide comments to:
Tom Taylor
Portland District, Army Corps of Engineers
CENWP-OD-G
P.O. Box 2946
Portland, OR 97208
thomas.j.taylor@usace.army.mil
503-808-4386
Map 1. Location
Fort Stevens State Park
Clear Lake
Astoria
Warrenton
Juniper Ridge
Subdivision
R
CL A
RK
A ND
LEW
IS
K
,SF
NECANICU
ER
Gearhart
NIN
SKA
KLA
MR
Y CR
CULLAB
IR
LUSK
WAL
KL
AS
KA
NI
NE
R
CLATSOP COUNTY
YOUNGS
R
Seaside
BEE
RM
0
1.25
2.5
5
Miles
AN
C
R
±
Contact:
Sarah Kelly
Department of State Lands
541-388-6142
sarah.kelly@state.or.us
Map 3. Aerial
Clear Lake ILF Site Boundary
5t
h
4th
Ce
da
Bir
1s
t
2nd
Ceolan
in
er
Ald
Ma
Cedar
Juniper
7th
9th
8th
Main
9th
Main
Kali
ma
3rd
5th
8th
Kalima
er
1st
ch
Bir
Elm
Gardina
r
ch
Ha
r bo
Harbor
Ald
Ridge
Harbor
1st
Ce
da
r
1st
Da
te
Gardenia
r
3rd
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,
CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid,
10th
IGN, IGP, swisstopo, and the GIS User Community
0
495
990
Feet
1,980
±
Contact:
Sarah Kelly
Department of State Lands
541-388-6142
sarah.kelly@state.or.us
Map 4. Site Plan
5A
Road fill removal
Legend
Creation
Road fill removal
Enhancement
Preservation
Restoration
Site Boundary
All areas not shaded within
the site boundary are
upland buffers.
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,
CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid,
IGN, IGP, swisstopo, and the GIS User Community
0
155
310
Feet
620
±
Contact:
Sarah Kelly
Department of State Lands
541-388-6142
sarah.kelly@state.or.us
Map 5. Service Area
Clear Lake ILF
GNAT
C
Astoria
KI R
L US
WAL
Gearhart
KLASKANINE R, S
FK
YOUNGS
R
EH
ICUM R
LI
TT
LE
UM
W
FIS
HH
HA
W
K
G
BU
HU
AW
K
PLY
MP
TON
C
CR
CR
HU
CR
BUSTER CR
R
UG
MB
K
EL
R
Cannon Beach
U
MB
GR
FK
FALL CR
,W
N FK
CR
R,
ELK C
K
EL
NEL
AHE
M
R, N
±
SA
LM
O
K
FK
Miles
8
MR
NF
,S
LE
NEHA
R,
CR
CR
M
LE
HA
NE
Manzanita Nehalem
4
CK
RO
CK
RO
FK
*A
2
FI
SH
BE
NE
KE
NECAN
CR
Seaside
ER
P CR
KLA
SKA
NIN
THR
U
NECANICUM R
Lower Columbia Watershed
17080006
NOR
Part of the Necanicum
Watershed 17100201
R
BIG CR
Warrenton
0
R
NB
ER
RY
R
Contact:
Sarah Kelly
Department of State Lands
541-388-6142
sarah.kelly@state.or.us
Map 7. USGS Topo
Clear Lake ILF Site
Warrenton
LABY
CUL
CR
0
850
1,700
Feet
3,400
±
Contact:
Sarah Kelly
Department of State Lands
541-388-6142
sarah.kelly@state.or.us