The applicant has described the project as erosion repair and channel realignment for the purpose of protecting the existing North Fork Road bridge infrastructure. The applicant proposes to discharge dredged and fill material into 0.33 acre of the North Fork Anchor River (NFAR) below the ordinary high water mark (OHWM)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant has described the project as erosion repair and channel realignment for the purpose of protecting the existing North Fork Road bridge infrastructure. The applicant proposes to discharge dredged and fill material into 0.33 acre of the North Fork Anchor River (NFAR) below the ordinary high water mark (OHWM), and into 0.9 acre of wetlands adjacent to the NFAR. Please contact Michael Setering at (907) 753-2627 or by email at Michael.t.setering@usace.army.mil if further information is desired concerning this notice.

The applicant has described the project as erosion repair and channel realignment for the purpose of protecting the existing North Fork Road bridge infrastructure.The applicant proposes to discharge dredged and fill material into 0.33 acre of the North Fork Anchor River (NFAR) below the ordinary high water mark (OHWM), and into 0.9 acre of wetlands adjacent to the NFAR. Please contact Michael Setering at (907) 753-2627 or by email at Michael.t.setering@usace.army.mil if further information is desired concerning this notice.

POA 2015-435 North Fork Anchor River (1) POA-2015-435, drawings, North Fork Anchor River

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas