The applicant proposes to mechanically dredge approximately 22,000 cubic yards of material for the construction of a barge dock and boat slip.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to mechanically dredge approximately 22,000 cubic yards of material for the construction of a barge dock and boat slip. This project entails the construction of 448 linear feet of bulkhead, a 200-foot-long revetment, 3 new mooring dolphins, mooring piles, and a covered boat slip. The applicant proposes to discharge the 22,000 cubic yards of material into the Lost Lake Dredged Material Placement Area.