RESIDENTIAL SUBDIVISION IN CALCASIEU PARISH
NAME OF APPLICANT: Cross Diversified Development Corporation, Attn: Mr. Allan Cross, 1541 Clark Court, Lake Charles, Louisiana 70611.
LOCATION OF WORK: East side of North Perkins Ferry Road, North 30.355867, West -93.214028, approximately 0.75 miles north of the intersection with Joe Miller Road, in Moss Bluff, Louisiana, in Calcasieu Parish, as shown on the attached drawings. (Hydrologic Unit Code 08080206, Calcasieu River Basin)
CHARACTER OF WORK: Clear and grade a 12.3 acre tract, approximately 3,310 cubic yards of onsite earthen material would be cut and graded, with 2,800 cubic yards being placed for house pads, 1,910 cubic yards of clay and limestone would be deposited for streets and driveways, and 3,710 cubic yards of concrete for house slabs, streets, and driveways, all as required to create the 31 lot Phase III of Dreamview Estates single family residential subdivision. Approximately 2.6 acres of jurisdictional forested wetlands would be impacted through project implementation. To fulfill mitigation requirements the applicant will purchase mitigation credits from an approved mitigation bank within the immediate area of impact.
JOINT PUBLIC NOTICE
August 31, 2015
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification Sec.
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager: James W. Little, Jr.
(225) 342-3099 / fax: (225) 342-9439
James.little@usace.army.mil
Permit Application Number:
MVN-2012-00537-WII
Project Manager:
Elizabeth Johnson
(225) 219-3225 / fax: (225) 219-3156
WQC Application Number:
WQC 150810-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ X ] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
The application has also been mailed to the Louisiana Department of Environmental
Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained
in Louisiana Revised Statute 30:2074 A(3), and provisions of Section 401 of the Clean Water
Act (P.L. 95-17).
RESIDENTIAL SUBDIVISION IN CALCASIEU PARISH
NAME OF APPLICANT: Cross Diversified Development Corporation, Attn: Mr. Allan Cross,
1541 Clark Court, Lake Charles, Louisiana 70611.
LOCATION OF WORK: East side of North Perkins Ferry Road, North 30.355867, West 93.214028, approximately 0.75 miles north of the intersection with Joe Miller Road, in Moss
Bluff, Louisiana, in Calcasieu Parish, as shown on the attached drawings. (Hydrologic Unit
Code 08080206, Calcasieu River Basin)
CHARACTER OF WORK: Clear and grade a 12.3 acre tract, approximately 3,310 cubic yards
of onsite earthen material would be cut and graded, with 2,800 cubic yards being placed for
house pads, 1,910 cubic yards of clay and limestone would be deposited for streets and
driveways, and 3,710 cubic yards of concrete for house slabs, streets, and driveways, all as
required to create the 31 lot Phase III of Dreamview Estates single family residential
subdivision. Approximately 2.6 acres of jurisdictional forested wetlands would be impacted
through project implementation. To fulfill mitigation requirements the applicant will purchase
mitigation credits from an approved mitigation bank within the immediate area of impact.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be submitted so as to be received before or by the
last day of the comment period. Letters concerning the Corps of Engineers permit application
must reference the applicant's name and the Permit Application Number, and be forwarded to
the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH.
Individuals or parties may request an extension of time in which to comment on the proposed
work by writing, faxing, or e-mailing the Corps of Engineers Project Manager listed above. Any
request must be specific and substantively supportive of the requested extension, and received
by this office prior to the end of the initial comment period. The Section Chief will review the
request and the requestor will be promptly notified of the decision to grant or deny the request.
If granted, the time extension will be continuous to the initial comment period and, inclusive of
the initial comment period, will not exceed a total of 30 calendar days. Letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, pre-historical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
Based on the South Louisiana Standard Local Operating Procedure for Endangered
Species (SLOPES), as signed on October 22, 2014, between the U.S. Army Corps of
Engineers, New Orleans and the U.S. Fish and Wildlife Service, it has been determined that the
2.6 acres of jurisdictional forested wetlands to be impacted is suitable habitat for Red-cockaded
woodpecker (Picoides borealis ) and determined that the activity will have No effect on the
species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of N/A acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have
a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure