AFTER-THE-FACT DRAINAGE IMPROVEMENTS TO BO HARVEY LATERAL IN LIVINGSTON PARISH
NAME OF APPLICANT: Livingston Parish Gravity Drainage District No. 2, c/o D & S Environmental Services, Inc., Attn: Mr. David Templet, Post Office Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: On an approximate 6.05-acre project site, within the Amite River hydrologic unit (HUC 08070202), located in Sections 33 & 34, Township 5 South, Range 3 East, beginning at the intersection of Bo Harvey Lateral and Perkins Road proceeding westerly and terminating at Molar Bayou, near Denham Springs, Louisiana, in LIVINGSTON Parish, as shown on the enclosed drawings (Latitude 30.57660 N Longitude -90.89389 W).
The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have been deferred.
CHARACTER OF WORK: The applicant is requesting an after-the-fact Department of the Army permit to clear, grade, excavate, place and maintain fill material to implement the Bo Harvey Lateral drainage improvement project. The project areas totals approximately 8,289 linear feet of Bo Harvey Lateral. The project proposes to clear impeding vegetation within a 15-foot wide maintenance corridor, to install crushed concrete material within jurisdictional wetlands, as well as connecting lateral ditches within the corridor, and to de-silt(clean out) and reshape Bo Harvey Lateral. The placement of concrete fill material will be accomplished by the excavation of the top 6 inches of native material and the backfilling with concrete to an elevation that will ensure hydrological flow and connectivity to adjacent wetlands. Approximately 0.75 acre of jurisdictional wetlands and 2.29 acres of Other Waters of the United States would be impacted as a result of project implementation. Approximately 0.23 acre of jurisdictional wetlands and 0.01 acre of Other Waters of the United States would be avoided. Excavated materials will be distributed in non-wetlands onsite with any excess being redistributed in an approved upland location. Approximately 606 cubic yards of hauled in concrete material would be placed in jurisdictional areas during construction activities. The applicant is proposing to utilize appropriate erosion control methods and best management practices (BMPs) to be implemented onsite during and after the construction phase of the project. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant is proposing to contract with a Corps approved mitigation bank.
The applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of a permit is determined to be contrary to the overall public interest.
JOINT PUBLIC NOTICE
September 14, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Water Quality Certifications Section
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1217
Project Manager
Kenny Blanke
Kenneth.G.Blanke@usace.army.mil
MVN 2015-1782-CQ
(225) 219-3225
Project Manager
Ms. Elizabeth Johnson
WQC Application Number
WQC 150910-04
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean
Water Act (P.L.95-17).
AFTER-THE-FACT DRAINAGE IMPROVEMENTS TO BO HARVEY LATERAL
IN LIVINGSTON PARISH
NAME OF APPLICANT: Livingston Parish Gravity Drainage District No. 2, c/o D & S
Environmental Services, Inc., Attn: Mr. David Templet, Post Office Box 510, French Settlement,
Louisiana 70733.
LOCATION OF WORK: On an approximate 6.05-acre project site, within the Amite River
hydrologic unit (HUC 08070202), located in Sections 33 & 34, Township 5 South, Range 3 East,
beginning at the intersection of Bo Harvey Lateral and Perkins Road proceeding westerly and
terminating at Molar Bayou, near Denham Springs, Louisiana, in LIVINGSTON Parish, as
shown on the enclosed drawings (Latitude 30.57660 N Longitude -90.89389 W).
The work described below was partially completed prior to obtaining a Department of the Army
permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning
the unauthorized work have been deferred.
CHARACTER OF WORK: The applicant is requesting an after-the-fact Department of the
Army permit to clear, grade, excavate, place and maintain fill material to implement the Bo
Harvey Lateral drainage improvement project. The project areas totals approximately 8,289
linear feet of Bo Harvey Lateral. The project proposes to clear impeding vegetation within a 15foot wide maintenance corridor, to install crushed concrete material within jurisdictional
wetlands, as well as connecting lateral ditches within the corridor, and to de-silt(clean out) and
reshape Bo Harvey Lateral. The placement of concrete fill material will be accomplished by the
excavation of the top 6 inches of native material and the backfilling with concrete to an elevation
that will ensure hydrological flow and connectivity to adjacent wetlands. Approximately 0.75
acre of jurisdictional wetlands and 2.29 acres of Other Waters of the United States would be
impacted as a result of project implementation. Approximately 0.23 acre of jurisdictional
wetlands and 0.01 acre of Other Waters of the United States would be avoided. Excavated
materials will be distributed in non-wetlands onsite with any excess being redistributed in an
approved upland location. Approximately 606 cubic yards of hauled in concrete material would
be placed in jurisdictional areas during construction activities. The applicant is proposing to
utilize appropriate erosion control methods and best management practices (BMPs) to be
implemented onsite during and after the construction phase of the project. The applicant has
designed the project to avoid and minimize direct and secondary adverse impacts to the
maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant
is proposing to contract with a Corps approved mitigation bank.
The applicant may be required to fully or partially restore the project site to pre-project
conditions, if issuance of a permit is determined to be contrary to the overall public interest.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be mailed so as to be received before or by the last
day of the comment period. Letters concerning the Corps of Engineers permit application must
reference the applicant's name and the Permit Application Number, and be mailed to the Corps
of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Letters
concerning the Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental Quality at the
address above. The application for this proposed project is on file with the Louisiana
Department of Environmental Quality and may be examined during weekdays between 8:00
a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. Utilizing
Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated
October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity
would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of NA acres of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure