You can copy from here when filling out the rest of the page.
The applicant proposes to place fill material into 1.43 acres of wetlands.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to place fill material into 1.43 acres of wetlands for the construction of eight 217-foot diameter above-ground tanks on a 38.6-acre tract immediately adjacent to their existing facility. Construction of the project will consist of clearing vegetation, excavating, filling and grading the topography as necessary to provide suitable foundation for the facility construction. The project would impact 0.457 acre of scrub/shrub wetlands and 0.978 acre of forested wetlands for a total proposed impact of 1.43 acres. The wetland fill would allow expansion of the applicant’s existing oil tank farm for the purpose of increasing the storage capacity. The applicant’s plans are enclosed in four sheets.