The applicant, The National Park Service/ Kenai Fjords National Park, attn: Rebecca Lassell or Sharon Kim's, stated purpose is to maintain summer vehicular access to the Exit Glacier visitor use area in an area subject to annual seasonal flooding of the road from milepost seven to eight which has resulted in temporary road closures, public safety concerns, as well as road deterioration.

PROPOSED WORK: PROPOSED WORK: The applicant is proposing to discharge 26,000 cubic yards (cy) of aggregate material and 5,000 cy of of rip rap into 2.46 acres of wetlands to raise the existing road five feet, installation of four box culverts (6 feet wide by 5 feet tall), and the placement of rip rap on the south side of the road at a 2:1 slope. The work would occur over a distance of 5,400 linear feet of the current road alignment. All work would be performed in accordance with the enclosed plan, (sheets 1-2), dated August 17, 2015.

The applicant, The National Park Service/ Kenai Fjords National Park, attn: Rebecca Lassell or Sharon Kim's, stated purpose is to maintain summer vehicular access to the Exit Glacier visitor use area in an area subject to annual seasonal flooding of the road from milepost seven to eight which has resulted in temporary road closures, public safety concerns, as well as road deterioration. PROPOSED WORK: PROPOSED WORK: The applicant is proposing to discharge 26,000 cubic yards (cy) of aggregate material and 5,000 cy of of rip rap into 2.46 acres of wetlands to raise the existing road five feet, installation of four box culverts (6 feet wide by 5 feet tall), and the placement of rip rap on the south side of the road at a 2:1 slope. The work would occur over a distance of 5,400 linear feet of the current road alignment. All work would be performed in accordance with the enclosed plan (sheets 1-2), dated August 17, 2015. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Andy Mitzel at (907) 753-2689, by fax at (907) 753-2689, or by email at andy.mitzel@usace.army.mil if further information is desired concerning this notice. POA-2012-303, Resurrection River_PN.pdf

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas