The applicant proposes an amendment to deepen the authorized depth of the area.

Full Public NoticeProject Plans The applicant proposes an amendment to deepen the authorized depth of the area composing the east and west slips by the existing OXY Ingleside Energy pier from -45.7 feet mean lower low water (MLLW) to a total depth of -58.2 feet MLLW, which includes an allowable 2-foot over-dredge. Approximately 67 acres would be dredged using mechanical and/or hydraulic methods. Approximately 478,489 cubic yards of material would be removed and placed into existing placement areas that would include: Good Hope, DMPA No. 10, DMPA No. 13, and Berry Island. The purpose of the project is to allow the berthing of deeper draft ships. Seagrasses are present in the west slip area, but would not be disturbed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas