MODIFICATION TO MORGANZA TO THE GULF REACH G2 AND H1 ALIGNMENT IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363.

LOCATION OF WORK: On an approximate 120-acre project site, in Sections 15, 22-25, 85-88,112, 113, Township 20 South, Ranges 17 and 18 East, within the West Central Louisiana Coastal hydrologic unit (HUC 08090302), along the existing Mayfield levee to LA Highway 56, near Dulac and Chauvin, Louisiana, in TERRBONNE Parish, as shown on the enclosed drawings (Latitude 29.331944 N Longitude -90.716111 W).

CHARACTER OF WORK: The applicant is requesting a modification to a previously authorized Department of the Army permit to construct the Morganza to the Gulf Reach G2 and H1 Alignment levee project. The modification proposes to modify the closure point in Four Point Bayou, to remove an existing culvert and widen and enlarge an existing trenasse, and to construct four environmental control structures (each consisting of six (6) 6’ x 6’ box culverts with sluice gates) along the levee alignment. An earthen plug is proposed to be constructed for the closure of Four Point Bayou and the barge closure structure being utilized in the Bayou Petit Caillou structure is proposed to be increased from a 58-foot barge structure to a 118-foot barge structure. Also, an additional access road is proposed to be constructed with a 48-inch culvert crossing. The original permit authorization (MVN-2011-1088-WJJ) was issued on April 30, 2013. Approximately 1,223,420 cubic yards of total fill material would be placed during project construction activities. The applicant has stated that the Bayou Petit Caillou flood gate is approximately 80% complete, the roller gate and LA Highway 56 elevation is approximately 70% complete, and the levee system is at 50% completion. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The approved mitigation project, consisting of creating 201 acres of brackish marsh south of the proposed levee, is not proposed to change based on this permit modification request.

JOINT PUBLIC NOTICE September 28, 2015 United States Army Corps of Engineers New Orleans District Regulatory Branch Post Office Box 60267 New Orleans, Louisiana 70160-0267

State of Louisiana Department of Environmental Quality Water Quality Certifications Section Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1217 Project Manager Kenny Blanke Kenneth.G.Blanke@usace.army.mil MVN 2011-1088-CQ

(225) 219-3225 Project Manager Ms. Elizabeth Johnson WQC Application Number WQC 110503-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). MODIFICATION TO MORGANZA TO THE GULF REACH G2 AND H1 ALIGNMENT IN TERREBONNE PARISH NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363. LOCATION OF WORK: On an approximate 120-acre project site, in Sections 15, 22-25, 8588,112, 113, Township 20 South, Ranges 17 and 18 East, within the West Central Louisiana Coastal hydrologic unit (HUC 08090302), along the existing Mayfield levee to LA Highway 56, near Dulac and Chauvin, Louisiana, in TERRBONNE Parish, as shown on the enclosed drawings (Latitude 29.331944 N Longitude -90.716111 W). CHARACTER OF WORK: The applicant is requesting a modification to a previously authorized Department of the Army permit to construct the Morganza to the Gulf Reach G2 and H1 Alignment levee project. The modification proposes to modify the closure point in Four Point Bayou, to remove an existing culvert and widen and enlarge an existing trenasse, and to construct four environmental control structures (each consisting of six (6) 6' x 6' box culverts with sluice gates) along the levee alignment. An earthen plug is proposed to be constructed for the closure of Four Point Bayou and the barge closure structure being utilized in the Bayou Petit Caillou structure is proposed to be increased from a 58-foot barge structure to a 118-foot barge structure. Also, an additional access road is proposed to be constructed with a 48-inch culvert crossing. The original permit authorization (MVN-2011-1088-WJJ) was issued on April 30, 2013. Approximately 1,223,420 cubic yards of total fill material would be placed during project construction activities. The applicant has stated that the Bayou Petit Caillou flood gate is approximately 80% complete, the roller gate and LA Highway 56 elevation is approximately 70% complete, and the levee system is at 50% completion. The applicant has designed the project

to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The approved mitigation project, consisting of creating 201 acres of brackish marsh south of the proposed levee, is not proposed to change based on this permit modification request. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing Standard Local The proposed activity is located in areas known to be utilized by the West Indian manatee (Trichechus manatus). Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has

determined that the proposed activity is not likely to adversely affect this species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 400 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch Enclosure

F

Houma

Gulf Intracoastal Waterway

V U

Dularge

Lake Decade

V V U U 55

665

Montegut

V U 57

Houma

Navigati

on Cana l

315

Chauvin Lake Boudreaux

V U 56

Dulac

PROPOSED PROJECT LOCATION

Lake Barre Copyright: © 2013 National Geographic Society

VICINITY MAP 4

Date: 04/18/11 Scale: 1"=4 mi

0

Drawn By: CDL Approved By: JMP

4

8 Miles Sheet No.:

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA Revisions

Notes: Revision No.: Date: Sheet No.: 1 OF 14 06/10/13 revise structure 5 File No.: 04/21/15 alignment & structure 6 Reach G2 H1/PERMITS 07/09/15 Labeling (USACE req) 7

197 Elysian Drive, Houma, LA 70363

F

Point of Beginning Lat. 29° 19' 55" Long. 90° 42' 58"

a um Ho

Proposed Road Ramp (new)

C on a ti vig Na

Proposed Environmental Control Structure (to be constructed)

al an

Proposed Levee (under construction)

"

Proposed Access Road (constructed)

Proposed Earthen Plug (new) Proposed Environmental Control Structure (to be constructed)

57 U V

Proposed Environmental Control Structure (to be constructed)

Proposed Access Road (constructed)

" Bayou

Bayou Petit Caillou Structure (constructed)

ou

Point of Ending Lat. 29° 17' 47" Long. 90° 38' 58"

ill Ca Peti t

Proposed Environmental Control Structure (to be constructed)

Copyright: © 2013 National Geographic Society

PROJECT ALIGNMENT 3,000

Date: 04/18/11 Scale: 1"=3000'

0

Drawn By: CDL Approved By: JMP

3,000

6,000 Feet Sheet No.:

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA Revisions

Revision No.: Date: Sheet No.: 2 OF 14 06/10/13 5 File No.: 04/21/15 6 Reach G2 H1/PERMITS 07/09/15 7

Notes: revise structure alignment & structure Labeling (USACE req)

197 Elysian Drive, Houma, LA 70363

Previously Permitted Reach G1 Levee

F

Point of Beginning Lat. 29° 19' 55" Long. 90° 42' 58"

Ba yo u

ur Fo

Point of Beginning Mayfield Levee Degrading

int Po Fo

Originally Permitted ROW

ur Po in t

a Ro d

Levee Centerline (under construction)

Levee ROW (under construction)

Levee Toe and ROW (under construction)

Legend Modified Alignment See Sheet 9 for Typical Section A

Centerline Levee Toe ROW

Original Permitted Alignment ROW MATCH LINE

PLAN VIEW 600

Date: 04/18/11 Scale: 1"=600'

0

Drawn By: CDL Approved By: JMP

600

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA

1,200 Feet Sheet No.: Sheet No.: 3 OF 14 File No.: Reach G2 H1/PERMITS

Revisions Notes: Revision No.: Date: 06/10/13 revise structure 5 04/21/15 alignment & structure 6 7

07/09/15

Labeling (USACE req)

197 Elysian Drive, Houma, LA 70363

MATCH LINE

Sweetwater Pond

Point of Ending Mayfield Levee Degrading

F

Legend Modified Alignment Road Alignment Road Elevation ROW Centerline Levee Toe

Levee ROW (under construction)

ROW

Proposed Plug (new) (See Sheet 14 for Section)

Original Permitted Alignment ROW Borrow

Originally Permitted Borrow

Originally Permitted ROW

"

Originally Permitted ROW Levee ROW (under construction)

Proposed Road Ramp (new) (See Sheet 10 for Section)

Levee Toe (under construction)

Levee Centerline (under construction) See Sheet 9 for Typical Section B

PLAN VIEW 600

Date: 04/18/11 Scale: 1"=600'

0

Drawn By: CDL Approved By: JMP

LIN

Proposed Environmental Control Structure (4 - 6'x6' Box Culverts with Sluice Gates)

600

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA

1,200 Feet Sheet No.: Sheet No.: 4 OF 14 File No.: Reach G2 H1/PERMITS

MAT CH

oad i nt R Four Po oi nt our P Bayou F

E

Proposed Environmental Control Structure (6 - 6'x6' Box Culverts with Sluice Gates)

Revisions Revision No.: Date:

Notes:

5 6

06/10/13 04/21/15

revised structure alignment & structure

7

07/09/15

Labeling (USACE req)

197 Elysian Drive, Houma, LA 70363

F

7 y. 5 Hw (B a

Legend

) oa d

Levee Toe

Originally Permitted Borrow Limits

eR

Centerline

S al

Access Road/Staging Area

you

Modified Alignment

Originally Permitted ROW

ROW

E

Original Permitted Alignment MAT CH

LIN

ROW Borrow

Access Road with 48" Culvert (See Sheet 14 for Typical Section) Levee Centerline (under construction) Levee Toe (under construction)

Proposed Environmental Control Structure (4 - 6'x6' Box Culverts with Sluice Gates) Levee ROW (under construction)

H TC MA

PLAN VIEW 600

Date: 04/18/11 Scale: 1"=600'

0

Drawn By: CDL Approved By: JMP

600

Sheet No.:

File No.: Reach G2 H1/PERMITS

NE

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA

1,200 Feet

Sheet No.: 5 OF 14

LI

Revisions Revision No.: Date: 5 06/10/13 6 04/21/15 7

07/09/15

Notes: revised structure alignment & structure Labeling (USACE req)

197 Elysian Drive, Houma, LA 70363

H TC MA

LI

NE

Originally Permitted ROW

F

Legend

Modified Alignment Centerline Levee Toe ROW

Original Permitted Alignment

Levee Toe (under construction)

ROW ( 57 y. Hw yo Ba

uS R ale

Levee ROW (under construction)

) o ad

Levee Centerline (under construction)

Levee ROW (under construction)

H TC MA

PLAN VIEW 600

Date: 04/18/11 Scale: 1"=600'

0

Drawn By: CDL Approved By: JMP

600

1,200 Feet Sheet No.:

LI

NE

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA Revisions

Notes: Revision No.: Date: Sheet No.: 6 OF 14 5 06/10/13 revised structure File No.: 6 04/21/15 alignment & structure Reach G2 H1/PERMITS 07/09/15 Labeling (USACE req) 7

197 Elysian Drive, Houma, LA 70363

Ro

ad

)

Sa

le

Modified Alignment

Ba

you

Access Road/Staging Area Centerline Levee Toe ROW

7( .5

Hw

y

F

Legend

Original Permitted Alignment

T MA

LI

NE

Levee Toe & ROW (under construction)

Originally Permitted ROW and Borrow Limits

Proposed Access Road with 48" Culvert (See Sheet 14 for Typical Section)

Point of Ending Lat. 29° 17' 47" Long. 90° 38' 58"

Levee Centerline (under construction)

PLAN VIEW 800

Date: 04/18/11 Scale: 1"=800'

0

Drawn By: CDL Approved By: JMP

800

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA

1,600 Feet Sheet No.: Sheet No.: 7 OF 14 File No.: Reach G2 H1/PERMITS

Bayou Petit Caillou Structure (See Sheets 10 & 11 for Details)

lou etit Cail

Levee Toe (under construction)

Bayou P

Temp By-Pass Road (See Sheet 12)

Proposed Environmental Control Structures (6 - 6'x6' Box Culverts with Sluice Gates)

Levee ROW (under construction)

Reach H2 Leve e

CH

Hwy. 56

ROW Borrow

Revisions Revision No.: Date: 5 6 7

06/10/13

Notes: revised structure

04/21/15 alignment & structure 07/09/15 Labeling (USACE req)

197 Elysian Drive, Houma, LA 70363

F

Sweetwater Pond

Proposed trenasse (25' X 500')

Remove Existing Culvert

uF Ba u yo

int

d

r Po

Ro a

ou

int Po

yo

ur

Ba

Fo

Sa le

200

100

0

200

Rd

Enlarge Existing Trenasse (See Sheet 14 for Typical Section)

Proposed Levee

400

Feet

"

Proposed Levee Centerline

PLAN VIEW 1,000

Date: 04/18/11 Scale: 1"=600'

0

Drawn By: CDL Approved By: JMP

1,000

2,000 Feet Sheet No.: Sheet No.: 8 OF 14 File No.: Reach G2 H1/PERMITS

TERREBONNE LEVEE & CONSERVATION DISTRICT PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E TERREBONNE PARISH, LOUISIANA Revisions

Notes: Revision No.: Date: 5 06/10/13 revised structure 6 04/21/15 alignment & structure 7

07/09/15

Labeling (USACE req)

197 Elysian Drive, Houma, LA 70363

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas