MODIFICATION TO MORGANZA TO THE GULF REACH G2 AND H1 ALIGNMENT IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363.
LOCATION OF WORK: On an approximate 120-acre project site, in Sections 15, 22-25, 85-88,112, 113, Township 20 South, Ranges 17 and 18 East, within the West Central Louisiana Coastal hydrologic unit (HUC 08090302), along the existing Mayfield levee to LA Highway 56, near Dulac and Chauvin, Louisiana, in TERRBONNE Parish, as shown on the enclosed drawings (Latitude 29.331944 N Longitude -90.716111 W).
CHARACTER OF WORK: The applicant is requesting a modification to a previously authorized Department of the Army permit to construct the Morganza to the Gulf Reach G2 and H1 Alignment levee project. The modification proposes to modify the closure point in Four Point Bayou, to remove an existing culvert and widen and enlarge an existing trenasse, and to construct four environmental control structures (each consisting of six (6) 6’ x 6’ box culverts with sluice gates) along the levee alignment. An earthen plug is proposed to be constructed for the closure of Four Point Bayou and the barge closure structure being utilized in the Bayou Petit Caillou structure is proposed to be increased from a 58-foot barge structure to a 118-foot barge structure. Also, an additional access road is proposed to be constructed with a 48-inch culvert crossing. The original permit authorization (MVN-2011-1088-WJJ) was issued on April 30, 2013. Approximately 1,223,420 cubic yards of total fill material would be placed during project construction activities. The applicant has stated that the Bayou Petit Caillou flood gate is approximately 80% complete, the roller gate and LA Highway 56 elevation is approximately 70% complete, and the levee system is at 50% completion. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The approved mitigation project, consisting of creating 201 acres of brackish marsh south of the proposed levee, is not proposed to change based on this permit modification request.
JOINT PUBLIC NOTICE
September 28, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Water Quality Certifications Section
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1217
Project Manager
Kenny Blanke
Kenneth.G.Blanke@usace.army.mil
MVN 2011-1088-CQ
(225) 219-3225
Project Manager
Ms. Elizabeth Johnson
WQC Application Number
WQC 110503-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean
Water Act (P.L.95-17).
MODIFICATION TO MORGANZA TO THE GULF REACH G2 AND H1 ALIGNMENT
IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms.
Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363.
LOCATION OF WORK: On an approximate 120-acre project site, in Sections 15, 22-25, 8588,112, 113, Township 20 South, Ranges 17 and 18 East, within the West Central Louisiana
Coastal hydrologic unit (HUC 08090302), along the existing Mayfield levee to LA Highway 56,
near Dulac and Chauvin, Louisiana, in TERRBONNE Parish, as shown on the enclosed
drawings (Latitude 29.331944 N Longitude -90.716111 W).
CHARACTER OF WORK: The applicant is requesting a modification to a previously authorized
Department of the Army permit to construct the Morganza to the Gulf Reach G2 and H1
Alignment levee project. The modification proposes to modify the closure point in Four Point
Bayou, to remove an existing culvert and widen and enlarge an existing trenasse, and to
construct four environmental control structures (each consisting of six (6) 6' x 6' box culverts
with sluice gates) along the levee alignment. An earthen plug is proposed to be constructed for
the closure of Four Point Bayou and the barge closure structure being utilized in the Bayou Petit
Caillou structure is proposed to be increased from a 58-foot barge structure to a 118-foot barge
structure. Also, an additional access road is proposed to be constructed with a 48-inch culvert
crossing. The original permit authorization (MVN-2011-1088-WJJ) was issued on April 30,
2013. Approximately 1,223,420 cubic yards of total fill material would be placed during project
construction activities. The applicant has stated that the Bayou Petit Caillou flood gate is
approximately 80% complete, the roller gate and LA Highway 56 elevation is approximately 70%
complete, and the levee system is at 50% completion. The applicant has designed the project
to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable.
The approved mitigation project, consisting of creating 201 acres of brackish marsh south of the
proposed levee, is not proposed to change based on this permit modification request.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the proposed
work, stating reasons thereof, are being solicited from anyone having interest in this permit
and/or this WQC request and must be mailed so as to be received before or by the last day of
the comment period. Letters concerning the Corps of Engineers permit application must
reference the applicant's name and the Permit Application Number, and be mailed to the Corps
of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Letters
concerning the Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental Quality at the
address above. The application for this proposed project is on file with the Louisiana
Department of Environmental Quality and may be examined during weekdays between 8:00
a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species. Utilizing Standard Local The
proposed activity is located in areas known to be utilized by the West Indian manatee
(Trichechus manatus). Utilizing Standard Local Operating Procedure for Endangered Species
in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers,
New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has
determined that the proposed activity is not likely to adversely affect this species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of 400 acres of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. The applicant has certified that
the proposed activity described in the application complies with and will be conducted in a
manner that is consistent with the Louisiana Coastal Resources Program. The Department of
the Army permit will not be issued unless the applicant received approval or a waiver of the
Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
F
Houma
Gulf Intracoastal Waterway
V
U
Dularge
Lake Decade
V
V U
U
55
665
Montegut
V
U
57
Houma
Navigati
on Cana
l
315
Chauvin
Lake
Boudreaux
V
U
56
Dulac
PROPOSED PROJECT
LOCATION
Lake Barre
Copyright: © 2013 National Geographic Society
VICINITY MAP
4
Date:
04/18/11
Scale:
1"=4 mi
0
Drawn By:
CDL
Approved By:
JMP
4
8
Miles
Sheet No.:
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
Revisions
Notes:
Revision No.: Date:
Sheet No.: 1 OF 14
06/10/13
revise structure
5
File No.:
04/21/15 alignment & structure
6
Reach G2 H1/PERMITS
07/09/15 Labeling (USACE req)
7
197 Elysian Drive, Houma, LA 70363
F
Point of Beginning
Lat. 29° 19' 55"
Long. 90° 42' 58"
a
um
Ho
Proposed Road Ramp
(new)
C
on
a ti
vig
Na
Proposed Environmental
Control Structure (to be
constructed)
al
an
Proposed Levee
(under construction)
"
Proposed
Access Road
(constructed)
Proposed Earthen
Plug (new)
Proposed Environmental
Control Structure (to be
constructed)
57
U
V
Proposed Environmental
Control Structure (to be
constructed)
Proposed
Access Road
(constructed)
"
Bayou
Bayou Petit
Caillou Structure
(constructed)
ou
Point of Ending
Lat. 29° 17' 47"
Long. 90° 38' 58"
ill
Ca
Peti t
Proposed Environmental
Control Structure (to be
constructed)
Copyright: © 2013 National Geographic Society
PROJECT ALIGNMENT
3,000
Date:
04/18/11
Scale:
1"=3000'
0
Drawn By:
CDL
Approved By:
JMP
3,000
6,000
Feet
Sheet No.:
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
Revisions
Revision No.: Date:
Sheet No.: 2 OF 14
06/10/13
5
File No.:
04/21/15
6
Reach G2 H1/PERMITS
07/09/15
7
Notes:
revise structure
alignment & structure
Labeling (USACE req)
197 Elysian Drive, Houma, LA 70363
Previously Permitted
Reach G1 Levee
F
Point of Beginning
Lat. 29° 19' 55"
Long. 90° 42' 58"
Ba
yo
u
ur
Fo
Point of Beginning
Mayfield Levee Degrading
int
Po
Fo
Originally
Permitted ROW
ur
Po
in t
a
Ro
d
Levee Centerline
(under construction)
Levee ROW
(under construction)
Levee Toe and
ROW (under construction)
Legend
Modified Alignment
See Sheet 9 for Typical Section A
Centerline
Levee Toe
ROW
Original Permitted Alignment
ROW
MATCH LINE
PLAN VIEW
600
Date:
04/18/11
Scale:
1"=600'
0
Drawn By:
CDL
Approved By:
JMP
600
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
1,200
Feet
Sheet No.:
Sheet No.: 3 OF 14
File No.:
Reach G2 H1/PERMITS
Revisions
Notes:
Revision No.: Date:
06/10/13
revise structure
5
04/21/15 alignment & structure
6
7
07/09/15
Labeling (USACE req)
197 Elysian Drive, Houma, LA 70363
MATCH LINE
Sweetwater Pond
Point of Ending
Mayfield Levee Degrading
F
Legend
Modified Alignment
Road Alignment
Road Elevation ROW
Centerline
Levee Toe
Levee ROW
(under construction)
ROW
Proposed Plug (new)
(See Sheet 14 for Section)
Original Permitted Alignment
ROW
Borrow
Originally
Permitted Borrow
Originally
Permitted ROW
"
Originally
Permitted ROW
Levee ROW
(under construction)
Proposed Road Ramp (new)
(See Sheet 10 for Section)
Levee Toe
(under construction)
Levee Centerline
(under construction)
See Sheet 9 for Typical Section B
PLAN VIEW
600
Date:
04/18/11
Scale:
1"=600'
0
Drawn By:
CDL
Approved By:
JMP
LIN
Proposed Environmental
Control Structure
(4 - 6'x6' Box Culverts with
Sluice Gates)
600
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
1,200
Feet
Sheet No.:
Sheet No.: 4 OF 14
File No.:
Reach G2 H1/PERMITS
MAT
CH
oad
i nt R
Four Po
oi nt
our P
Bayou F
E
Proposed Environmental
Control Structure
(6 - 6'x6' Box Culverts with
Sluice Gates)
Revisions
Revision No.: Date:
Notes:
5
6
06/10/13
04/21/15
revised structure
alignment & structure
7
07/09/15
Labeling (USACE req)
197 Elysian Drive, Houma, LA 70363
F
7
y. 5
Hw
(B a
Legend
)
oa d
Levee Toe
Originally Permitted
Borrow Limits
eR
Centerline
S al
Access Road/Staging Area
you
Modified Alignment
Originally
Permitted ROW
ROW
E
Original Permitted Alignment
MAT
CH
LIN
ROW
Borrow
Access Road with 48" Culvert
(See Sheet 14 for Typical Section)
Levee Centerline
(under construction)
Levee Toe
(under construction)
Proposed Environmental
Control Structure
(4 - 6'x6' Box Culverts
with Sluice Gates)
Levee ROW
(under construction)
H
TC
MA
PLAN VIEW
600
Date:
04/18/11
Scale:
1"=600'
0
Drawn By:
CDL
Approved By:
JMP
600
Sheet No.:
File No.:
Reach G2 H1/PERMITS
NE
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
1,200
Feet
Sheet No.: 5 OF 14
LI
Revisions
Revision No.: Date:
5
06/10/13
6
04/21/15
7
07/09/15
Notes:
revised structure
alignment & structure
Labeling (USACE req)
197 Elysian Drive, Houma, LA 70363
H
TC
MA
LI
NE
Originally
Permitted ROW
F
Legend
Modified Alignment
Centerline
Levee Toe
ROW
Original Permitted Alignment
Levee Toe
(under construction)
ROW
(
57
y.
Hw
yo
Ba
uS
R
ale
Levee ROW
(under construction)
)
o ad
Levee Centerline
(under construction)
Levee ROW
(under construction)
H
TC
MA
PLAN VIEW
600
Date:
04/18/11
Scale:
1"=600'
0
Drawn By:
CDL
Approved By:
JMP
600
1,200
Feet
Sheet No.:
LI
NE
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
Revisions
Notes:
Revision No.: Date:
Sheet No.: 6 OF 14
5
06/10/13
revised structure
File No.:
6
04/21/15
alignment & structure
Reach G2 H1/PERMITS
07/09/15 Labeling (USACE req)
7
197 Elysian Drive, Houma, LA 70363
Ro
ad
)
Sa
le
Modified Alignment
Ba
you
Access Road/Staging Area
Centerline
Levee Toe
ROW
7(
.5
Hw
y
F
Legend
Original Permitted Alignment
T
MA
LI
NE
Levee Toe & ROW
(under construction)
Originally Permitted
ROW and Borrow Limits
Proposed Access Road with
48" Culvert (See Sheet 14
for Typical Section)
Point of Ending
Lat. 29° 17' 47"
Long. 90° 38' 58"
Levee Centerline
(under construction)
PLAN VIEW
800
Date:
04/18/11
Scale:
1"=800'
0
Drawn By:
CDL
Approved By:
JMP
800
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
1,600
Feet
Sheet No.:
Sheet No.: 7 OF 14
File No.:
Reach G2 H1/PERMITS
Bayou Petit Caillou
Structure (See Sheets
10 & 11 for Details)
lou
etit Cail
Levee Toe
(under construction)
Bayou P
Temp By-Pass Road
(See Sheet 12)
Proposed Environmental
Control Structures
(6 - 6'x6' Box Culverts
with Sluice Gates)
Levee ROW
(under construction)
Reach H2 Leve
e
CH
Hwy. 56
ROW
Borrow
Revisions
Revision No.: Date:
5
6
7
06/10/13
Notes:
revised structure
04/21/15 alignment & structure
07/09/15 Labeling (USACE req)
197 Elysian Drive, Houma, LA 70363
F
Sweetwater Pond
Proposed trenasse
(25' X 500')
Remove Existing Culvert
uF
Ba
u
yo
int
d
r Po
Ro a
ou
int
Po
yo
ur
Ba
Fo
Sa
le
200
100
0
200
Rd
Enlarge Existing Trenasse
(See Sheet 14 for Typical Section)
Proposed Levee
400
Feet
"
Proposed Levee
Centerline
PLAN VIEW
1,000
Date:
04/18/11
Scale:
1"=600'
0
Drawn By:
CDL
Approved By:
JMP
1,000
2,000
Feet
Sheet No.:
Sheet No.: 8 OF 14
File No.:
Reach G2 H1/PERMITS
TERREBONNE LEVEE & CONSERVATION DISTRICT
PROPOSED REACH G2 AND REACH H1 LEVEE AND STRUCTURES
SECTIONS 15 & 22-25, T20S-R17E and SECTIONS 85-88, 112, & 113, T20S-R18E
TERREBONNE PARISH, LOUISIANA
Revisions
Notes:
Revision No.: Date:
5
06/10/13
revised structure
6
04/21/15 alignment & structure
7
07/09/15
Labeling (USACE req)
197 Elysian Drive, Houma, LA 70363