Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

FILL FOR PROPSED COMMERCIAL DEVELOPMENT SHADOWBROOK LAKES II IN EAST BATON ROUGE PARISH

NAME OF APPLICANT: Shadowbrook Lakes II, LLC, c/o ELOS Environmental, LLC, Attn: Kristin Broom, 43177 East Pleasant Ridge Road, Hammond, Louisiana 70403. LOCATION OF WORK: South Harrells Ferry Road, in Baton Rouge, Louisiana, in East Baton Rouge Parish, within the Amite River Basin, in hydrologic unit (HUC 08070202), as shown on the attached drawings. The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to deposit approximately 4,453 cubic yards of clay fill and concrete to achieve required grade elevation requirements for the construction and maintenance of a commercial development, roadways, drainage infrastructure, and utilities. The proposed project is situated on an approximately 8.4-acre parcel that includes 0.35 acre of jurisdictional herbaceous wetlands and approximately 0.53 acre of “other waters of the US” which have already been filled as part of an unauthorized activity. The proposed project will permanently impact approximately 0.35 acre of herbaceous wetlands and 0.53 acre of “other waters of the US”. It is anticipated that the proposed action would have minimal impact on adjacent wetlands. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and function, therefore deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed. The applicant may be required to fully or partially restore the site to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas