Home

Norfolk District

Run scraper

The purpose of this document is to provide information for prospective users of the Nationwide Permits (NWPs) that are not federal agencies to help them determine whether a proposed NWP activity requires a pre-construction notification (PCN) to ensure compliance with the Endangered Species Act (ESA). For the 2012 NWPs

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The purpose of this document is to provide information for prospective users of the Nationwide Permits (NWPs) that are not federal agencies to help them determine whether a proposed NWP activity requires a pre-construction notification (PCN) to ensure compliance with the Endangered Species Act (ESA).

For the 2012 NWPs, ESA Section 7 compliance is covered by NWP General Condition 18.

The purpose of this document is to provide information for prospective users of the Nationwide Permits (NWPs) that are not federal agencies to help them determine whether a proposed NWP activity requires a pre-construction notification (PCN) to ensure compliance with the Endangered Species Act (ESA). For the 2012 NWPs, ESA Section 7 compliance is covered by NWP General Condition 18. If you have any questions about this public notice, contact John Evans at John.d.evans@usace.army.mil.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas