Melody White is the Regulatory point-of-contact for two permit applications for related projects from the Port of Kalama and Northwest Pipeline, LLC, to conduct work impacting the Columbia River near Kalama, Washington.

Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management Consistency Concurrence

US Army Corps of Engineers Regulatory Branch Post Office Box 2946 Portland, OR 97208-2946 Telephone (503) 808-4385 Attn: Melody White, Project Manager

WA Department of Ecology SEA Program Post Office Box 47600 Olympia, WA 98504-7600 Telephone (360) 407-6068 Attn: SEA Program, Federal Permit Coordinator

Public Notice Date:October 9, 2015 Expiration Date:November 9, 2015 Reference No.:NWP-2014-177/2 Name:Port of Kalama Reference No.:NWP-2015-111 Name:Northwest Pipeline, LLC

Interested parties are hereby notified that the U.S. Army Corps of Engineers (Corps) and the Washington Department of Ecology (Ecology) have received an application to perform work in waters of the United States as described below and shown on the enclosed drawings.

The Corps will review the work in accordance with Section 404 of the Clean Water Act (CWA) and Section 10 of the Rivers and Harbors Act. Ecology will review the work pursuant to Section 401 of the CWA, with applicable provisions of State water pollution control laws.

This public notice encompasses the work of two projects: NWP-2014-177/2 (Kalama Manufacturing and Marine Export Facility) and NWP-2015-111 (Kalama Lateral Project).

NWP-2014-177/2: NWP-2015-111:

APPLICANT:Port of Kalama 110 West Marine Drive Kalama, Washington 98625 ATTN: Tabitha Reeder Telephone: (360) 673-2325

APPLICANT:Northwest Pipeline LLC 295 Chipeta Way Salt Lake City, Utah 84108 ATTN: Lenor Komatar Telephone: (801) 584-6259

AGENT:BergerABAM 210 East 13th Street, Suite 300 Vancouver, Washington 98660 ATTN: Dan Gunderson Telephone: (360) 823-6100

AGENT:Northwest Pipeline LLC 295 Chipeta Way Salt Lake City, Utah 84108 ATTN: Kris Thorne Telephone: (801) 584-6474

LOCATION:

NWP-2014-177/2: The project is located in the Columbia River at River Mile 72, at the Port of Kalama, at the terminus of Tradewinds Road, Kalama, Cowlitz County, Washington (Sections 25 and 36, Township 7 North, Range 2 West, and Section31, Township 7 North, Range 1 West). The coordinates of the project are 46.043235° North, 122.87678° West.

NWP-2015-111: The 3.1-mile linear project is located in water bodies and wetlands in Kalama, Cowlitz County, Washington (Sections 28, 29, 31, 32, 33, Township 7 North, Range 1 West, and Section 36, Township 7 North, Range 2 West). The starting coordinates of the project are 46.053155 ° North, 122.812895° West. The ending coordinates of the project are 46.047724° North, 122.866394° West. The project would begin near Mile Post (MP) 1254.1 of the existing northwest mainline system. The route runs west following the Mt. Pleasant ridgeline for approximately 0.8 mile, then turning sharply southwest for 0.1 mile crossing the intersection of Raven Ridge and Hale Barber Roads. After crossing the intersection, the route continues southwest following Raven Ridge Road and the Mt. Pleasant ridgeline for about 0.3 mile before heading down slope in a westerly direction toward the floodplain of the Kalama River for 0.8 mile passing the north side of the Kress Lake recreation area. From there, the pipeline route continues to the northwest, crossing the Olympic Pipeline right-of-way, a Bonneville Power Administration power line right-of-way, and Old Highway99 before turning southwest and crossing Interstate 5 (I-5) and the Burlington Northern Santa Fe Railroad line. After crossing the railroad, the pipeline would enter the Methanol Plant site.

WORK:

NWP-2014-177/2: The proposed project involves construction of the Kalama Manufacturing and Marine Export Facility to manufacture and export methanol.

Marine Terminal Construction The proposed project involves the construction of a new marine terminal located on the Columbia River at River Mile 72. The marine terminal will consist of a dock, a berth, loading equipment, utilities, and a stormwater system. The terminal will consist of a single berth to accommodate the oceangoing tankers that will transport methanol to destination ports. The dock will be designed to accommodate oceangoing vessels. An estimated 3 to 6 ships per month will use the terminal based on the production of the plant. The berth will be designed to accommodate other vessel types and, when not in use for loading methanol, will be made available for general use by the Port, primarily as a lay berth where vessels could moor while waiting to use other Port berths and for cleaning holds.

The dock will consist of a transition platform, berth trestle, and turning platform. A single access trestle will be constructed measuring 34 feet wide and approximately 365 feet long to provide vehicle, equipment, and emergency access to the dock. From the access trestle, the berth face of the dock will extend approximately 530 feet downstream, and will consist of an approximately 100-foot by 54-foot transition platform, a 370-foot by 36-foot berth trestle, and a 104-foot by 112-foot turning platform. The dock will be supported by precast 24-inch octagonal concrete piles supporting a cast-in-place (CIP) concrete pile caps and precast, prestressed, haunched concrete deck panels. Piles will be installed by impact hammer or by vibratory hammer, dependent on pile type. The dock will total approximately 44,943 square feet and include 320 concrete piles and 16 steel pipe piles. The bottom of the superstructure (deck, pile caps, etc.) will be located above the ordinary high water mark.

For vessel mooring, two 15-foot-by-15-foot breasting dolphins will be constructed near the center of the berth trestle. Steel plates will bridge the distance between the dock and dolphins. Each breasting dolphin will consist of seven 24-inch precast, prestressed concrete battered piles supporting a cast-in-place concrete pile cap with mooring bollards.

Four 15-foot-by-15-foot mooring dolphins will be constructed (two upstream and two downstream of the platforms) for securing bow and/or stern lines. Each mooring dolphin will consist of 12, 24-inch diameter precast 24-inch octagonal diameter concrete piles supporting a cast-in-place concrete pile cap. The dolphins will be equipped with mooring bollards and electric capstans. Access to the mooring dolphins will be provided from the platform by trussed walkways with open grating surfaces. The walkways will be 3 feet wide, have a combined length of 375 feet and will be supported by four 18-inch diameter steel pipe piles.

The fender system will consist of a 9-foot by 9-foot ultra-high molecular weight polyethylene (UHMW-PE) face panels with a super cone fender unit and two 12-inch diameter steel pipe fender piles. Below the fender panels, the fender piles will have 18-inch-diameter high-density polyethylene sleeves. Fender units will be placed on the dock face, two upstream and two downstream, and on the two breasting dolphins.

A small building will be constructed on a corner of the turning platform for dockworker use. A second small building will be constructed at the center of the dock, adjacent to the loading arms. The building will be used as an operations shack for the loading arms.

Since pile layout is conceptual, a 10 percent contingency has been added for the estimated number of concrete piles. This will accommodate potential revisions to the pile layout and configuration as the structural design is finalized. The project may require the installation of temporary piles during construction. Temporary piles are typically steel pipe or h-piles and will be driven with a vibratory hammer. These are placed and removed as necessary during the pile driving and over-water construction process. With the addition of the contingency, the proposed terminal will require the installation of approximately 320, 24-inch concrete piles; 12, 12-inch steel pipe piles; and 4, 18-inch steel pipe piles.

The proposed terminal will result in a total of approximately 44,943 square feet of new solid overwater coverage. A total of 1,079 square feet of new benthic impact will be associated with new pile footprints.

Berth Dredging The existing berth serving the Port’s North Port Terminal will be extended downstream to accommodate vessel activities at the proposed dock. The extended berth area will be deepened to -48 feet Columbia River datum (CRD) with a 2-foot over dredge allowance consistent with the existing adjacent berth. The berth will extend at an angle from the edge of the Columbia River navigation channel to the berthing line at the face of the proposed dock. The footprint of the expanded berth will be approximately 18 acres, of which approximately 16 acres will require dredging to achieve the berth depth. Existing water depths in the proposed berth area vary from -50 feet CRD to -39 feet CRD. The total volume to be dredged the first year is approximately 126,000 cubic yards (cy).

Sediment characterization for dredged material placement suitability was conducted in February 2015. Characterization of sediments in the aquatic area was performed in accordance with guidance from the USACE Portland Sediment Evaluation Team (PSET) and its interim final guidelines, Regional Sediment Evaluation Framework (US Army Corps of Engineers et al. September 2009), for the Lower Columbia River Management Area. Results indicate that the sediment samples did not exceed the sediment quality guidelines and, as such, the material proposed for dredging and placement will be suitable for placement at any of the existing Port placement sites (including in-water and upland placement sites) and on the upland portion of the project site.

Dredged material will be placed upland at the project site to provide material for construction or for other uses, or it may be placed at existing authorized in-water and upland placement sites. The existing authorized (NWP-1994- 462-1) in-water placement locations include: 1) flow lane placement to restore sediment at a deep scour hole associated with pile dike 77.48 M located on the Oregon side of the river; 2) flow lane placement to restore sediment at a deep scour hole associated with pile dike 75.63 M located on the Washington side of the river; 3) beach nourishment at the Port’s shoreline park (Louis Rasmussen Park) at RM 76; and 4) the Ross Island Sand and Gravel disposal site in Portland, Oregon. The existing authorized upland disposal sites include the South Port site located north of the CHS/TEMCO grain terminal at approximately RM 77 and the project site. Additional in-water and upland sites may be identified and permitted for dredge material placement in the future if necessary.

Maintenance dredging will likely be required to maintain the berth to the permitted depth, but is not proposed with this application. This activity will occur in the same manner as used for the establishment of the berth. The volumes and frequency of maintenance dredging events will vary based on the needs of the facility and the rate of shoaling. It is estimated that an average of 27,000 cubic yards of sediment could be deposited yearly.

Collector Well The applicant proposes to install a collector well to gather water for domestic uses. The collector well will be constructed by the Port near the Columbia River shoreline. The collector well will measure 22-feet wide (inside diameter) by 100-feet in depth and will connect to a 2,200 square foot pump station facility. 200-foot infiltration laterals will be installed through the caisson, at approximately 98 feet below the exiting ground surface, and into the water-bearing formations using a hydraulic jacking tool. Lateral lines will be installed below the Columbia River Ordinary High Water Line.

Temporary Crane Pad, Barge Access, and Temporary Site Access for Construction It is expected that some of the components of the facility will be assembled offsite and transported to the project site via barge. These modules may be offloaded from the existing Steelscape dock, directly from barges using a temporary crane, or would be offloaded across temporary false work for the new dock trestle. A temporary concrete crane pad will be constructed on an upland portion of the site for offloading materials/equipment from barges. The temporary crane pad will be located in an area outside of riparian buffers and above the highest high tide line of the Columbia River.

Modules will be delivered to the site in self-anchoring barges, which will anchor offshore using spuds or similar temporary anchors. Barges will anchor offshore, and will not ground out on the beach. Barges will typically only be anchored in place for approximately 1-2 days, as material is being unloaded. Once offloaded, the equipment/modules will be moved into place and erected on the site. The temporary concrete pad will be demolished and the temporary crane removed prior to project completion.

Construction Timing Proposed in-water work will be constructed only during the in-water work window that is ultimately approved for this project. The proposed project would be developed in one or two phases. The construction duration would be approximately 26 to 48 months depending on whether it is built in one or two phases. Construction is expected to begin in mid-2016 and be completed as early as mid-2018 and as late as mid-2020. It is anticipated that pile driving will be completed over approximately 120 days (not necessarily consecutive) during the 2016-2017 and /or 2017-2018 in-water work windows. Ordinarily, work will be conducted during standard day light working hours, roughly 8 to 10 hours per day. Construction will take place from the uplands and/or from barges spudded in place.

NWP-2015-111: The proposed project involves the construction of a pipeline to transport methanol from an existing mainline line to the proposed Kalama Manufacturing and Export Facility described above.

The Federal Energy Regulatory Commission is the lead agency for this project. The public notice for this action was filed under Docket No: CP15-8-000.

The applicant proposes to construct and operate approximately 3.1 miles of 24-inch diameter natural gas pipeline and related facilities extending from Northwest’s mainline to the proposed methanol production facility. The pipeline will begin at the existing 30-inch mainline (Mile point 0.0) and run west to the terminus at the new delivery meter station (MP 3.07) to be constructed within the boundary of the methanol plant.

The proposed project will cross five wetland systems for a total of approximately 2,372 feet. Horizontal Directional Drill (HDD) methods will be used to cross 1,252 feet of the five wetlands.

Of the seven water bodies crossed, five are intermittent and expected to be dry at the time of construction. If water is present at the time of construction, the five intermittent water bodies will be crossed using a dry open-cut ditch method – either fluming or dam and pump, during the Washington Department of Fish and Wildlife (WDFW) recommended in-water work window. If water is not present in the streams, the applicant will complete the crossing using standard upland construction methods. All water bodies will be backfilled with native material removed from the trenches and stream bottoms will be returned to preconstruction contours. Banks will be stabilized and temporary sediment barriers will be installed before returning the flow across the construction work area by removing the flumes or other temporary structures used to isolate the stream flow from the work area during installation of the pipeline. The estimated fill volume for all water bodies crossed by the pipeline via dry-open cut trench is 224 cubic yards. This is based on a trench depth of 8 feet and width of 3.3 feet with 2:1 side slopes and a total open-cut crossing length of 40 feet through the water bodies.

The two perennial water bodies will be crossed using HDD methods and are expected to occur during the recommended in-water work window for the Columbia River tributaries. The HD entry and exit points have been located as far away from the streams as possible and the drill path will be separated from the bottom of the channel by sufficiently dense sediments to limit the potential for inadvertent surface returns in to either waterway.

The primary impact to wetlands from the pipeline construction is temporary. Construction will impact about 4.03 acres of wetlands consisting of herbaceous, forested, or scrub-shrub habitats. There will be permanent impacts to approximately 0.006 acre of scrub-shrub wetlands; all other impacts will be temporary. Appropriate re-vegetation measures will be applied to each habitat type for restoration of temporary impacts.

The applicant will install temporary construction bridges to cross water bodies, where necessary. Clearing equipment may be allowed one pass to cross over water bodies before installation of equipment bridges. All other construction equipment will only cross water bodies using equipment bridges.

The applicant proposes to start construction of the pipeline and related facilities in early summer 2017. The recommended in-water work window for Kalama River tributaries is August 1-August 15 and the recommended in-water work window for Columbia River tributaries within the Project area is August 1-March 31.

PURPOSE: NWP-2014-177/2: To construct a marine terminal and supporting infrastructure to export methanol to global markets by oceangoing vessel.

NWP-2015-111: To construct and operate a 3.1, 24-inch diameter natural gas pipeline to provide 320,000Dth/d of natural gas transportation to service NW Innovation Works proposed methanol plant.

ADDITIONAL INFORMATION: Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately communicates the scope of project impacts. To access the electronic version of this public notice, go to the Seattle District’s web page at http://www.nws.usace.army.mil/ and scroll down the alphabetical listing of District elements, and click on “Regulatory” and then “Regulatory – Permits” for the Seattle District’s Regulatory homepage. Select the prominently displayed “Public Notices” heading and a list of recently issued public notices will appear, in chronological order of the date of issuance. Select and view the listing for this project.

MITIGATION: NWP-2014-177/2: The applicant has proposed three categories of mitigation for the proposed project: 1) pile removal; 2) engineered logjam (ELJ) installation; and 3) riparian habitat restoration and wetland buffer enhancement. The project does not propose impacts to wetlands.

Pile Removal: The Applicant proposes to remove two rows of existing timber piles now located in the freshwater intertidal backwater channel adjacent to the site on Port property. The Corps own one of these timber pile structures. The piles are either untreated or treated with creosote. Piles are estimated to range between 12 and 14 inches in diameter at the mud line. Approximately 320 piles will be removed from the two structures. The removal of these piles will restore a minimum of 251 square feet of benthic habitat, within an area approximately 0.73 acres in size. These structures, in their current configuration, affect the movement of water and sediment into and out of approximately 13 acres of this backwater area. The removal of the piles will facilitate sediment transport and seasonal flushing of this backwater area, which will help improve water quality and maintain this area as an off-channel refuge for juvenile salmonids in the long term.

Engineered Log Jam (ELJ) Installation: The applicant will install eight ELJs along the nearshore habitat along the Columbia River shoreline adjacent to the site. Each ELJ will measure approximately 20 by 20 feet and be composed of large-diameter untreated logs, logs with root wads attached, small wood debris, and boulders. Each ELJ will be a minimum of approximately 400 square feet in size, and the eight structures will represent a total of 3,200 square feet of new large woody material, installed along approximately 800 linear feet of Columbia River shoreline. The logjams will provide refuge and foraging opportunities for out-migrating juvenile salmonids.

Riparian Restoration and Wetland Buffer Enhancement: The Applicant propose to conduct riparian enhancement and invasive species management within an area approximately 1.41 acres in size along approximately 700 linear feet of the Columbia River shoreline at the site. The applicant also proposes to enhance approximately 0.58 acres of wetland buffer at the north end of the site to offset unavoidable wetland buffer impacts. The riparian and wetland buffer habitats will be enhanced by removing invasive species and installing native trees and shrubs that are common to this reach of the Columbia River shoreline and adjacent wetlands. Native plantings proposed for the riparian restoration include black cottonwood and a mix of native willow species including Columbia River willow (Salix fluviatilis), Pacific willow (Salix lasiandra), and Sitka willow (Salix sitchensis). Portions of the wetland buffer will be planted with black cottonwood. Invasive species management at the site will target locally common and aggressive invasive weed species, primarily Scotch broom and Himalayan blackberry (Rubus armeniacus). The restoration sites will be monitored and maintained for 5 years to document proper site establishment.

NWP-2015-111: The applicant proposes to provide compensatory mitigation by purchasing credits from the Columbia River Wetland Mitigation Bank to compensate wetland impacts. The applicant will purchase 0.01 credits to compensate for the permanent impacts to scrub-shrub wetlands and 0.052 credits to compensate for temporary impacts to wetland and riparian buffers.

ADDITIONAL INFORMATION: Additional information may be obtained from Ms. Melody White, Project Manager, U.S. Army Corps of Engineers at 503-808-4386 or e-mail Melody.J.White@usace.army.mil

AUTHORITY: This permit will be issued or denied under the following:

• Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

• Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

ENDANGERED SPECIES:The Endangered Species Act (ESA) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or any designated critical habitat. After receipt of comments from this public notice, the U.S. Army Corps of Engineers will evaluate the potential impacts to proposed and/or listed species and their designated critical habitat.

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). If the U.S. Army Corps of Engineers (Corps) determines that the proposed action may adversely affect EFH for federally managed fisheries in Washington waters, the Corps will initiate EFH consultation with the NMFS. The Corps' final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS.

CULTURAL RESOURCES:The District Engineer has reviewed the latest published version of the National Register of Historic Places, lists of properties determined eligible and other sources of information.

NWP-2014-177/2: A historic properties investigation has been conducted within the permit area. No sites determined eligible for or listed on the National Register of Historic Places were found to exist within the permit area. Coordination with the Department of Archeology and Historic Preservation and Native American Tribes will be conducted as required under Section 106 of the National Historic Preservation Act.

NWP-2015-111: The Federal Regulatory Energy Commission as the lead agency for determining compliance with Section 106 of the National Historic Preservation Act will consult with the State Historic Preservation Office as appropriate. This public notice initiates consultation under Section 106 of the National Historic Preservation Act with any Tribe that has information or concerns with historic properties in the proposed permit area.

The District Engineer invites responses to this public notice from Native American Nations or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns with historic properties in the area. This public notice initiates consultation under Section 106 of the National Historic Preservation Act with any Tribe that has information or concerns with historic properties in the proposed permit area.

SECTION 408: Project NWP-2014-177/2, the Kalama Manufacturing and Export Facility, may affect a US Army Corps of Engineers federally authorized civil works project, and if so would be subject to review and approval pursuant to Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 U.S.C. 408. Section 408 authorizes the Secretary of the Army to grant permission for the alternation or occupation or use of a Corps civil work project if it is determined that the activity will not be injurious to the public interest and will not impair the usefulness of the Corps project. The Section 408 review can be conducted concurrently with the Section 10 evaluation. However, the decision by the District Engineer on the Department of the Army permit applicant pursuant to Sections 10 cannot and will not be rendered prior to the decision on the Section 408 request.

PUBLIC HEARING:Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.

EVALUATION – CORPS - The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Native American Nations or tribal governments; Federal, State, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for the work. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity.

The described discharge will be evaluated for compliance with guidelines promulgated by the Environmental Protection Agency under authority of Section 404(b) (1) of the CWA. These guidelines require an alternative analysis for any proposed discharge of dredged or fill material into waters of the United States.

EVALUATION—ECOLOGY: Ecology is soliciting comments from the public; Federal, Native American Nations or tribal governments, State, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this activity. Ecology will be considering all comments to determine whether to certify or deny certification for the proposed project.

ADDITIONAL EVALUATION: The collector well will be constructed under Groundwater Permit No. G2-30283 issued by the Washington State Department of Ecology.

The Washington State Department of Ecology is reviewing the associated pipeline, production plant, and terminal under the State Environmental Policy Act as an Environmental Impact Statement (EIS). The Port of Kalama and Cowlitz County are SEPA Co-Lead Agencies for this process.

The Federal Energy Regulatory Commission is reviewing the proposed pipeline to ensure the pipeline meets their regulations. The public notice for this action was filed under Docket No: CP15-8-000.

ADDITIONAL EVALUATION: The Environmental Protection Agency is reviewing this work for compliance with the applicable Federal water quality standards pursuant to Section 401 of the Clean Water Act.

COMMENT AND REVIEW PERIOD:Conventional mail or e-mail comments on this public notice will be accepted and made part of the record and will be considered in determining whether it would be in the public interest to authorize this proposal. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the permit applicant’s name and reference number as shown below. Either conventional mail or e-mail comments must include the permit applicant’s name and reference number, as shown below, and the commenter’s name, address, and phone number. All comments whether conventional mail or e-mail must reach this office, no later than the expiration date of this public notice to ensure consideration.

CORPS COMMENTS: All e-mail comments should be sent to Melody.J.White@usace.army.mil. Conventional mail comments should be sent to U.S. Army Corps of Engineers, Regulatory Branch, Attn: Melody White, Post Office Box 2946, Portland, OR 97208-2946.

ECOLOGY COMMENTS: Any person desiring to present views on the project pertaining to a request for water quality certification under Section 401 of the CWA, may do so by submitting written comments to the following address: Department of Ecology, Attn: SEA program – Federal Permit Coordinator, P.O. Box 47600, Olympia, Washington, 98504-7600, or e-mail to ecyrefedpermit@ecy.wa.gov

To ensure proper consideration of all comments, responders must include the following name and reference number in the text of their comments: NWP-2014-177/2 (Kalama Manufacturing and Marine Export Facility) and NWP-2015-111 (Kalama Lateral Project).

Enclosure 1:Fifteen (15) sheets, labeled NWP-2014-177/2

Enclosure 2:Seven (7) sheets, labeled NWP-2015-111

Longview, WA

Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors, and the GIS user community

PROJECT SITE

Kalama, WA 0

2,875

5,750

Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

11,500 Feet

PURPOSE: Construct a facility to manufacture and export methanol

FIGURE 1: VICINITY MAP

IN: Columbia River COUNTY OF: Cowlitz County STATE OF: WA APPLICATION BY: Port of Kalama ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

PROJECT: Kalama Manufacturing and Marine Export Facility Project LATITUDE: 45° 02' 40" LONGITUDE: -122° 52' 00" DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD

Address: 110 W. Marine Dr. Kalama, Wa. 98625

Path: Q:\Vancouver\2015\A15.0032\00\NaturalResources\Graphics\JARPA\Fig1_Vicinity.mxd

NWP-2014-177/2 Joint Public Notice

Page 1 of 15

¨

August 2015

Enclosure 1

0

250

500

1,000 Feet

Legend Tax Lots

WH2500003

Approximate Project Site

WD2516001

Proposed Berth Limits WH2516001

Port Management Agreement (PMA) Area

63305 63301

6330104

63304

63302

60831

PURPOSE: Construct a facility to manufacture and export methanol

60822

FIGURE 2: PARCEL MAP

IN: Columbia River COUNTY OF: Cowlitz County STATE OF: WA APPLICATION BY: PORT OF Kalama ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, WDFW, BNSF

PROJECT: Kalama Manufacturing and Marine Export Facility Project LATITUDE: 45° 02' 40" LONGITUDE: -122° 52' 00" DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD

Address: 110 W. Marine Dr. Kalama, Wa. 98625

Path: Q:\Vancouver\2015\A15.0032\00\NaturalResources\Graphics\JARPA\Fig2_ParcelMap.mxd

NWP-2014-177/2 Joint Public Notice

Page 2 of 15

¨

August 2015

Enclosure 1

NWP-2014-177/2 Joint Public Notice

Page 3 of 15

Enclosure 1

A

A

UPLAND IMPROVEMENTS

USACE DEFINED OHWM (+11.6 CRD)

BIOLOGICAL OHWM

MOORING DOLPHIN

PROPOSED BERTH LIMITS EXISTING BERTH LIMITS Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

FIGURE 4: Marine Terminal Plan

ort Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 4 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

EXPLOSION PROOF, LED LIGHT FIXTURE, FULL CUT-OFF, 100 LUMENS PER WATT, 50 WATT LIGHT FIXTURE, TYP EL +33.5

EL +33.5

26'-0" CLEAR

CL ACCESS TRESTLE 17'-0"

EL +11.6 OHW

9'-0"

4'-0" CLR

EL +19.00

EL +19.00

EL +18.00

15'-0"

EL +11.6 OHW

3'-0"

7'-0"

11'-0"

11'-0"

4'-0" 4'-3"

A

BERTH TRESTLE SCALE: 3/16"=1'-0"

D

AR

M

W

8'-6"

8'-6"

8'-6"

ACCESS TRESTLE @ UTILITY FRAME SCALE: 3/16"=1'-0"

OR

KI NG

EN V

EL O

PE

EL +33.5 EL +45.0

EL +33.5 CL TRANSITION PLATFORM

MARINE LOADING ARM HYDRAULIC & ELECTRICAL UTILITY BOX

19'-0"

4'-0" CLR

EL +19.00

27'-0" 25'-0"

20'-0" CLEAR

5'-0"

TOP OF EQUIPMENT STAND EL +20.9

100 YEAR FLOOD EL +18.90 EL +18.00

EL +19.00 EL +11.6 OHW

2'-0"

EL +11.6 OHW

B

25'-0"

E

BERTH TRESTLE @ MARINE LOADING ARM

TRANSITION PLATFORM @ UTILITY FRAME SCALE: 3/16"=1'-0"

SCALE: 3/16"=1'-0"

112'-0" CIP DECK SLAB

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

EL +18.00

EL +11.6 OHW

3'-0"

6'-0"

11'-0"

11'-0"

5'-6"

C

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

5'-6"

11'-0"

6'-0"

9'-6"

9'-6"

9'-6"

9'-6"

11'-0"

4'-0"

DOCK SECTION-TURNING PLATFORM SCALE: 3/16"=1'-0"

FIGURE 5: DOCK CROSS-SECTIONS

ort Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 5 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

Page 6 of 15

Address: 110 W. Marine Dr. Kalama, WA. 98625 EL -40.0

EL -30.0

EL -20.0

EL -10.0

EL 0.0 MLLW

A

6'-0"

EL +21.00

EXTENDED FROM STEELSCAPE DOCK

FACE OF FENDER

3'-0"

4'-6 3/4"

24" SOLID OCTAGONAL CONCRETE PRESTRESSED PILE, TYP

EL +11.6 OHW

100 YEAR FLOOD EL +18.90 EL +18.00

SCN1200 FENDER

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

PURPOSE: Construct a facility to manufacture and export methanol

FIGURE 6: TRESTLE SECTION

ort

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD

August 2015

Enclosure 1

B

4'-0"

11'-0"

C

11'-0"

CIP PILE CAP

D

5'-6"

PC/PS DECK PANEL, TYP

D.5

5'-6"

E

4'-0"

BATTER PILE BEYOND

11'-0"

PILE CAP BEYOND

CIP DECK SLAB

100'-0"

F

6'-0"

A

G

H

9'-6"

SCALE: 3/16"=1'-0"

DOCK SECTION

9'-6"

4'-0"

EL +13.32

TOPPING

J

9'-6"

CIP STAGE 1 PILE CAP

K

9'-6"

L

TRANSITION PLATFORM

3'-0"

4'-0"

M

363'-4"

CIP STAGE 2 PILE CAP

25'-0"

PC/PS DECK PANEL

APPROX EXISTING MUDLINE

ACCESS TRESTLE

1'-11 3/4"

N

CIP STAGE 1 PILECAP

NOTES: VERTICAL DATUM IS COLUMBIA RIVER DATUM (CRD). BATHYMETRIC SURVEY PER NORTHWEST HYDRO INC, TAKEN ON APRIL 21, 2014.

LEGEND APPROXIMATE AREA OF INITIAL DREDGING + APPROXIMATELY 126,000 CY + APPROXIMATELY 16.2 ACRES

USACE OHWM (+11.6 CRD)

BIOLOGICAL OHWM

PROPOSED BERTH

PROPOSED DOCK

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

SITE IMPROVEMENTS

EXISTING BERTH LIMITS

EXISTING NORTH PORT DOCK

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

FIGURE 7: DREDGING PLAN

ort Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 7 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

:1V 3H Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

FIGURE 8: DREDGING SECTION

ort Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 8 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

EXISTING NORTH PORT DOCK

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

EXISTING NORTH PORT BERTH

EL. -8.4 (20 FEET BELOW OHWM)

Page 9 of 15 Grated

24-inch Concrete

12-inch Steel

# Piles 18-inch Steel

SITE IMPROVEMENTS

Solid

Area of Over-water Coverage

Address: 110 W. Marine Dr. Kalama, WA. 98625 N/A

10,925 sf

Enclosure 1 Total in-/Over-water

10% Contingency for Concrete Piles*

Subtotal

44,943 sf

N/A

34,018 sf

N/A

800 sf

Mooring Dolphins (4) Grated Walkway

450 sf

Breasting Dolphins (2)

N/A

-

68

30 320

N/A

290

1,588 sf

1,588 sf

-

48

14

4

-

100 1,079

N/A 4 12

806

7

159

46

11

225

192

136

30

173

173

N/A

4

-

-

12

-

-

-

-

-

12

-

41 58

-

-

-

-

-

52

9

-

-

52

1,588 sf

N/A

N/A

N/A

N/A

11,648 sf

Turning Platform Fender System

N/A N/A

5,400 sf 13,470 sf

Transition Platform Berth Trestle

N/A

1,450 sf

Access Trestle

Deep Water (Deeper than 20 feet below Corps OHWM)

Subtotal

N/A

10,925 sf

LEGEND

ZONE 2: DEEP WATER (DEEPER THAN 20 FEET BELOW CORPS OHWM)

ZONE 1: SHALLOW WATER (CORPS OHWM ELEVATION [11.6 CRD] TO 20 FEET BELOW CORPS OHWM)

USACE OHWM (+11.6' CRD)

Access Trestle

Area of Pile Footprint (sf)

BIOLOGICAL OHWM

Shallow Water (Corps OHWM elevation [11.6 CRD] to 20 feet below Corps OHWM)

Shoreline Location Description

PROPOSED BERTH

PROPOSED DOCK

FIGURE 9: AQUATIC IMPACTS

ort

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD

August 2015

NWP-2014-177/2 Joint Public Notice

Page 10 of 15

Enclosure 1

LEGEND ENGINEERED LOG JAMS(8 ELJs) PILE REMOVAL (APPROXIMATELY 320 PILES; 251 SF) RIPARIAN RESTORATION (1.41 ACRES) & WETLAND BUFFER ENHANCEMENT (0.58 ACRES)

PILE REMOVAL

ATE 5

INTERST

BNSF RAILROAD

WETLAND BUFFER ENHANCEMENT (APPROXIMATE BOUNDARY .58 AC) BIOLOGICAL OHWM

100 YF

100 YFL

L

L

100 YF

100 YFL

100 YEAR FL

100 YEAR FL

COLUMBIA RIVER

BIOLOGICAL OHWM

100 100 YFL

RIPARIAN RESTORATION (APPROXIMATE BOUNDARY 1.41 AC)

100 Y

EAR

YEAR FL 100 YFL

ENGINEERED LOG JAM (APPROXIMATE LOCATION)

FL 100 YEAR FL

100 YFL

EASTWIND RD.

100 YFL

100 YFL

100 YFL

100 YFL

100 YFL

L

100 YFL

100 YF 100 YFL

100 YFL

100 YFL

L

100 YFL

100 YF

100 YFL

100 YFL

100 YEAR FL

100 YFL

100 YFL

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

100 YFL

TRADEWINDS RD.

100 YEAR FL

100 YFL

100 YEAR FL

APPROXIMATE SITE BOUNDARY

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

STEELSCAPE INC.

FIGURE 11: MITIGATION OVERVIEW

ort Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 11 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

Copyright © BergerABAM. All Rights Reserved.

Piles to be removed (approximately 320 total)

Parcel : WH2516001 (WDFW)

Parcel : WH2500003 (Port of Kalama)

Parcel : WD3012003 (WDFW)

APPROXIMATE NUMBER OF PILES TO BE REMOVED FROM PORT PROPERTY=320

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

Parcel :63305 Port of Kalama

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

Parcel :63301 Port of Kalama

FIGURE 12: PILE REMOVAL

ort Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 12 of 15

LATITUDE: 45° 02' 40" LONGITUDE: -122° 52' 00" DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

FLOW

MLLW RELOAD STRUCTURE WITH SMALL WOOD OR BRUSH

UNTREATED FIR PILING 25' X 16" DIAMETER 20' DEEP LOGS PINNED TO PILING WITH 34" 5 BOLTS OR 16 " WIRE ROPE. LOGS PINED TO EACHOTHER WITH BOLTS

Details:

Drive Pile Minimum 20' deep

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

2 large rootwads w/ 40' stems 1 log 40' x 18" minimum diameter 2 fir pilings 16" diamater x 25' length 20' deep 36' 34" threaded rod 20 34" washers

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

FIGURE 13: ENGINEERED LOG-JAM

ort

DETAILS

Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 13 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

BIOLOGICAL OHW

WETLAND BUFFER ENHANCEMENT

C

USACE OHWM

C

100 YEAR FLOOD WETLAND

WETLAND

ENGINEERED LOG JAM (APPROXIMATE LOCATION)

A

MITIGATION PLANTING SCHEDULE SPECIES

PLANT FORM

MINIMUM HEIGHT @ PLANTING

RECOMMENDED SPACING

REQUIRED NUMBER

PLANT COMMUNITY A BARE ROOT OR 34" DIAMETER LIVE STAKE

36 INCHES

10 FEET ON CENTER

350

COLUMBIA RIVER WILLOW BARE ROOT OR 34" (SALIX FLUVATILLIS) DIAMETER LIVE STAKE

36 INCHES

5 FEET ON CENTER

250

PACIFIC WILLOW (SALIX LASIANDRA)

36 INCHES

5 FEET ON CENTER

250

36 INCHES

5 FEET ON CENTER

250

BLACK COTTONWOOD (POPULUS BALSAMIFERA)

RIPARIAN RESTORATION (APPROXIMATE BOUNDARY)

SITKA WILLOW (SALIX SITCHENSIS)

B

BARE ROOT OR 34" DIAMETER LIVE STAKE OR 34"

BARE ROOT DIAMETER LIVE STAKE

SUBTOTAL:

1,100

PLANT COMMUNITY B COLUMBIA RIVER WILLOW BARE ROOT OR 34" (SALIX FLUVATILLIS) DIAMETER LIVE STAKE

36 INCHES

5 FEET ON CENTER

500

PACIFIC WILLOW (SALIX LASIANDRA)

BARE ROOT OR 34" DIAMETER LIVE STAKE

36 INCHES

5 FEET ON CENTER

500

SITKA WILLOW (SALIX SITCHENSIS)

BARE ROOT OR 34" DIAMETER LIVE STAKE

36 INCHES

5 FEET ON CENTER

500

Last Saved by: Sam.jones on: Apr 13, 2015 10:57 AM File: Q:\vancouver\2015\a15.0032\00\naturalresources\graphics\jarpa\JarpaTB.dwg

SUBTOTAL:

1,500

PLANT COMMUNITY B BLACK COTTONWOOD (POPULUS BALSAMIFERA)

BARE ROOT OR 34" DIAMETER LIVE STAKE

36 INCHES

10 FEET ON CENTER

150

SUBTOTAL: TOTAL:

APPROXIMATE TOE OF DREDGE FILL SLOPE

PURPOSE: Construct a facility to manufacture and export methanol

IN: Columbia River, river mile 72 COUNTY OF: Cowlitz APPLICATION BY: Port of Kalama

ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, BNSF, WDFW

NWP-2014-177/2 Joint Public Notice

150 2,750

FIGURE 14: RIPARIAN PLANTING

ort

DETAILS

Address: 110 W. Marine Dr. Kalama, WA. 98625 Page 14 of 15

DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD August 2015

Enclosure 1

Legend Approximate Project Site

Longview, WA

Maximum Limits of Detectable Aquatic Noise Maximum Limits of Detectable Terrestrial Noise

4 MILE RADIUS

Kalama, WA

0

2,500

5,000

10,000

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Feet PURPOSE: Construct a facility to manufacture and export methanol

FIGURE 15: ACTION AREA

IN: Columbia River COUNTY OF: Cowlitz County STATE OF: WA APPLICATION BY: PORT OF Kalama ADJACENT PROPERTY OWNERS: Port of Kalama, WA DNR, WDFW, BNSF

PROJECT: Kalama Manufacturing and Marine Export Facility Porject LATITUDE: 45° 02' 40" LONGITUDE: -122° 52' 00" DATUM: CRD Columbia River Datum OHWM (USACE)= +11.6' CRD

Address: 110 W. Marine Dr. Kalama, Wa. 98625

Path: Q:\Vancouver\2015\A15.0032\00\NaturalResources\Graphics\JARPA\Fig15_ActionArea.mxd

NWP-2014-177/2 Joint Public Notice

Page 15 of 15

¨

August 2015

Enclosure 1

NWP-2015-111 Joint Public Notice

Page 1 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 2 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 3 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 4 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 5 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 6 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 7 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 8 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 9 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 10 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 11 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 12 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 13 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 14 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 15 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 16 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 17 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 18 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 19 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 20 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 21 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 22 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 23 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 24 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 25 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 26 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 27 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 28 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 29 of 30

Enclosure 2

NWP-2015-111 Joint Public Notice

Page 30 of 30

Enclosure 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas