The applicant proposes to discharge fill material into waters of the U.S. to perform shoreline protection and for creation of a living shoreline bank stabilization at Berkeley Island County Park.

The applicant proposes to discharge fill material into waters of the U.S. toperform shoreline protection and for creation of a living shoreline bank stabilization at BerkeleyIsland County Park (enclosures 3 through 8). The project involves work on the north and southsides of the main access roadway (Brennan Concourse).Proposed work on the south side of the park includes construction of 5 stone/wood breakwaters,occupying 0.409 acres of sub-tidal shallows, off-shore of the park to maintain approximately0.50 acres of sand discharged/placed below the High Tide Line to create a stable living shorelineand wetland system. The breakwaters are separated to allow tidal flow into the created wetlandarea. The area behind the stone/wood breakwater would then be planted with native salt marshvegetation.

Additionally, an existing stone jetty, would be extended and would occupy 0.046acres of sub-tidal habitat, in order to protect 0.270 acres of restored beach habitat. The beach haseroded due to recent storm activity.Proposed regulated work on the north side of the park involves the discharge of rock rip rap,mostly on top of existing stone, to protect the north shoreline from erosion. Maintenance of theexisting revetment would involve the discharge of fill material into 0.26 acres ofinter tidalhabitat. Extension of the revetment as breakwater would result in the discharge of stone into0.096 acres of sub-tidal habitat. The breakwater is proposed to protect the shoreline immediatelyadjacent to the park access road which has suffered significant erosion.The applicant has also proposed to replace, within 24" of the existing structure, 575' linear feetof vinyl bulkhead to protect the northernportionof the park.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas