The application is to accommodate the expansion of the existing East Oak Recycling and Disposal Facility and the existing Mosley Road Landfill in order to ultimately combine the two into one consolidated unit operating under one ODEQ permit.

The applicant proposes to place approximately 73,500 cubic yards of clean native fill material into an unnamed tributary to the North Canadian River below the OHWM, equating to approximately 1,890 linear feet comprising 0.11 acre of stream impacts. The fill material would be acquired from on-site and the stream being filled would ultimately be eliminated over a period of 10 or more years as the combined facilities continue operation. Fill material from on-site borrow areas will be utilized for backfill purposes to the greatest extent possible. Material found on-site is typically an unconsolidated fine to coarse sand. Depending on the required excavation depth when using on-site borrow areas, there is the potential that sandstone, siltstone, and mudstone/shale may be encountered. This material is deeper and less desirable than the preferred sand layer. Based on required engineering design elements of landfill construction, highly impervious off-site material will likely be required for perimeter berm construction. This material will by necessity be categorized geotechnically as relatively homogeneous clay, silty clay, sandy clay, or clayey sand. Material used in berm construction will be highly compacted during construction and will meet ODEQ compaction requirements.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas