Home

Galveston District

Run scraper

Texas Parks and Wildlife Department

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to create an artificial reef in the Gulf of Mexico

Full Public NoticeProject Plans The Texas Parks and Wildlife Department (TPWD) received an offer from Black Elk Energy to create an artificial reef in OCS Block Mustang Island (MU) A-31. The artificial reef (MUA-31 ‘A’) will consist of obsolete oil and gas production structures, obsolete or surplus vessels and other approved artificial reef materials. The approved materials will be placed within the confines of a designated 1320 by 1320-foot area and clustered around a center point. All floatable materials will be removed prior to placement. In addition, all tanks, compartments and enclosures will be permanently opened to provide water circulation and cleaned to U.S. Environmental Protection Agency standards prior to placement. All current and future activity associated with placement of artificial reef material will be done in a manner as not to interfere with current and future lease holders.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas