DRAINAGE IMPROVEMENTS IN ST. MARTIN PARISH
NAME OF APPLICANT: St. Martin Parish, c/o Professional Engineering and Environmental Consultants Inc., 1065 Muller Parkway, Suite B, Westwego, Louisiana 70094.
LOCATION OF WORK: Bayou Long, Bayou Estates, off of Stephensville Road, Morgan City, in St. Martin Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 29°46ʹ19.56ʺ N / Longitude: -91°10ʹ16.52ʺ W, Hydrologic Unit Code: 08090302 – Terrebonne Basin.
CHARACTER OF WORK: Construct an approximately 30-foot wide by 48-foot long pump station, install a 30-foot wide rolling flood gate, a 48-inch diameter HDPE Force Main, and approximately 80-feet of sheet pile wall along the northeastern side of the bank. Approximately 111 cubic yards of dredged fill material would be temporarily placed along the trench during the installation of the HDPE Force Main and placed back into the trench to cover the main. Approximately 120 cubic yards of excess dredged fill material would be placed on top of 0.09 of an acre of non-wet existing rip-rap. The applicant agrees to compensate for 0.01 of an acre of fringed wetland impacts by purchasing credits at a Department of the Army approved mitigation bank.
JOINT PUBLIC NOTICE
October 26, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2284
Sara.B.Fortuna@usace.army.mil
Project Manager
Sara Fortuna
Permit Application Number
MVN-2015-01259-WKK
(225) 219-3225
Elizabeth.Hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC 151019-03
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
DRAINAGE IMPROVEMENTS IN ST. MARTIN PARISH
NAME OF APPLICANT: St. Martin Parish, c/o Professional Engineering and Environmental
Consultants Inc., 1065 Muller Parkway, Suite B, Westwego, Louisiana 70094.
LOCATION OF WORK: Bayou Long, Bayou Estates, off of Stephensville Road, Morgan City, in St.
Martin Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 29°4619.56 N / Longitude: -91°1016.52 W, Hydrologic Unit Code: 08090302
Terrebonne Basin.
CHARACTER OF WORK: Construct an approximately 30-foot wide by 48-foot long pump station,
install a 30-foot wide rolling flood gate, a 48-inch diameter HDPE Force Main, and approximately 80feet of sheet pile wall along the northeastern side of the bank. Approximately 111 cubic yards of
dredged fill material would be temporarily placed along the trench during the installation of the HDPE
Force Main and placed back into the trench to cover the main. Approximately 120 cubic yards of
excess dredged fill material would be placed on top of 0.09 of an acre of non-wet existing rip-rap.
The applicant agrees to compensate for 0.01 of an acre of fringed wetland impacts by purchasing
credits at a Department of the Army approved mitigation bank.
-2The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number
and be mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the proposed work
by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be
specific and substantively supportive of the requested extension, and received by this office prior to
the end of the initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time extension will be
continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
-3The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
The New Orleans District has determined that the 0.10 of an acre project footprint is located in
wetlands and waters known to be utilized by the Louisiana Black Bear (Ursus americanus luteolus)
and West Indian Manatee (Trichechus manatus) and determined the activity is not likely to adversely
affect the West Indian Manatee and no effect on the Louisiana Black Bear based on the Standard
Local Operating Procedure for Endangered Species (SLOPES), dated October 22, 2014, between the
U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services
Office. If this permit is issued, the applicant has agreed to follow the Standard Manatee Conditions
for In-Water Activities.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0.10 of an acre of EFH utilized by various life stages of red drum and
penaeid shrimp. Our initial determination is that the proposed action would not have a substantial
adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination
relative to project impacts and the need for mitigation measures is subject to review by and
coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
ARKANSAS
MISSISSIPPI
TEXAS
GULF
OF ME
XICO
PROJECT LOCATION
(STEPHENSVILLE)
APPLICATION BY:
ST. MARTIN PARISH
DATE:
SHEET
JULY 2015
1 OF 7
BAYOU ESTATES SUBDIVISION STORM
SURGE PROTECTION PROJECT
ST. MARTIN PARISH, LOUISIANA
REV.
NO.
2
COVER SHEET
FILE NAME:
STEPHENSVILLE
BAYOU ESTATES
N 29°46'09"
W 91°10'16"
STEPHENSVILLE (BAYOU ESTATE)
PROJECT SITE
NOTES:
1. AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES
AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL
MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION.
2. ALL STRUCTURES BUILT UNDER THE AUTHORIZATION AND CONDITIONS OF THIS PERMIT SHALL BE REMOVED FROM
THE SITE WITHIN 120 DAYS OF ABANDONMENT OF THE FACILITIES FOR THE HEREIN PERMITTED USE, OR WHEN
THESE STRUCTURES FALL INTO A STATE OF DISREPAIR SUCH THAT THEY CAN NO LONGER FUNCTION AS INTENDED.
THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A
SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED, FOR SUCH REMOVAL ACTIVITIES.
3. STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S. COAST GUARD REGULATIONS.
4. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL
SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING,
DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.
5. NO TREES WILL BE CUT DURING THE CONSTRUCTION OF THIS PROJECT.
6. SHEET PILE WALL AND PUMP STATION INSTALLED USINGA SMALL BARGE FROM THE CANAL.
APPLICATION BY:
ST. MARTIN PARISH
DATE:
SHEET
JULY 2015
2 OF 7
BAYOU ESTATES SUBDIVISION STORM
SURGE PROTECTION PROJECT
ST. MARTIN PARISH, LOUISIANA
REV.
NO.
2
VICINITY MAP
FILE NAME:
STEPHENSVILLE
BAYOU ESTATES
N 29°46'09"
W 91°10'16"
0
1000
2000
4000
Feet
1"=2000'
TURTLE POND LANE
PROPOSED FLOOD WALL
WITH GATES & PUMP
STATION ELEV. +6.0'
PZ-22SHEET
PILE WALL
A
A
FLORENCE COURT
PAULINE COURT
BAYOU ESTATE SUBDIVISION
M
IL
HO
M
M
E
S
T
UR
TA
TE
S
ES
OR
OA
K
HA
RB
BA
YO
U
CARLA
COURT
N
HE
SEE PAGE 5 FOR SECTIONS
"A-A", "B-B", "C-C" DETAILS
0
300
600
1200
Feet
1"=600'
DATE:
SHEET
JULY 2015
3 OF 7
BAYOU ESTATES SUBDIVISION STORM
SURGE PROTECTION PROJECT
ST. MARTIN PARISH, LOUISIANA
REV.
NO.
2
SITE MAP
FILE NAME:
STEPHENSVILLE
BAYOU ESTATES
N 29°46'09"
W 91°10'16"
ME
SU
VI
S
N
P
TE
CO
E
LL
KA
DR TH
IV Y
E
AD
RO
OM
DE
CO BRA
UR
T
E
IV
DR
48" Ø FORCE
MAIN
B
ILH
RE
I
A
CL
SA
APPLICATION BY:
ST. MARTIN PARISH
UM
Y 70
HIGHWA
TERWAY
STAL WA
INTRACO
B
PROPOSED
PUMP STATION
(SEE DETAIL)
C
YO
C
FRANCIS COURT
BA
NG
U LO
BAYO
FILL MATERIAL PLACED
ON TOP OF THE
EXISTING RIP-RAP
KAREN COURT
SANDRA COURT
AD
LE RO
ENSVIL
STEPH
PROPOSED LOCATION OF SHEETPILE
RETAINING WALL TOP ELEV. (+)6.0'
CYPRESS SWAMP
SEE SHEET 6 OF 7 FOR DETAIL
PROPOSED PZ-22 SHEETAPILE 40' LONG
PROPOSED 30' ROLLING FLOOD GATE
A
SHEET PILE
NOTE:
PUMPS TO MAINTAIN WATER
LEVEL IN CANAL TO 2.0 FT.
NAVD-88
PAULINE COURT
ORENCE COURT
CANAL
FRANCIS COURT
PL
CANAL
DATE:
SHEET
JULY 2015
4 OF 7
200
100
BAYOU ESTATES SUBDIVISION STORM
SURGE PROTECTION PROJECT
ST. MARTIN PARISH, LOUISIANA
REV.
NO.
2
PROJECT DETAILS
FILE NAME:
STEPHENSVILLE
BAYOU ESTATES
N 29°46'09"
W 91°10'16"
400
Feet
1:2400
END OF 48"Ø
DISCHARGE PIPE
C
EXISTING BULKHEAD
PROPOSED PUMP STATION
WITH DUAL PUMP AND
DIESEL ENGINE
BAYOU MILHOMME
C
B
CANAL R/W
48" DISCHARGE PIPE (HDPE)
TO BAYOU MILHOMME
EXISTING RIP RAP
STEPHENSVILLE ROAD
B
PUMP STATION WILL BE INSTALLED USING
A SMALL BARGE FROM THE CANAL.
APPLICATION BY:
ST. MARTIN PARISH
0
CANAL
CANAL
925'
CANAL
KAREN COURT
PZ-22 SHEET PILE 40' LONG
CANAL
CANAL
SANDRA COURT
350'
SUSAN COURT
CANAL
NOTE:
SHEET PILE WALL WILL BE
INSTALLED USING A SMALL
BARGE FROM THE CANAL.
EXISTING BULKHEAD
SEE SHEET 7 OF 7 FOR DETAIL
TOTAL EXCAVATED MATERIAL = 231 C.Y.
NOTE:
1. EXCESS FILL MATERIAL WILL BE PLACED ON TOP OF THE EXISTING
RIP RAP AND WILL BE PLACED IN THE TRENCH FOR BACKFILL.
2. EXCAVATOR WILL TRACK ALONG THE TRENCH IN THE SAME WIDTH
WHERE THE TEMPORARY MATERIAL IS PLACED WHILE THE PIPE IS
BEING INSTALLED.
TOTAL AREA EXCAVATED = 0.03 C.Y.
TOTAL FILL MATERIAL FROM EXCAVATED
TRENCH PLACED ON RIP- RAP = 120 C.Y.
TEMPORARY PLACEMENT
OF EXCAVATED MATERIAL
1.00'
8.00'
TOTAL AREA AFFECTED FOR FILL ON TOP
OF RIP-RAP = 0.09 ACRES
16.00'
NEW CLAY FILL
MATERIAL ON TOP OF
EXISTING RIP RAP
EL. +6'
NAVD
4.00'
5.00'
4.00'
48" Ø HDPE
FORCE MAIN
5.00'
EXISTING RIP- RAP
EXISTING GROUND
ELEV. +2.0 NAVD
(ADDITIONAL RIP- RAP WILL BE PLACED
ON EXISTING RIP RAP = 55 C.Y.)
EXCAVATION FOR TRENCH
SECTION "B-B"
TEMPORARY STOCK PILE EXCAVATED MATERIAL TO BE
USED FOR BACKFILL OF TRENCH. EXCESS FILL WILL BE
HAULED AWAY TO BE NON-WET UPLAND AREA
THE EXCAVATOR WILL TRACK ALONG TH STEPHENSVILLE
ROAD FOR CONSTRUCTION
DITCH
5.00'
STEPHENSVILLE ROAD
7.00'
4.41'
EL. + 4.0
12.00'
TRENCH
12.00'
EL. +4.0
ROAD
48" Ø FORCE MAIN
APPLICATION BY:
ST. MARTIN PARISH
DATE:
SHEET
JULY 2015
5 OF 7
BAYOU ESTATES SUBDIVISION STORM
SURGE PROTECTION PROJECT
ST. MARTIN PARISH, LOUISIANA
REV.
NO.
2
GENERAL DETAILS
5.00'
FILE NAME:
STEPHENSVILLE
BAYOU ESTATES
N 29°46'09"
W 91°10'16"
7.00'
SECTION "C-C"
DITCH
EL. +6.0 NAVD 88
ALL ELEVATIONS ARE IN NAVD 88
NEW PZ-22 SHEET
PILE WALL 40' LONG
EXISTING BULKHEAD
NOTE:
GATE WILL CLOSE WHEN WATER
LEVEL REACHES +1.5 NAVD
APPLICATION BY:
ST. MARTIN PARISH
DATE:
SHEET
JULY 2015
6 OF 7
+ 1.5 M.H.W.
0 AVERAGE
- 1.2 M.L.W.
BAYOU ESTATES SUBDIVISION STORM
SURGE PROTECTION PROJECT
ST. MARTIN PARISH, LOUISIANA
REV.
NO.
2
FLOOD GATE DETAIL
FILE NAME:
STEPHENSVILLE
BAYOU ESTATES
N 29°46'09"
W 91°10'16"