You can copy from here when filling out the rest of the page.
NAME: LA DEPT OF TRANSPORTATION AND DEVELOPMENT c/o LEAR, ROBERT J., JR. P.E.10305 AIRLINE HWY.BATON
NAME: LA DEPT OF TRANSPORTATION AND DEVELOPMENT
c/o LEAR, ROBERT J., JR. P.E.
10305 AIRLINE HWY.
BATON ROUGE, LA 70816
Attn: Robert J. Lear, Jr. P.E
LOCATION: Lafourche Parish, LA;POB @ Old LA 1/ LA 3090 Intersection in Fourchon, LA; POE @ LA 3235 in Golden Meadow, LA; Project Centered @ Lat 29-14-50 N / Long 90-12-25 W; Sections 6, 7, 8, 17, 20, 29, 32, 33, T20SR22E;Sections 4, 9, 15, 16, 22, 23, 26, 35, 36, T21S-R22E; Sections 1, 2, 13, 24, 25, 35, 36, T22S-R22E. See plats for additional coordinates.
DESCRIPTION: Proposed construction of a new elevated portion of LA-1 highway, approx. 17 miles in total length, in addition to the construction of up to 14 mitigation sites. Approx. 356,545 cy of native material will be excavated and placed onsite and approx. 9,700 cy of concrete, 7,200 cy of asphaltic concrete and 78,800 cy of dirt/ topsoil will be hauled in and used for construction activities. Approx. 185 acres of non-vegetated water bottom and vegetated wetland habitat may be impacted as a result of the proposed activity.
JOINT PUBLIC NOTICE
October 24, 2015
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT
CORPS OF ENGINEERS
REGULATORY FUNCTIONS BRANCH
P.O. BOX 60267
NEW ORLEANS, LA 70160
STATE OF LOUISIANA
DEPARTMENT OF ENVIRONMENTAL
QUALITY
OFFICE OF ENVIRONMENTAL
SERVICES
P.O. BOX 4313
BATON ROUGE, LA 70821-4313
STATE OF LOUISIANA
DEPARTMENT OF NATURAL
RESOURCES
OFFICE OF COASTAL MANAGEMENT
P.O. BOX 44487
BATON ROUGE, LA 70804-4487
Phone (504) 862- 2099
Phone (225) 219-3225
Phone (225) 342-6859
Fax
Fax
Fax
Email
(504) 862- 2289
(225) 325-8250
(225) 342-9439
crystal.dunn@la.gov
COE REVIEWER:
DEQ REVIEWER:
OCM REVIEWER:
Stephen Pfeffer
E. Hill
Crystal Dunn
COE NUMBER:
WQC NUMBER:
CUP NUMBER:
MVN 2004-01455-MS
151020-01
P20150558
NAME:
LA DEPT OF TRANSPORTATION AND DEVELOPMENT
c/o LEAR, ROBERT J., JR. P.E.
10305 AIRLINE HWY.
BATON ROUGE, LA 70816
Attn: Robert J. Lear, Jr. P.E.
LOCATION:
Lafourche Parish, LA; POB @ Old LA 1/ LA 3090 Intersection in Fourchon, LA; POE @ LA 3235 in Golden
Meadow, LA; Project Centered @ Lat 29-14-50 N / Long 90-12-25 W; Sections 6, 7, 8, 17, 20, 29, 32, 33, T20SR22E; Sections 4, 9, 15, 16, 22, 23, 26, 35, 36, T21S-R22E; Sections 1, 2, 13, 24, 25, 35, 36, T22S-R22E. See
plats for additional coordinates.
DESCRIPTION: Proposed construction of a new elevated portion of LA-1 highway, approx. 17 miles in total length, in addition to the
construction of up to 14 mitigation sites. Approx. 356,545 cy of native material will be excavated and placed onsite
and approx. 9,700 cy of concrete, 7,200 cy of asphaltic concrete and 78,800 cy of dirt/ topsoil will be hauled in and
used for construction activities. Approx. 185 acres of non-vegetated water bottom and vegetated wetland habitat
may be impacted as a result of the proposed activity.
NOTICE the Louisiana Department of Natural Resources, Office of Coastal Management (OCM) has
received the above application for a Coastal Use Permit (CUP) in accordance with the State and Local
Coastal Resources Management Act of 1978, as amended, (Louisiana R.S. 49:214.21-214.41), and the rules
and regulations of the Coastal Resources Program. Applications for the proposed work may be inspected at
617 North 3rd Street, Room 1078, Baton Rouge, LA or on the OCM web page at:
http://dnr.louisiana.gov/index.cfm?md=pagebuilder&tmp=home&pid=591. Copies may be obtained upon
payment of cost of copying. Written comments, including suggestions for modifications or objections to the
proposed work and stating the reasons thereof, are being solicited from the public. Comments must be
received within 25 days of the date of publication of this notice. Comments should be uploaded to our
electronic record, but may be mailed, faxed or emailed to the designated OCM Reviewer. All comments
must contain the appropriate application number and the commenter's full name and contact information.
Application also has been made to the Louisiana Department of Environmental Quality, Office of
Environmental Services for a Water Quality Certification in accordance with La. R.S. 30.2074(A)(93), and
Section 401 of the Clean Water Act (P.L. 95-217). Additional information is on file with the above office, and
may be inspected at any time between 8:00 a.m. and 4:30 p.m. weekdays. Copies may be obtained upon
payment of cost of copying. Comments concerning the application can be filed with the Office of
Environmental Services within 20 days of this notice to the following address: Office of Environmental
Services, P. O. Box 4313, Baton Rouge, LA 70821-4313.
The public comment period for Coastal Use Permit and Water Quality Certification applications begins on the
date of publication of notice in the official journal (The Advocate), in accordance with LAC 43:I. 723(C)(5)(c).
OCM will provide this date on request.
Additionally, interested parties are hereby notified that application has been received by the District Engineer
for a Department of the Army permit to authorize the following pursuant to Section 404 of the Clean Water
Act (86 Stat. 816: 33 USC 1344) and/or Section 10 of the River and Harbor Act of 1899 (33 USC 403). The
notice and notice policies of the Corps of Engineers - New Orleans District can be found on their webpage at:
http://www.mvn.usace.army.mil/ops/regulatory/publicnotices.asp.
Any person may request, in writing, within the comment period specified in this notice, that a State or Federal
public hearing be held to consider this application. Requests for public hearings shall state, with particularity,
the reasons for holding a public hearing and must contain the name and contact information of the requester.
Attached Plats: 1)
2)
3)
P20150558
P20150558
P20150558
Notice Plats
Notice Plats
Notice Plats
09/03/2015
09/03/2015
09/03/2015
-3Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S.
Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would not affect any species listed as endangered
by the U.S. Department of Commerce, nor affect any habitat designated as critical to the survival and
recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of 185 acres of EFH utilized by various life stages of red drum
and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final
determination relative to project impacts and the need for mitigation measures is subject to review by
and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
Enclosure
Martin S. Mayer
Chief, Regulatory Branch
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
-4-
953+77.90
946+88.59
944+13.52
150
150
150
200
153
TIE EXISTING
RIGHT OFFSET
920+00.00
530+00.00
519+49.13
75
75
150
150
75
75
200
467+12.00
75
75
150
413+00.00
150
150
75
360+00.00
102+32.00
100+11.00
75
75
330
305
75
75
150
BEGIN PROJECT @ OLD LA1 / LA 3090 INTERSECTION
370+00.00
150
- SOUTH CONNECTOR INTERCHANGE LOCATION -
420+64.00
75
- BAYOU LAFOURCHE CROSSING LOCATION -
477+12.00
150
- NORTH CONNECTOR INTERCHANGE LOCATION -
920+00.00
150
- GOLDEN MEADOW LEVEE CROSSING LOCATION -
958+88.00
END PROJECT @ LA 3235
MAINLINE STATION
TIE EXISTING
LEFT OFFSET
LA1 MAINLINE RIGHT OF WAY LIMITS
18,200
4,700
14,700
2,420
11,200
54,420
354,125
North Connector Haul Road
(See Figure 16)
North Connector Staging Yard
(See Figure 16)
Golden Meadow Levee T-Wall
(See Figure 21)
LA 3235 Tie-In Roadway
Sta. 953+63 to Sta. 961+18
(See PP Sheet 19)
TOTAL FILL
Fill From Construction Canal
Dredging Placed on Mitigation
Sites / Spoil Disposal Areas
(See Figure 9)
-
South Connector Staging Yard
(See Figure 13)
Leeville Staging Yard
(See Figure 15)
-
3,200
LA 3090 Widening Sta. 84+75 to
Sta. 99+59 Roadway
(See PP Sheet 1)
Fourchon Staging Yard
(See Fig.12)
Permanent
Fill Quantity
3
(yd )
Project Segment
-
43,700
-
-
-
-
-
26,500
17,200
-
Temporary
Fill Quantity
3
(yd )
Excavation Placed Onsite 356,545 C.Y.
2.2
Excavation Placed Onsite
Crushed Stone 9,700 C.Y.
Asphalt 7,200 C.Y.
Hauled In Dirt 78,800 C.Y.
6.3
3.2
13.0
67.9
Crushed Stone 5,600 C.Y.
Asphalt 5,600 C.Y.
Excavation Placed Onsite
Hauled In Dirt 12,600 C.Y.
Crushed Stone 2,100 C.Y.
Hauled In Dirt 4,300 C.Y.
Crushed Stone 400 C.Y.
Hauled In Dirt 18,200 C.Y.
Hauled In Dirt 26,500 C.Y.
Hauled In Dirt 17,200 C.Y.
Crushed Stone 1,600 C.Y.
Asphalt 1,600 C.Y.
Fill Type
2.2
2.2
2.6
0.5
4.5
3.3
2.1
1.0
Footprint
Area
(Acres)
2,420
Placed Onsite
Golden Meadow Levee T-Wall
(See Figure 21)
TOTAL EXCAVATION
356,545
48.1*
354,125
Placed Onsite
in Mitigation
Sites
Sta. 503+00 to Sta. 552+50
Construction Canals North of
Leeville and Realigned Bollinger
Canal (See Figure 9)
50.3*
2.2*
Footprint
Area
(Acres)
Excavation
Quantity
3
(yd )
Project Segment
13.5
2.2
11.4
Wetlands
(Acres)
36.7
0.0
36.7
Non-Vegetative
Waterbottom
(Acres)