Home

New Orleans District

Run scraper

NAME: LA DEPT OF TRANSPORTATION AND DEVELOPMENT

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

NAME: LA DEPT OF TRANSPORTATION AND DEVELOPMENT c/o LEAR, ROBERT J., JR. P.E.10305 AIRLINE HWY.BATON

NAME: LA DEPT OF TRANSPORTATION AND DEVELOPMENT

c/o LEAR, ROBERT J., JR. P.E. 10305 AIRLINE HWY. BATON ROUGE, LA 70816 Attn: Robert J. Lear, Jr. P.E LOCATION: Lafourche Parish, LA;POB @ Old LA 1/ LA 3090 Intersection in Fourchon, LA; POE @ LA 3235 in Golden Meadow, LA; Project Centered @ Lat 29-14-50 N / Long 90-12-25 W; Sections 6, 7, 8, 17, 20, 29, 32, 33, T20SR22E;Sections 4, 9, 15, 16, 22, 23, 26, 35, 36, T21S-R22E; Sections 1, 2, 13, 24, 25, 35, 36, T22S-R22E. See plats for additional coordinates.

DESCRIPTION: Proposed construction of a new elevated portion of LA-1 highway, approx. 17 miles in total length, in addition to the construction of up to 14 mitigation sites. Approx. 356,545 cy of native material will be excavated and placed onsite and approx. 9,700 cy of concrete, 7,200 cy of asphaltic concrete and 78,800 cy of dirt/ topsoil will be hauled in and used for construction activities. Approx. 185 acres of non-vegetated water bottom and vegetated wetland habitat may be impacted as a result of the proposed activity.

JOINT PUBLIC NOTICE October 24, 2015 DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT CORPS OF ENGINEERS REGULATORY FUNCTIONS BRANCH P.O. BOX 60267 NEW ORLEANS, LA 70160

STATE OF LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF ENVIRONMENTAL SERVICES P.O. BOX 4313 BATON ROUGE, LA 70821-4313

STATE OF LOUISIANA DEPARTMENT OF NATURAL RESOURCES OFFICE OF COASTAL MANAGEMENT P.O. BOX 44487 BATON ROUGE, LA 70804-4487

Phone (504) 862- 2099

Phone (225) 219-3225

Phone (225) 342-6859

Fax

Fax

Fax Email

(504) 862- 2289

(225) 325-8250

(225) 342-9439 crystal.dunn@la.gov

COE REVIEWER:

DEQ REVIEWER:

OCM REVIEWER:

Stephen Pfeffer

E. Hill

Crystal Dunn

COE NUMBER:

WQC NUMBER:

CUP NUMBER:

MVN 2004-01455-MS

151020-01

P20150558

NAME:

LA DEPT OF TRANSPORTATION AND DEVELOPMENT c/o LEAR, ROBERT J., JR. P.E. 10305 AIRLINE HWY. BATON ROUGE, LA 70816 Attn: Robert J. Lear, Jr. P.E.

LOCATION:

Lafourche Parish, LA; POB @ Old LA 1/ LA 3090 Intersection in Fourchon, LA; POE @ LA 3235 in Golden Meadow, LA; Project Centered @ Lat 29-14-50 N / Long 90-12-25 W; Sections 6, 7, 8, 17, 20, 29, 32, 33, T20SR22E; Sections 4, 9, 15, 16, 22, 23, 26, 35, 36, T21S-R22E; Sections 1, 2, 13, 24, 25, 35, 36, T22S-R22E. See plats for additional coordinates.

DESCRIPTION: Proposed construction of a new elevated portion of LA-1 highway, approx. 17 miles in total length, in addition to the construction of up to 14 mitigation sites. Approx. 356,545 cy of native material will be excavated and placed onsite and approx. 9,700 cy of concrete, 7,200 cy of asphaltic concrete and 78,800 cy of dirt/ topsoil will be hauled in and used for construction activities. Approx. 185 acres of non-vegetated water bottom and vegetated wetland habitat may be impacted as a result of the proposed activity.

NOTICE the Louisiana Department of Natural Resources, Office of Coastal Management (OCM) has received the above application for a Coastal Use Permit (CUP) in accordance with the State and Local Coastal Resources Management Act of 1978, as amended, (Louisiana R.S. 49:214.21-214.41), and the rules and regulations of the Coastal Resources Program. Applications for the proposed work may be inspected at 617 North 3rd Street, Room 1078, Baton Rouge, LA or on the OCM web page at: http://dnr.louisiana.gov/index.cfm?md=pagebuilder&tmp=home&pid=591. Copies may be obtained upon payment of cost of copying. Written comments, including suggestions for modifications or objections to the proposed work and stating the reasons thereof, are being solicited from the public. Comments must be received within 25 days of the date of publication of this notice. Comments should be uploaded to our electronic record, but may be mailed, faxed or emailed to the designated OCM Reviewer. All comments must contain the appropriate application number and the commenter's full name and contact information. Application also has been made to the Louisiana Department of Environmental Quality, Office of Environmental Services for a Water Quality Certification in accordance with La. R.S. 30.2074(A)(93), and Section 401 of the Clean Water Act (P.L. 95-217). Additional information is on file with the above office, and may be inspected at any time between 8:00 a.m. and 4:30 p.m. weekdays. Copies may be obtained upon payment of cost of copying. Comments concerning the application can be filed with the Office of Environmental Services within 20 days of this notice to the following address: Office of Environmental Services, P. O. Box 4313, Baton Rouge, LA 70821-4313. The public comment period for Coastal Use Permit and Water Quality Certification applications begins on the date of publication of notice in the official journal (The Advocate), in accordance with LAC 43:I. 723(C)(5)(c). OCM will provide this date on request.

Additionally, interested parties are hereby notified that application has been received by the District Engineer for a Department of the Army permit to authorize the following pursuant to Section 404 of the Clean Water Act (86 Stat. 816: 33 USC 1344) and/or Section 10 of the River and Harbor Act of 1899 (33 USC 403). The notice and notice policies of the Corps of Engineers - New Orleans District can be found on their webpage at: http://www.mvn.usace.army.mil/ops/regulatory/publicnotices.asp. Any person may request, in writing, within the comment period specified in this notice, that a State or Federal public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing and must contain the name and contact information of the requester. Attached Plats: 1) 2) 3)

P20150558 P20150558 P20150558

Notice Plats Notice Plats Notice Plats

09/03/2015 09/03/2015 09/03/2015

-3Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would not affect any species listed as endangered by the U.S. Department of Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 185 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.

Enclosure

Martin S. Mayer Chief, Regulatory Branch

You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

-4-

953+77.90 946+88.59 944+13.52

150

150

150

200

153

TIE EXISTING

RIGHT OFFSET

920+00.00 530+00.00 519+49.13

75

75

150

150

75

75

200

467+12.00

75

75

150

413+00.00

150

150

75

360+00.00 102+32.00 100+11.00

75

75

330

305

75

75

150

BEGIN PROJECT @ OLD LA1 / LA 3090 INTERSECTION

370+00.00

150

- SOUTH CONNECTOR INTERCHANGE LOCATION -

420+64.00

75

- BAYOU LAFOURCHE CROSSING LOCATION -

477+12.00

150

- NORTH CONNECTOR INTERCHANGE LOCATION -

920+00.00

150

- GOLDEN MEADOW LEVEE CROSSING LOCATION -

958+88.00

END PROJECT @ LA 3235

MAINLINE STATION

TIE EXISTING

LEFT OFFSET

LA1 MAINLINE RIGHT OF WAY LIMITS

18,200 4,700 14,700 2,420

11,200

54,420

354,125

North Connector Haul Road (See Figure 16)

North Connector Staging Yard (See Figure 16)

Golden Meadow Levee T-Wall (See Figure 21)

LA 3235 Tie-In Roadway Sta. 953+63 to Sta. 961+18 (See PP Sheet 19)

TOTAL FILL

Fill From Construction Canal Dredging Placed on Mitigation Sites / Spoil Disposal Areas (See Figure 9)

-

South Connector Staging Yard (See Figure 13)

Leeville Staging Yard (See Figure 15)

-

3,200

LA 3090 Widening Sta. 84+75 to Sta. 99+59 Roadway (See PP Sheet 1)

Fourchon Staging Yard (See Fig.12)

Permanent Fill Quantity 3 (yd )

Project Segment

-

43,700

-

-

-

-

-

26,500

17,200

-

Temporary Fill Quantity 3 (yd )

Excavation Placed Onsite 356,545 C.Y.

2.2

Excavation Placed Onsite

Crushed Stone ­ 9,700 C.Y. Asphalt ­ 7,200 C.Y. Hauled In Dirt ­ 78,800 C.Y.

6.3 3.2 13.0

67.9

Crushed Stone ­ 5,600 C.Y. Asphalt ­ 5,600 C.Y.

Excavation Placed Onsite

Hauled In Dirt ­ 12,600 C.Y. Crushed Stone ­ 2,100 C.Y.

Hauled In Dirt ­ 4,300 C.Y. Crushed Stone ­ 400 C.Y.

Hauled In Dirt ­ 18,200 C.Y.

Hauled In Dirt ­ 26,500 C.Y.

Hauled In Dirt ­ 17,200 C.Y.

Crushed Stone ­ 1,600 C.Y. Asphalt ­ 1,600 C.Y.

Fill Type

2.2

2.2

2.6

0.5

4.5

3.3

2.1

1.0

Footprint Area (Acres)

2,420 Placed Onsite

Golden Meadow Levee T-Wall (See Figure 21)

TOTAL EXCAVATION

356,545

48.1*

354,125 Placed Onsite in Mitigation Sites

Sta. 503+00 to Sta. 552+50 Construction Canals North of Leeville and Realigned Bollinger Canal (See Figure 9)

50.3*

2.2*

Footprint Area (Acres)

Excavation Quantity 3 (yd )

Project Segment

13.5

2.2

11.4

Wetlands (Acres)

36.7

0.0

36.7

Non-Vegetative Waterbottom (Acres)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas