SPECIAL PUBLIC NOTICE: The purpose of this notice is to announce the issuance of regional general permit RGP-004-MN for public road authorities in the State of Minnesota.
SPECIAL PUBLIC NOTICE: The purpose of this notice is to announce the issuance of regional general permit RGP-004-MN for public road authorities in the State of Minnesota. RGP-04-MN is intended to streamline the review of permit applications for a limited range of public road projects in Minnesota, establish consistency in permit decisions, and provide more certainty for public road authorities seeking Department of the Army authorization under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899.
DEPARTMENT OF THE ARMY PERMIT
Permittee:
All Public Road Authorities in Minnesota
Permit No.:
RGP-004-MN (File No. MVP-2015-00490)
Issuing Office:
St. Paul District, U.S. Army Corps of Engineers (Corps)
Issuance Date:
October 28, 2015
Expiration Date:
October 27, 2020
Authorities:
Section 404 of the Clean Water Act (CWA) (33 U.S.C. 1344) and Section
10 of the Rivers and Harbors Act (RHA) of 1899 (33 U.S.C. 403)
I.
Project Location: RGP-004-MN is eligible for use in waters of the United States 1 (including
navigable waters of the United States 2) within the State of Minnesota.
II.
Authorized Activities: Public road authorities in the State of Minnesota are hereby
authorized to discharge dredged or fill material into waters of the United States, and perform
work in navigable waters of the United States, for activities associated with the
maintenance, reconstruction, expansion, modification, or improvement of existing public
road systems. This authorization is subject to the enclosed terms, conditions, and
limitations.
A. Impact Thresholds: RGP-004-MN authorizes temporary and permanent impacts to
waters of the United States for a single and complete project subject to the following
thresholds:
1. Permanent impacts to waters of the United States shall not exceed 3.0 acres.
2. Permanent impacts to a natural tributary, relocated natural tributary, or a modified
natural tributary at any single crossing or location shall not exceed 500 linear feet of
the tributary channel.
3. Permanent impacts to wetlands that are confined to the bed and banks of roadside
ditches are not counted toward the permanent impact threshold, provided the ditch
does not drain a wetland.
4. Temporary impacts to waters of the United States are not counted towards the
impact thresholds, but must be limited to the minimum necessary to complete the
proposed project.
B. Examples of Eligible Activities: RGP-004-MN authorizes the discharge of dredged or fill
material into waters of the United States and work in navigable waters of the United
States for the following activities:
1
33 CFR 328.3
"Navigable waters of the United States" means those waters regulated under Section 10 of the Rivers
and Harbors Act.
2
Page 1 of 21
1. Infrastructure, geometric, safety, and capacity improvements such as road widening,
lane addition, shoulder improvements, replacement of an intersection with an
interchange, conversion of a two-lane highway to a four-lane highway, construction
of frontage roads to accommodate consolidation of highway access points, etc.
2. Minor realignments of existing transportation projects where there is a demonstrated
need to improve safety, durability, or capacity, such as vertical and horizontal curve
corrections or improvements to existing roadway intersections and interchanges.
3. The repair, rehabilitation, reconstruction, or replacement of existing culverts and
bridges, including culverts or bridges that act as existing water level control
structures (see Exclusion G in Section III).
4. The maintenance, reconstruction, or construction of non-motorized pedestrian,
bicycle, or multi-use sidewalks and trails whose purpose is to enhance the safety and
mobility of the existing public road system (see Exclusion F in Section III).
5. The placement of new or additional riprap, to the minimum extent necessary, to
protect the roadway or ensure the safety of culvert and bridge structures.
6. The removal of accumulated sediments and debris along roadways and in the vicinity
of culverts and bridges, to the minimum extent necessary, to restore the waterway to
previously authorized dimensions.
7. The construction and routine maintenance of stormwater ponds, filtration basins,
infiltration basins, or other water quality treatment or rate control ponds or basins
associated with impervious surfaces generated by a road project (see Exclusion H in
Section III).
8. The placement of temporary structures or fills, including the installation of stormwater
best management practices (BMPs) and other work necessary to construct the public
road system project (see General Condition 14 in Section VII).
Specific activities not listed above that are associated with the maintenance,
reconstruction, expansion, modification, or improvement of existing public road systems
may be eligible for authorization under RGP-004-MN at the discretion of the Corps.
C. Calculating Impacts to Determine Eligibility and Reporting Requirements for RGP-004MN: The measurement of impact to waters of the United States will be determined by
calculating the area of all waters of the United States (including tributaries) where
dredged or fill material would be discharged, plus the area of waters of the United States
that would be excavated, inundated, drained, or converted to another aquatic resource
type as part of a single and complete project. In addition to area, tributary impacts must
also be calculated in linear feet. This calculation should be based on the reach of
tributary subject to construction activities, regardless of whether the activity is occurring
on one or both shorelines.
III.
Activities Specifically Excluded from RGP-004-MN: The following activities are not
eligible for authorization using RGP-004-MN:
A. Discharges within the exterior boundaries of a federally recognized Indian Reservation.
Page 2 of 21
B. Discharges in calcareous fens or in wetlands within 300 feet of a state designated
calcareous fen, unless a management plan has been approved by the Minnesota
Department of Natural Resources (MnDNR) or the need for a management plan has
been waived by the MnDNR in light of project-specific best management practices that
would be implemented to avoid impacts to a state designated calcareous fen.
Applicants must provide evidence of an approved fen management plan or waiver from
the MnDNR. Information on the location of known calcareous fens can be obtained from
the MnDNR at 651-259-5125 or found on their web page at
http://dnr.state.mn.us/publications/waters/index.html.
C. Discharges for the construction of new roads and associated infrastructure.
D. Discharges for the construction of non-linear features commonly associated with public
road projects, such as vehicle maintenance or storage buildings, parking lots, rest stops,
weigh stations, etc.
E. Discharges associated with road relocation that the Corps determines is more than a
minor realignment, such as realignment of a highway around a city.
F. Discharges for the construction or repair of "stand-alone" trails that have independent
utility and are not directly associated with the maintenance, reconstruction, expansion,
modification, or improvement of an existing public road system, such as snowmobile,
ATV, and other recreational trails, regardless of their proximity to a roadway.
G. Discharges for culvert or bridge crossings that would serve as new water level control
structures, such as structures intended to impound water in addition to providing a road
crossing.
H. Discharges for the construction or routine maintenance of stormwater ponds, filtration
basins, infiltration basins, or other water quality treatment or rate control ponds or basins
that result in permanent impacts to greater than 0.5 acre of waters of the United States,
including fill, excavation, inundation, drainage, or removal of accumulated sediments.
NOTE: Permanent impacts to wetlands located in roadside ditches, as described in
Section II.A.3., are not counted toward this 0.5 acre limitation. Furthermore, this 0.5
acre limitation is not in addition to RGP-004-MN's 3-acre permanent impact threshold.
IV.
Application Procedures:
A. Reporting Activities: The prospective permittee must submit a pre-construction
notification (PCN) to the Corps in accordance with the requirements below if any of the
following are met:
1. The project's permanent impacts to waters of the United States would exceed 0.1
acre.
2. The project's temporary impacts to waters of the United States would exceed 0.5
acre 3.
Note: As with all of the RGP-004-MN General Conditions, the terms of General Condition 14 (Temporary Impacts)
apply regardless of whether or not the project is reporting or non-reporting.
3
Page 3 of 21
3. The project involves discharges for culvert work (repair, rehabilitation, reconstruction,
or replacement) that would result in lowering the culvert's inverts, decreasing the
cross-sectional area of the culvert, or increasing the cross-sectional area of the
culvert beyond the tributary's bankfull width. This reporting requirement does not
apply to culvert projects that are permitted by the MnDNR.
4. The project involves discharges for the repair, rehabilitation, reconstruction, or
replacement of culvert or bridge crossings that act as existing water level control
structures.
5. The project involves work conducted in, over, or under navigable waters of the
United States (see Section VI). 4
6. The project might affect a historic property listed in, determined to be eligible for
listing in, or potentially eligible for listing in the National Register of Historic Places
(see General Condition 17 in Section VII).
7. The project might affect any federally-listed threatened or endangered species or
designated critical habitat (see General Condition 20 in Section VII).
B. Non-Reporting Activities: Projects that meet the terms and conditions of RGP-004-MN
and do not require submittal of a PCN as outlined above under "Reporting Activities" are
considered "non-reporting". Non-reporting activities authorized by RGP-004-MN may
commence when project proponents have carefully confirmed that the activity will be
conducted in compliance with all of the terms and conditions of RGP-004-MN. No PCN
to the Corps is required; however, if requested, the Corps will confirm whether or not the
proposed work is authorized by RGP-004-MN through the PCN process for reporting
activities.
C. Pre-Construction Notification: Where required by the terms of RGP-004-MN outlined
above under "Reporting Activities", the prospective permittee must submit a written PCN
that specifically requests authorization under RGP-004-MN. PCN requirements give the
Corps the opportunity to evaluate general permit activities on a case-by-case basis to
ensure that they will have no more than minimal adverse effects, individually and
cumulatively. This case-by-case review may result in the addition of project-specific
conditions to the authorization to ensure that RGP-004-MN authorizes only activities that
result in minimal individual and cumulative effects on the aquatic environment and other
public interest review factors. Review of the PCN may also result in the Corps asserting
discretionary authority to require a higher level of review through use of our individual
permit procedures (see General Condition 1 in Section VII).
The state/federal Joint Application Form for Activities Affecting Water Resources in
Minnesota is the recommended form of the PCN. However, a letter containing the
required information may also be used. The PCN must be submitted prior to beginning
the proposed activity, and as far in advance of the proposed work as possible. In
general, the level of detail provided in the PCN should be commensurate with the scope
and degree of adverse effects to waters of the United States and the complexity of the
project. A complete PCN must consist of the following information:
4
"Navigable waters of the United States" means those waters regulated under Section 10 of the Rivers
and Harbors Act.
Page 4 of 21
1. Name and address of the prospective permittee (typically the agency or government
unit), and the name, email and telephone number of the point of contact with the
agency. If a third party agent is used, the name, address, email and telephone
number of the agent must be provided, as well as a signed statement by the agency
point of contact authorizing the agent to act on behalf of the prospective permittee.
2. A large-scale and small-scale location map and description of the proposed project's
location (i.e. section-township-range, including all sections the project would cross,
and latitude and longitude in decimal degrees).
3. A complete description of the proposed project (including all project components and
the project schedule), the project's purpose and need (e.g. based on ADTs, crash
history, etc.), all impacts to waters of the United States (see PCN item 4 below), and
any other adverse environmental impacts the project would cause. The description
should also include any other nationwide permits, regional general permits, or
individual permits used or intended to be used to authorize any part of the proposed
project or any related activity. The description should be sufficiently detailed to allow
the Corps to determine that the project would meet the terms and conditions of RGP004-MN.
4. A tabulation of all impacts to waters of the United States, both permanent and
temporary, including the anticipated amount of loss of waters of the United States
expected to result from the proposed activity. Impacts to all waters of the United
States must be reported in area (acres or square feet). In addition to area, tributary
impacts must also be reported in linear feet. See the impact table in the state/federal
Joint Application Form for Activities Affecting Water Resources in Minnesota, or the
most current application form, for more information on how to report impacts; a link to
this document is provided in Section XI.
5. A delineation of aquatic resources on the project site conducted in accordance with
current agency guidance including the 1987 Corps of Engineers Wetland Delineation
Manual, or the most recent version of this manual, and the appropriate Regional
Supplements (see the Local Road Authority Reference Guide to U.S. Army Corps of
Engineers (Corps) Clean Water Act Section 404 and Rivers and Harbors Act Section
10 Permits for additional information on determining the level of delineation required
for your project). Delineation reports must be prepared in accordance with the
current St. Paul District guidance for the completion and submittal of delineation
reports in the St. Paul District (a link is provided in Section XI). Please note that
prospective permittees do not have to re-submit delineation reports that have already
been provided to the Corps.
6. Drawings/plans depicting delineated aquatic resources and aquatic resource impact
areas, including plan-view drawings on a recent aerial photograph, cross-section
drawings, and, where appropriate, profile drawings. Aquatic resources shall be
identified by type (e.g. wetland, tributary, etc.) and impacts shall be identified by type
and permanence (e.g. fill, excavation, etc.; permanent or temporary).
7. If not included in the material submitted for PCN item 6, provide a copy of the
applicable construction plan sheets showing the work proposed in waters of the
United States.
Page 5 of 21
8. A detailed discussion of how aquatic resource impacts were avoided and minimized,
including through on-site project configurations, from the initial phase of project
planning to the project plan that is currently being proposed. For projects that
propose impacting a water(s) of the United States for the construction of stormwater
ponds or other water quality treatment or rate control ponds or basins as described in
Section II, an analysis pertaining to the method and siting of the stormwater ponds
proposed for the project must be provided in the PCN. The analysis must clearly
demonstrate the need for the proposed stormwater pond or basin, the area being
served by the proposed stormwater pond or basin, and why upland locations,
alternative methods, or other less environmentally damaging alternatives are not
practicable.
9. For projects that propose temporary fills and structures in waters of the United
States, a description or plan documenting how all of the proposed temporary fills and
structures would be removed and the affected areas restored to pre-project
conditions. Include the length of time that the temporary fills or structures would
remain in place.
10. For an activity that might affect a historic property listed in, determined to be eligible
for listing in, or potentially eligible for listing in, the National Register of Historic
Places, non-federal applicants must include in the PCN a description of any known
historic properties that might be affected by the proposed work, and include a vicinity
map indicating the location of the historic property. If applicable, non-federal
applicants are encouraged to provide the results of any state or local reviews and
determinations of eligibility that have been conducted regarding historic properties.
Federal applicants or applicants with federal funding (or whose project otherwise
involves a lead federal agency that is not the Corps) must provide documentation
demonstrating compliance with Section 106 of the National Historic Preservation Act.
See General Condition 17 in Section VII for additional information.
11. If any federally-listed species or designated critical habitat might be affected by the
project, non-federal applicants must include in the PCN the name(s) of those
threatened or endangered species or the designated critical habitat that might be
affected by the proposed work. If applicable, non-federal applicants are also
encouraged to provide the results of any state or local reviews that have been
conducted regarding threatened or endangered species. Federal applicants or
applicants that have federal funding (or whose project otherwise involves a lead
federal agency that is not the Corps) must provide documentation demonstrating
compliance with the Endangered Species Act. See General Condition 20 in Section
VII for additional information. Additionally, the following PCN requirements are
specific to the northern long-eared bat (NLEB) and only apply to non-federal
applicants:
a. For projects that would involve removal of trees in or adjacent to proposed
aquatic resource impact areas during the roosting period (April 1 to September
30) of the NLEB, where the trees have a diameter at breast height (dbh) of at
least 3 inches and are located within 1,000 feet of a contiguous forested area 15
acres or greater in extent:
(1) A map or plan sheet showing the locations where trees would be removed.
Page 6 of 21
(2) The acreage of the tree removal area.
(3) The approximate size (dbh) of trees to be removed.
(4) The time period when the trees would be removed.
b. For projects that would involve bridge demolition work in or adjacent to proposed
aquatic resource impact areas that would be initiated during the roosting period
(April 1 to September 30) of the NLEB, where the bridge sites are located within
1,000 feet of a contiguous forested area 15 acres or greater in extent and have
evidence of bat activity:
(1) The timing of the proposed bridge work.
(2) Photographs of the underside of the bridge and whether or not any evidence
of bat activity was found. 5
12. For projects that propose a tributary crossing(s):
a. Type and dimensions of the existing and proposed structures.
b. Depth that the culvert inlet and outlet would be recessed into the tributary bottom,
if applicable.
c. Inlet and outlet elevations of the existing and proposed culverts, if applicable.
d. Plan-view, cross-section, and profile drawings of the proposed structure that
include the tributary dimensions.
13. A statement describing how the aquatic resource functions lost as a result of the
proposed project would be replaced through compensatory mitigation (see General
Condition 3 in Section VII), or otherwise explaining why compensatory mitigation
should not be required.
In addition to PCN items 1 through 13, prospective permittees may be required to
provide the following items in their PCN on a case-by-case basis. Providing these items
with a PCN may shorten the permit review timeframe by avoiding a request for additional
information. If these items are not provided, they may be requested by the Corps on a
case-by-case basis, along with any other additional information determined to be
necessary by the Corps.
14. Where the proposed work involves discharges of dredged or fill material into waters
of the United States resulting in permanent, above-grade fills within 100-year
floodplains (as identified on FEMA Flood Insurance Rate Maps or FEMA-approved
local floodplain maps), provide documentation demonstrating that the proposed work
complies with applicable FEMA-approved state or local floodplain management
requirements.
15. A description of the erosion control BMPs that would be used or, if available, a copy
of the erosion control plans for the proposed project.
16. A copy of any hydraulic analyses that were completed for proposed culvert or bridge
crossings.
5
See Reference G in Section XI, Range-Wide Biological Assessment for Transportation Projects for
Indiana Bat and Northern Long-Eared Bat, Appendix B: Bridge Inspection Guidance.
Page 7 of 21
V.
PCN Evaluation Process:
A. Timing: Upon receipt of a PCN, the Corps will determine if the PCN is complete within
30 calendar days of receipt. If incomplete, the Corps will notify the prospective permittee
requesting the information required to initiate the review process. As a general rule, the
Corps will request additional information necessary to make the PCN complete only
once. However, if the prospective permittee does not provide all of the requested
information within 30 days of the date of the Corps written request, then the Corps will
notify the prospective permittee that the PCN is still incomplete and the PCN review
process will not commence until all of the requested information has been received by
the Corps.
B. PCN Review and Processing: Upon receipt of a complete PCN, the Corps will initiate
the permit review process to determine if the proposed activity complies with the terms
and conditions of RGP-004-MN. The Corps will either notify the prospective permittee
that: (1) the activity is authorized under RGP-004-MN; or, (2) that the proposed activity is
not eligible for authorization under RGP-004-MN and will either be reviewed for eligibility
under another general permit or through our individual permit procedures, which include
letters of permission and standard permits.
C. Decision on the PCN: The prospective permittee shall not begin the activity until he or
she is notified in writing by the Corps that the activity may proceed under RGP-004-MN,
along with any special conditions imposed by the Corps.
VI.
Jurisdictional Determinations: A jurisdictional determination (JD) is a written
determination made by the Corps that a wetland or waterbody is subject to regulatory
jurisdiction under Section 404 of the Clean Water Act (33 U.S.C. 1344) and Section 10 of
the Rivers and Harbors Act (33 U.S.C. 403). The Corps issues two types of JDs: approved
and preliminary. An approved JD is an official Corps determination that jurisdictional waters
of the United States or navigable waters of the United States are either present or absent on
a particular site. An approved JD identifies the limits of those waters on the project site
determined to be jurisdictional under the Clean Water Act or Rivers and Harbors Act and
may be appealed through the Corps administrative appeal process. Preliminary JDs are
non-binding written indications that there may be navigable waters of the United States or
waters of the United States, including wetlands, on a parcel or indications of the location(s)
of navigable waters of the United States and waters of the United States or wetlands on a
parcel. Preliminary JDs are advisory in nature and may not be appealed.
A landowner, permit applicant, or other "affected party" can request and obtain an approved
JD prior to, or concurrent with, submittal of a PCN under this RGP. He or she can also
decline to request an approved JD, and instead obtain a Corps general permit authorization
based on a preliminary JD. As a matter of practice, and for the purpose of expediting the
permit review, the Corps will prepare a preliminary JD for all PCNs reviewed under this RGP
unless the prospective permittee specifically requests an approved JD.
For a complete list of navigable waters of the United States in Minnesota that are regulated
under Section 10 of the Rivers and Harbors Act of 1899, please refer to:
http://www.mvp.usace.army.mil/Missions/Regulatory.aspx.
Page 8 of 21
VII.
Permit Conditions:
A. General Conditions: The activities authorized by RGP-004-MN are subject to the
following General Conditions, unless otherwise noted.
1. Discretionary authority: As allowed under 33 CFR 325.2(e)(2), the Corps retains
discretionary authority to require an individual permit review (i.e. letter of permission
or standard permit) for any activity eligible for authorization under RGP-004-MN
based on concern for the aquatic environment or for any other factor of the public
interest.
2. Sequencing: Discharges of dredged or fill material into waters of the United States
must be avoided and minimized to the maximum extent practicable. See the
Minnesota Local Road Authority Reference Guide to U.S. Army Corps of Engineers
(Corps) Clean Water Act Section 404 and Rivers and Harbors Act Section 10
Permits for additional information on avoidance and minimization, including an
example list (not exhaustive) of design features that could be used to minimize
impacts to waters of the United States.
3. Compensatory Mitigation: When necessary, compensatory mitigation will be
required to reduce the adverse effects of a project (either temporary or permanent) to
the minimal level. The Corps will determine appropriate compensatory mitigation
requirements on a case-by-case basis, and in accordance with federal guidelines
and established Corps policy, in order to ensure that the activity results in minimal
adverse effects on the aquatic environment. In general, compensatory mitigation will
be required for projects that require a PCN. Compensatory mitigation requirements
provided to offset losses of aquatic resources must comply with the applicable
provisions of 33 CFR 332.
Compensatory mitigation shall be designed to replace the aquatic resource functions
lost as result of the project. Where certain functions of waters of the United States
are permanently adversely affected as a result of the authorized discharge, such as
the conversion of a forested or shrub swamp wetland to a herbaceous wetland in a
permanently maintained right-of-way, or are temporarily affected, such as the
temporary conversion of forested or shrub swamp wetlands in a linear project
corridor, compensatory mitigation may be required to reduce the adverse effects of
the project to the minimal level.
Use of Corps-approved mitigation banks and in-lieu fee programs are the preferred
methods for providing compensatory mitigation if the mitigation site meets the
sequencing requirements of the federal mitigation rule (33 CFR 332). In cases
where a Corps-approved bank is proposed to be used, a statement of intent to use
the bank provided in the PCN is generally sufficient. Permittees who wish to pursue
permittee-responsible mitigation must submit a mitigation plan with their PCN,
prepared in accordance with 33 CFR 332 and the St. Paul District Policy for Wetland
Compensatory Mitigation in Minnesota (January 2009), or the most current St. Paul
District mitigation policy. Compensatory mitigation required by other federal or state
programs may, but will not necessarily, satisfy the compensatory mitigation
requirement under the Clean Water Act. The Corps must approve any compensatory
mitigation proposal before the permittee commences work.
Page 9 of 21
4. Decision: In reviewing the PCN for the proposed activity, the Corps will determine
whether the activity authorized by RGP-004-MN will result in more than minimal
individual or cumulative adverse environmental effects or may be contrary to the
public interest. The Corps will consider any proposed compensatory mitigation the
applicant has included in the proposal in determining whether the net adverse
environmental effects to the aquatic environment of the proposed work are minimal.
If the Corps determines that the activity complies with the terms and conditions of
RGP-004-MN and that the adverse effects on the aquatic environment are minimal,
after considering mitigation, the Corps will notify the permittee and include any
conditions the Corps deems necessary. When compensatory mitigation is required,
the verification letter will include a condition requiring that the mitigation be provided
by a specific date. No discharges of dredged or fill material shall occur in waters of
the United States until the Corps has approved the mitigation plan.
If the Corps determines that the adverse effects of the proposed work are more than
minimal or the project does not otherwise meet the terms and conditions of RGP004-MN, then the Corps will notify the applicant either: (1) That the project does not
qualify for authorization under RGP-004-MN and instruct the applicant regarding the
procedures to seek authorization under another general permit or an individual
permit; (2) that the project is authorized under RGP-004-MN subject to the
applicant's submittal of a mitigation plan that would reduce the adverse effects on the
aquatic environment to the minimal level; or (3) that the project is authorized under
RGP-004-MN with specific modifications or conditions.
5. Aquatic Life Movements: No activity may substantially disrupt the necessary life
cycle movements of those species of aquatic life indigenous to the waterbody,
including those species that normally migrate through the area, unless the activity's
primary purpose is to impound water, or impede rough fish movement or aquatic
invasive species movement. All permanent and temporary crossings of waterbodies
shall be suitably culverted, bridged, or otherwise designed and constructed to
maintain low flows to sustain the movement of those aquatic species.
6. Spawning Areas: Activities in spawning areas during spawning seasons must be
avoided to the maximum extent practicable. Activities that result in the physical
destruction (e.g., through excavation, fill, or downstream smothering by substantial
turbidity) of an important spawning area are not authorized.
7. Migratory Bird Breeding Areas: Activities in waters of the United States that serve as
breeding areas for migratory birds must be avoided to the maximum extent
practicable.
8. Suitable Fill Material: No activity may use unsuitable material (e.g., trash, debris, car
bodies, asphalt, etc.). All fill material used for construction or discharged must be
free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act).
9. Adverse Effects from Impoundments: If the activity creates an impoundment of
water, adverse effects to the aquatic system due to accelerating the passage of
water, and/or restricting its flow must be minimized to the maximum extent
practicable.
Page 10 of 21
10. Management of Water Flows: To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be
maintained. The activity must be constructed to withstand expected high flows. The
activity must not restrict or impede the passage of normal or high flows, or cause the
relocation of water, unless the primary purpose of the activity is to impound water or
manage high flows. The activity may alter the pre-construction course, condition,
capacity, and location of open waters if it benefits the aquatic environment.
11. Culvert and Bridge Restrictions for Tributaries: Replacement of culverts or crossings
are to follow (or be restored to) the natural alignment and profile of the tributary. The
culvert(s) or bridges must accommodate the natural bankfull width, and where
practicable, a single culvert or bridge shall span the natural bankfull width adequate
to allow for debris and sediment transport rates to closely resemble those of
upstream and downstream conditions. Where practicable, a single culvert shall be
recessed in order to pass bedload and sediment load, and if used, additional culvert
inverts shall be set at a higher elevation.
12. Proper Maintenance: Any authorized structure or fill shall be properly maintained,
including maintenance to ensure public safety, and maintenance to ensure
compliance with applicable general conditions, as well as any special conditions
added by the Corps to a RGP-004-MN authorization.
13. Soil Erosion and Sediment Controls: Appropriate soil erosion and sediment controls
must be used and maintained in effective operating condition during construction,
and all exposed soil and other fills, as well as any work below the ordinary high water
mark, must be permanently stabilized at the earliest practicable date. Work shall be
done in accordance with state-approved, published practices, such as the Minnesota
Pollution Control Agency's "Stormwater Best Management Practices Protecting
Water Quality in Urban Areas" and the "Minnesota Stormwater Manual".
Upon completion of earthwork operations, all exposed slopes, fills, and disturbed
areas must be given sufficient protection by appropriate means such as landscaping,
or planting and maintaining vegetative cover, to prevent subsequent erosion.
Cofferdams shall be constructed and maintained so as to prevent erosion into the
water. If earthen material is used for cofferdam construction, sheet piling, riprap or a
synthetic cover must be used to prevent dam erosion. Where practicable, permittees
shall perform work within waters of the United States during periods of low-flow or
no-flow.
14. Temporary Impacts: All appropriate measures must be taken to maintain normal
downstream flows and minimize flooding to the maximum extent practicable when
temporary structures, work, and discharges, including cofferdams, are necessary for
construction activities, access fills, or dewatering of construction sites. Temporary
fills must consist of materials and be placed in a manner that will not be eroded by
expected high flows. Temporary fills and structures are allowed to remain in place
for up to three months. Upon request, the Corps may extend this period where
appropriate, and will provide written notification regarding this decision to the
applicant. At the end of the specified timeframe, temporary fills must be removed in
their entirety, and the affected areas restored. All wetlands temporarily impacted as
a result of the authorized impacts shall be restored to preconstruction contours and
elevations, and re-seeded with a native seed mix, where appropriate. Information on
Page 11 of 21
appropriate seed mixes can be found at
http://www.bwsr.state.mn.us/native_vegetation/index.html.
15. Fills Within 100-Year Floodplains: The activity must comply with applicable FEMAapproved state or local floodplain management requirements.
16. Equipment: Heavy equipment working in wetlands or mudflats must be placed on
mats, or other measures must be taken to minimize soil disturbance. Equipment
shall be clean and free of greases, oils, fuels, and sediments, prior to working within
aquatic habitats. To the extent practicable and appropriate, measures shall be taken
to control and minimize the spread of invasive species via equipment transfer.
17. Historic Properties and Cultural Resources:
a. In cases where the Corps determines that the activity may affect properties
listed, or eligible for listing, in the National Register of Historic Places, the activity
is not authorized, until the requirements of Section 106 of the National Historic
Preservation Act (NHPA) have been satisfied.
b. Federal permittees or permittees with federal funding (or whose project otherwise
involves a lead federal agency that is not the Corps) should follow their own
procedures for complying with the requirements of Section 106 of the NHPA. For
those projects requiring submittal of a PCN, federal permittees must provide the
Corps with the appropriate documentation to demonstrate compliance with those
requirements. The Corps will review the documentation and determine whether it
is sufficient to address section 106 compliance for the activity, or whether
additional section 106 consultation is necessary.
c. Non-federal permittees must submit a PCN to the Corps if the authorized activity
may have the potential to cause effects to any historic properties listed in,
determined to be eligible for listing in, or potentially eligible for listing in the
National Register of Historic Places, including previously unidentified properties.
The PCN must state which historic properties may be affected by the proposed
work and include a vicinity map indicating the location of the historic properties or
the potential for the presence of historic properties. Assistance regarding
information on the location of or potential for the presence of historic resources
can be sought from the Minnesota State Historic Preservation Office at 651-2593450 or their web page at http://www.mnhs.org/shpo/ and the Minnesota National
Register of Historic Places web page at http://nrhp.mnhs.org/. When reviewing
PCNs, the Corps will comply with the current procedures for addressing the
requirements of Section 106 of the NHPA and will determine whether the
proposed activity has the potential to cause an effect to historic properties. The
Corps will notify the non-federal applicant whether NHPA Section 106
consultation is required. Section 106 consultation is not required when the Corps
determines that the activity does not have the potential to cause effects on
historic properties (see 36 CFR §800.3(a)). Where the non-federal applicant has
identified historic properties on which the activity may have the potential to cause
effects and so notified the Corps, the non-federal applicant shall not begin the
activity until notified by the Corps either that the activity has no potential to cause
effects or that consultation under Section 106 of the NHPA has been completed.
Page 12 of 21
d. Prospective permittees should be aware that Section 110k of the NHPA (16
U.S.C. 470h-2(k)) prevents the Corps from granting a permit or other assistance
to an applicant who, with intent to avoid the requirements of Section 106 of the
NHPA, has intentionally significantly adversely affected a historic property to
which the permit would relate, or having legal power to prevent it, allowed such
significant adverse effect to occur, unless the Corps, after consultation with the
Advisory Council on Historic Preservation (ACHP), determines that
circumstances justify granting such assistance despite the adverse effect created
or permitted by the applicant. If circumstances justify granting the assistance,
the Corps is required to notify the ACHP and provide documentation specifying
the circumstances, the degree of damage to the integrity of any historic
properties affected, and proposed mitigation. This documentation must include
any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if
the undertaking affects historic properties of interest to those tribes, and other
parties known to have a legitimate interest in the impacts to the permitted activity
on historic properties.
18. Tribal Rights: No activity or its operation may impair reserved tribal rights, including,
but not limited to, reserved water rights and treaty fishing and hunting rights, or affect
Indian lands or protected tribal resources.
19. Discovery of Previously Unknown Remains and Artifacts: If any previously unknown
historic, cultural or archeological remains and artifacts are discovered while
accomplishing the activity authorized by this permit, the permittee must immediately
notify the Corps of what was found, and to the maximum extent practicable, avoid
construction activities that may affect the remains and artifacts until the required
coordination has been completed. The Corps will initiate the federal, tribal and state
coordination required to determine if the items or remains warrant a recovery effort or
if the site is eligible for listing in the National Register of Historic Places.
20. Endangered Species:
a. No activity is authorized by RGP-004-MN which is likely to directly or indirectly
jeopardize the continued existence of a threatened or endangered species or a
species proposed for such designation, as identified under the federal
Endangered Species Act (ESA), or which will directly or indirectly destroy or
adversely modify the critical habitat of such species. No activity is authorized
which "may affect" a listed species or critical habitat, unless Section 7
consultation addressing the effects of the proposed activity has been completed.
b. Federal permittees or permittees with federal funding (or whose project otherwise
involves a lead federal agency that is not the Corps) should follow their own
procedures for complying with the requirements of the ESA. For those projects
requiring submittal of a PCN, federal permittees must provide the Corps with the
appropriate documentation to demonstrate compliance with those requirements.
The Corps will review the documentation and determine whether it is sufficient to
address ESA compliance for the activity, or whether additional ESA consultation
is necessary.
c. Non-federal permittees must submit a PCN to the Corps if any listed species or
designated critical habitat might be affected by the project and shall not begin
Page 13 of 21
work on the activity until notified by the Corps that the requirements of the ESA
have been satisfied and that the activity is authorized. The PCN must include the
name(s) of the threatened or endangered species that might be affected by the
proposed work or the designated critical habitat that might be affected by the
proposed work. Information on the location of threatened and endangered
species and their critical habitat can be obtained directly from the Twin Cities
Ecological Services Field Office of the U.S. Fish and Wildlife Service at 612-7253548 or their web page at
http://www.fws.gov/midwest/endangered/lists/minnesot-spp.html. When
reviewing PCNs, the Corps will comply with the current procedures for
addressing the requirements of the ESA and will determine whether the
proposed activity "may affect" or will have "no effect" to listed species and
designated critical habitat. The Corps will notify the non-federal applicant
whether Section 7 consultation is required. In cases where the non-federal
applicant has identified listed species or critical habitat that might be affected by
the project, and has so notified the Corps, the applicant shall not begin work until
the Corps has provided notification the activity will have "no effect" on listed
species or critical habitat, or until Section 7 consultation has been completed.
Non-federal permittees are also encouraged to use the Information for Planning
and Conservation (IPaC) web page at https://ecos.fws.gov/ipac/. IPaC can be
used as an additional tool to identify federally-listed threatened or endangered
species or designated critical habitat that might be affected by a proposed
project. The information generated in IPaC can also be sent to the U.S. Fish and
Wildlife Service as a first step in the process of requesting their technical
assistance.
d. Authorization of an activity by RGP-004-MN does not authorize the "take" of a
threatened or endangered species as defined under the ESA. "Take" is
prohibited even if it is incidental to an otherwise lawful activity. In the absence of
separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion
issued to a federal agency with "incidental take" provisions, etc.) from the U.S.
Fish and Wildlife Service, the ESA prohibits any person subject to the jurisdiction
of the United States to take a listed species, where "take" means to harass,
harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to
engage in any such conduct. The word "harm" in the definition of "take" means
an act which actually kills or injures wildlife. Such an act may include significant
habitat modification or degradation where it actually kills or injures wildlife by
significantly impairing essential behavioral patterns, including breeding, feeding
or sheltering.
21. Migratory Birds and Bald and Golden Eagles: The permittee is responsible for
obtaining any "take" permits required under the U.S. Fish and Wildlife Service's
regulations governing compliance with the Migratory Bird Treaty Act or the Bald and
Golden Eagle Protection Act. The permittee should contact the Twin Cities
Ecological Services Field Office (612-725-3548) of the U.S. Fish and Wildlife Service
if the proposed project would disturb a bald eagle or a bald eagle nest, or to
determine if a "take" permit is needed.
22. Wild and Scenic Rivers: No activity may occur in a component of the National Wild
and Scenic River System, or in a river officially designated by Congress as a "study
Page 14 of 21
river" for possible inclusion in the system while the river is in an official study status,
unless the appropriate federal agency with direct management responsibility for such
river, has determined in writing that the proposed activity will not adversely affect the
Wild and Scenic River designation or study status. Information of Wild and Scenic
Rivers may be obtained from the appropriate federal land management agency
responsible for the designated Wild and Scenic River or study river (e.g. National
Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and
Wildlife Service).
23. Water Quality: All work or discharges to a watercourse resulting from permitted
construction activities, particularly hydraulic dredging, must meet applicable federal,
state, and local water quality and effluent standards on a continuing basis.
Measures must be adopted to prevent potential pollutants from entering the
watercourse. Construction materials and debris, including fuels, oil, and other liquid
substances, shall not be stored in the construction area in a manner that would allow
them to enter the watercourse as a result of spillage, natural runoff, or flooding.
24. Spill Contingency Plan: A contingency plan must be formulated that would be
effective in the event of a spill. This requirement is particularly applicable in
operations involving the handling of petroleum products. If a spill of any potential
pollutant should occur, it is the responsibility of the permittee to remove such
material, to minimize any contamination resulting from this spill, and to immediately
notify the State Duty Officer at 1-800-422-0798, and, if the project is in a Section 10
navigable water of the U.S., the U.S. Coast Guard at 1-800-424-8802.
25. Coastal Zone Management Consistency Determination: The Corps has determined
that RGP-004-MN is consistent with Minnesota's Lake Superior Coastal Program.
26. Disposal Sites: If dredged or excavated material is placed on an upland disposal site
(above the ordinary high-water mark), the site must be securely diked or contained
by some other acceptable method that prevents the return of potentially polluting
materials to the watercourse by surface runoff or by leaching. The containment area,
whether bulkhead or upland disposal site, must be fully completed prior to the
placement of any dredged material.
27. Maintenance and Transfer: You must maintain the authorized activity in good
condition and in conformance with the terms and conditions of this permit. You are
not relieved of this requirement if you abandon the permitted activity, although you
may make a good faith transfer to a third party. Should you wish to cease to maintain
the authorized activity or should you desire to abandon it without a good faith
transfer, you must obtain a modification of this permit from this office, which may
require restoration of the area.
28. Inspection: You must allow representatives from this office to inspect the authorized
activity at any time deemed necessary to ensure that it is being or has been
accomplished in accordance with the terms and conditions of RGP-004-MN.
29. State Section 401 Water Quality Certification: The Minnesota Pollution Control
Agency issued a water quality certification for RGP-004-MN on October 21, 2015.
Page 15 of 21
Permittees must comply with all conditions of the water quality certification. A copy
of the certification is attached to this permit.
30. Navigation:
a. No activity may cause more than a minimal adverse effect on navigation.
b. Any safety lights and signals prescribed by the United States Coast Guard,
through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the United
States.
c. The permittee understands and agrees that, if future operations by the United
States require the removal, relocation, or other alteration, of the structure or work
herein authorized, or if, in the opinion of the Secretary of the Army or his
authorized representative, said structure or work shall cause unreasonable
obstruction to the free navigation of the navigable waters, the permittee will be
required, upon due notice from the Corps, to remove, relocate, or alter the
structural work or obstructions caused thereby, without expense to the United
States. No claim shall be made against the United States on account of any
such removal or alteration.
31. Compliance: The permittee is responsible for ensuring that whoever performs,
supervises or oversees any portion of the physical work associated with the
construction of the project has a copy of, is familiar with, and complies with all the
terms and conditions of RGP-004-MN and any special conditions included on the
written verification letter from the Corps.
B. Special Conditions: The Corps may impose additional conditions on a project authorized
pursuant to RGP-004-MN that are determined necessary to avoid or minimize adverse
effects on the environment to ensure that the project is not contrary to the public interest.
Such conditions will be specifically identified in any Corps verification letter. Failure to
comply with all conditions and limitations of the authorization, including special
conditions incorporated into the Corps verification letter, constitutes a permit violation
and may subject the permittee to criminal, civil or administrative penalties, and
appropriate environmental remediation (which could include restoration of the site to its
pre-violation condition).
VIII.
Duration of Authorization: Unless otherwise specified in the Corps letter confirming your
project complies with the requirements of this RGP, the time limit for completing work
authorized by RGP-004-MN ends upon the expiration date of this RGP-004-MN. Activities
authorized under the RGP-004-MN that have commenced construction or are under contract
to commence construction, will remain authorized provided the activity is completed within
12 months of the date of the RGP-004-MN expiration, suspension, or revocation; whichever
is sooner. If you find that you need more time to complete the authorized activity, submit
your request for a time extension to this office for consideration at least three months before
the expiration date is reached.
Page 16 of 21
IX.
Further Information:
A. Congressional authorities: The permittee has been authorized to undertake the activity
described above pursuant to Section 404 of the Clean Water Act (33 U.S.C 1344) and
Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
B. Limits of this authorization:
1. RGP-004-MN does not obviate the need to obtain other federal, state, or local
authorizations required by law;
2. RGP-004-MN does not grant any property rights or exclusive privileges;
3. RGP-004-MN does not authorize any injury to the property or rights of others; and
4. RGP-004-MN does not authorize interference with any existing or proposed federal
project.
C. Limits of federal liability: In issuing this permit, the Federal Government does not
assume any liability for the following:
1. Damages to the permitted project or uses thereof as a result of other permitted or
unpermitted activities or from natural causes;
2. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest;
3. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit;
4. Design or construction deficiencies associated with the permitted work; or
5. Damage claims associated with any future modification, suspension, or revocation of
this permit.
D. Reliance on permittee's data: The determination of this office that an activity is not
contrary to the public interest will be made in reliance on the information provided by the
project proponent.
E. Reevaluation of decision: This office may reevaluate its decision for an individual
verification under this general permit at any time the circumstances warrant.
Circumstances that could require a reevaluation include, but are not limited to, the
following:
1. The permittee fails to comply with the terms and conditions of this permit;
2. The information provided by the permittee in support of the pre-construction
notification proves to have been false, incomplete, or inaccurate (See D above); or
3. Significant new information surfaces which this office did not consider in reaching the
original decision.
Page 17 of 21
Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative
order requiring the permittee to comply with the terms and conditions of their permit
and for the initiation of legal action where appropriate. The permittee will be required
to pay for any corrective measures ordered by this office, and if the permittee fails to
comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or
otherwise and bill the permittee for the cost.
F. This office may also reevaluate its decision to issue RGP-004-MN at any time the
circumstances warrant. Circumstances that could require a reevaluation include, but are
not limited to, the following: significant new information surfaces which this office did not
consider in reaching the original public interest decision. Such a reevaluation may result
in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.
X.
Definitions:
A. Bankfull Width: The bankfull width is the cross-sectional width of the channel at the
bankfull stage. The bankfull stage corresponds to the discharge at which channel
maintenance is the most effective, that is, the discharge at which moving sediment,
forming or removing bars, forming or changing bends and meanders, and generally
doing work that results in the average morphologic characteristics of channels. Bankfull
discharge is associated with a momentary maximum flow which, on average, has a
recurrence interval of 1.5 to 2 years as determined using a flood frequency analysis
(modified from Rosgen, D. (1996). Applied River Morphology).
B. Conversion: Activities that involve converting one type of wetland or aquatic resource to
another, for example, impounding water on a sedge meadow to create a deep marsh.
Conversion typically does not result in increased functions. For example, excavating a
sedge meadow to create a deep marsh, impounding water over a forested wetland that
drowns out the woody vegetation and replaces it with an aquatic bed community, or
placing a control structure on a tributary to create an impoundment, may degrade the
functions of the existing wetland or aquatic resource and, if regulated, can require
compensatory mitigation to offset adverse impacts.
C. Discharges: The term "discharge" means any discharge of dredged or fill material,
permanent or temporary.
D. Independent Utility: A test to determine what constitutes a single and complete project
in the Corps regulatory program. A project is considered to have independent utility if it
would be constructed absent the construction of other projects in the project area.
Portions of a multi-phase project that depend upon other phases of the project do not
have independent utility. Phases of a project that would be constructed even if the other
phases were not built can be considered as separate single and complete projects with
independent utility.
Page 18 of 21
E. Ordinary High Water Mark: The term ordinary high water mark means that line on the
shore established by the fluctuations of water and indicated by physical characteristics
such as a clear, natural line impressed on the bank, shelving, changes in the character
of soil, destruction of terrestrial vegetation, the presence of litter and debris, or other
appropriate means that consider the characteristics of the surrounding areas.
F. Permanent Impacts: Impacts that result in an enduring change to functions of waters of
the United States. Permanent impacts include those that result in a permanent loss of
waters or a decrease in certain functions of waters of the United States as a result of: (1)
the direct effects of the discharge; and (2) the indirect effects of the discharge including
excavation, inundation, drainage or permanent conversion of wetland plant community
types. For example, conversion of a forested or shrub swamp wetland to an herbaceous
wetland in a permanently maintained right-of-way (and associated with a discharge of
dredged or fill material) would be considered a permanent impact.
G. Practicable: Available and capable of being done after taking into consideration cost,
existing technology and logistics in light of the overall project purpose.
H. Pre-construction Notification: A request submitted by the project proponent to the Corps
for confirmation that a particular activity is authorized by RGP-004-MN. The request
may be a permit application, letter, or similar document that includes information about
the proposed work and its anticipated environmental effects. Pre-construction
notification may be required by the terms and conditions of the RGP-004-MN. A preconstruction notification may be voluntarily submitted in cases where pre-construction
notification is not required and the project proponent wants confirmation that the activity
is authorized by RGP-004-MN; the time required to evaluate an activity where reporting
is not required will be the same as if evaluating a project that requires a PCN.
I.
Roadside Ditch: A defined channel constructed adjacent to a road to convey runoff from
the road and from areas which drain toward the road.
J. Section 10: Refers to Section 10 of the Rivers and Harbors Act of 1899. This act
regulates structures or work in, over or under navigable waters of the Unites States
(except as otherwise provided in 33 CFR Section 322.4), and structures or work outside
the limits of navigable waters of the United States if these structures or work affect the
course, location, or condition of the waterbody in such a manner as to impact its
navigable capacity (33 CFR 322.3).
K. Single and Complete Project: The term "single and complete project" for the purposes of
RGP-004-MN is the total project proposed. A single and complete project must have
independent utility (see definition of "independent utility"), connect logical termini, and
must not restrict consideration of alternatives for other reasonably foreseeable projects.
For example, if construction of a linear road project affects several different areas of
waters/wetlands, the cumulative total of impacted waters of the U.S. is the basis for
deciding the project's total aquatic resource impact. For "phased" projects, each phase
may constitute a single and complete project if it has independent utility and would
accomplish its intended purpose whether or not other phases were constructed. Single
and complete non-linear projects may not be "piecemealed" to avoid the limits in this
General Permit authorization.
Page 19 of 21
Individual culvert and bridge replacements are considered single and complete projects
under this General Permit, unless they are a smaller component of a larger project, such
as a road reconstruction, that includes other impacts to waters of the U.S.
L. Temporary Impacts: Impacts that result in a temporary loss of function(s) of waters of
the United States as a result of a regulated discharge. The loss of function is considered
temporary when the affected area will be restored to preconstruction contours,
elevations, and vegetative cover within a specified timeframe after the impact occurs.
Examples of temporary impacts include temporary fills (i.e. cofferdams, topsoil storage,
work pads, timber mats, temporary access roads, etc.) and temporary structures (i.e.
docks, bridges, etc.). A conversion of wetland type associated with a discharge of
dredged or fill material (i.e. conversion of shrub swamp to herbaceous wetland) would be
considered temporary if the wetland is restored to preconstruction contours and
elevations and the same plant community type is re-established.
M. Tributary: A water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is
characterized by the presence of the physical indicators or a bed and banks and
ordinary high water mark. These physical indicators demonstrate there is volume,
frequency, and duration of flow sufficient to create a bed and banks and an ordinary high
water mark, and thus to qualify as a tributary. A tributary can be a natural, man-altered,
or man-made water and includes waters such as rivers, streams, canals, and ditches. A
water that otherwise qualifies as a tributary under this definition does not lose its status
as a tributary if, for any length, there are one or more constructed breaks (such as
bridges, culverts, pipes, or dams), or one or more natural breaks (such as wetlands
along the run of a stream, debris piles, boulder fields, or a stream that flows
underground) so long as a bed and banks and an ordinary high water mark can be
identified upstream of the break. A water that otherwise qualifies as a tributary under
this definition does not lose its status as a tributary if it contributes flow through a water
of the United States that does not meet the definition of tributary or through a nonjurisdictional water to a traditionally navigable water or interstate water.
N. Wetland: The term wetland means those areas that are inundated or saturated by
surface or ground water at a frequency and duration sufficient to support, and that under
normal circumstances do support, a prevalence of vegetation typically adapted for life in
saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and
similar areas.
XI.
Reference Materials:
A. Joint Application Form for Activities Affecting Water Resources in Minnesota (February
2014)
http://www.mvp.usace.army.mil/Missions/Regulatory.aspx
B. Minnesota Local Road Authority Reference Guide to U.S. Army Corps of Engineers
(Corps) Clean Water Act Section 404 & Rivers and Harbors Act Section 10 Permits
(February 1, 2014)
http://www.mvp.usace.army.mil/Missions/Regulatory.aspx
Page 20 of 21
C. Guidelines for Submittal of Delineation Reports to the St. Paul District Army Corps of
Engineers and Wetland Conservation Act Local Government Units in Minnesota, Version
2.0 (March 4, 2015)
http://www.mvp.usace.army.mil/Missions/Regulatory.aspx
D. St. Paul District Policy for Wetland Compensatory Mitigation in Minnesota (January
2009)
http://www.mvp.usace.army.mil/Missions/Regulatory.aspx
E. Minnesota Stormwater Manual, Minnesota Pollution Control Agency,
http://www.pca.state.mn.us/index.php?option=com_k2&view=item&id=993
F. Stormwater Best Management Practices Protecting Water Quality in Urban Areas,
Minnesota Pollution Control Agency,
http://www.pca.state.mn.us/index.php?option=com_k2&view=item&id=728
G. Range-Wide Biological Assessment for Transportation Projects for Indiana Bat and
Northern Long-Eared Bat, Appendix B: Bridge Inspection Guidance (April 17, 2015).
Federal Highway Administration and Federal Railroad Administration. Pages 121-129.
http://www.fws.gov/midwest/endangered/section7/fhwa/index.html
H. User's Guide for the Range-wide Programmatic Informal Consultation for Indiana Bat and
Northern Long-eared Bat, Version 1.1 (June 4, 2015). Federal Highway Administration,
Federal Railroad Administration, and U.S. Fish and Wildlife Service.
http://www.fws.gov/midwest/endangered/section7/fhwa/index.html
Page 21 of 21