Home

Norfolk District

Run scraper

The 10-day comment period following the October 30 hearing has been extended to ensure adequate time for review of the official transcript. Comments will now be accepted through close of business November 13

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The 10-day comment period following the October 30 hearing has been extended to ensure adequate time for review of the official transcript. Comments will now be accepted through close of business November 13, 2015.

CENAO-WRR November 5, 2015 NAO-2012-00080 / 13-V0408

FEDERAL PUBLIC NOTICE On October 1, 2015 the Norfolk District Regulatory Branch issued a Public Notice announcing a Public Hearing concerning Dominion Virginia Power’s Department of the Army Permit Application to construct a new high voltage aerial electrical transmission line in the North Hampton Roads Load Area (NHRLA), known as the Surry-Skiffes Creek-Whealton Transmission Line project. The 10-day comment period following the hearing has been extended to ensure adequate time for review of the official transcript, which is available at, http://www.nao.usace.army.mil/Missions/Regulatory/SkiffesCreekPowerLine.aspx. Comments will now be accepted through close of business November 13, 2015 and should be addressed to Randy Steffey, Norfolk District, Corps of Engineers (Attn; CENAO-WRR-S), 803 Front Street, Norfolk, Virginia 23510-1096, or sent via email to randy.l.steffey@usace.army.mil.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas