The application is for the conversion of two on-channel ponds, one wetland, and portions of a stream channel into residential subdivision housing units, access roads, and installation of public utilities.
Description of Work: The applicant’s proposal requires the placement of fill material into the 3.44-acre south pond, 1.11-acre north pond, and 0.08 acre wetland. The applicant has proposed the placement of approximately 7,500 cys of earthen material into the south pond, 2,400 cys of earthen material into the north pond, 100 cys of earthen material into the wetland, and 200 lf of stream channel (0.02 acre). The south pond and wetland area would be eliminated from the placement of fill material. Approximately, 39 lf and 120 lf, within the total 732 lf of RCP 2 (varies in size), would be constructed in the stream channel to channel flow and for a road crossing. The size of the north pond would be reduced from approximately 1.11 acres to a 0.01 acre (90 lf) stream channel 3 and approximately 41 lf of a twin 42 inch RCP would be constructed in the stream channel for a road crossing on RCP 1. All work will be performed utilizing earthmoving equipment.