Home

Portland District

Run scraper

Marci Johnson is the point-of-contact for this special public notice announcing the preliminary intent to accept funds from Northwest Natural Gas for the North Mist pipeline project to expedite the Department of the Army’s processing of North Mist’s proposed request to modify a federally constructed flood risk reduction project by constructing new underground gas storage capacity through the development of the Adams reservoir. Expiration date for this 30-day notice is Dec. 14

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Marci Johnson is the point-of-contact for this special public notice announcing the preliminary intent to accept funds from Northwest Natural Gas for the North Mist pipeline project to expedite the Department of the Army’s processing of North Mist’s proposed request to modify a federally constructed flood risk reduction project by constructing new underground gas storage capacity through the development of the Adams reservoir. Expiration date for this 30-day notice is Dec. 14, 2015.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas