12” NATURAL GAS PIPELINE IN PLAQUEMINES PARISH
NAME OF APPLICANT: High Point Gas Transmission, LLC, c/o Morris P. Hebert, Inc., 10343 Siegen Lane, Building 4-B, Baton Rouge, Louisiana 70810.
LOCATION OF WORK: Beginning of the project site is approximately 6 miles northwest of Port Sulphur, Louisiana and ending approximately 12.3 miles south of Belle Chasse, Louisiana, in Plaquemines Parish, as shown on the attached drawings.
Hydrologic Unit Code: 08090301 East Central Louisiana Coastal.
CHARACTER OF WORK: Install and maintain approximately 15.9 miles of new 12” natural gas pipeline to serve the Phillips 66 Alliance Refinery. A 75’ wide construction corridor will be utilized, consisting of a 25’ wide permanent easement and a 50’ wide temporary workspace. Also, the pipeline will utilize horizontal directional drilling in six different locations to avoid additional impacts to waterways, wetlands, and potential restoration projects. Project implementation would require excavation and deposition of approximately 104,344 cubic yards of native material and deposition of approximately 64.8 cubic yards of limestone. Approximately 66.0 acres of wetlands and/or waters of the U.S. will be impacted by the proposed activity. The applicant wishes to allow a one year growing season prior to determination of compensatory mitigation requirements, or to contract with an approved mitigation bank to offset the adverse impact to jurisdictional wetlands.
JOINT PUBLIC NOTICE
November 16, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1564
Stephanie.L.Castaing@usace.army.mil
Project Manager
Stephanie Castaing
Permit Application Number
MVN 2015-1475-EPP
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 150804-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
12" NATURAL GAS PIPELINE IN PLAQUEMINES PARISH
NAME OF APPLICANT: High Point Gas Transmission, LLC, c/o Morris P. Hebert, Inc., 10343
Siegen Lane, Building 4-B, Baton Rouge, Louisiana 70810.
LOCATION OF WORK: Beginning of the project site is approximately 6 miles northwest of Port
Sulphur, Louisiana and ending approximately 12.3 miles south of Belle Chasse, Louisiana, in
Plaquemines Parish, as shown on the attached drawings.
Hydrologic Unit Code: 08090301 East Central Louisiana Coastal.
CHARACTER OF WORK: Install and maintain approximately 15.9 miles of new 12" natural gas
pipeline to serve the Phillips 66 Alliance Refinery. A 75' wide construction corridor will be utilized,
consisting of a 25' wide permanent easement and a 50' wide temporary workspace. Also, the pipeline
will utilize horizontal directional drilling in six different locations to avoid additional impacts to
waterways, wetlands, and potential restoration projects. Project implementation would require
excavation and deposition of approximately 104,344 cubic yards of native material and deposition of
approximately 64.8 cubic yards of limestone. Approximately 66.0 acres of wetlands and/or waters of
the U.S. will be impacted by the proposed activity. The applicant wishes to allow a one year growing
season prior to determination of compensatory mitigation requirements, or to contract with an
approved mitigation bank to offset the adverse impact to jurisdictional wetlands.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number and be mailed to
the Louisiana Department of Environmental Quality at the address above. Individuals or parties may
request an extension of time in which to comment on the proposed work by writing or e-mailing the
Corps of Engineers Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the initial
comment period. The Section Chief will review the request and the requestor will be promptly notified
of the decision to grant or deny the request. If granted, the time extension will be continuous to the
initial comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
The New Orleans District has determined that the proposed activity will have no effect on listed
threatened and/or endangered species based on the Standard Local Operating Procedure for
Endangered Species of Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps
of Engineers and U.S. Fish and Wildlife Service, Ecological Services Office.
Our initial finding is that the proposed work would not affect any species, nor affect any habitat
designated as critical to the survival and recovery of such species, listed as endangered by the U.S.
Department of Commerce.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 66.0 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
T 17 S R 26 E
M.P. 2.0
M.P. 1.0
M.P. 0.0
M.P. 5.0
M.P. 4.0
M.P. 3.0
M.P. 8.0
M.P. 7.0
M.P. 6.0
T 17 S R 25 E
M.P. 12.0
M.P. 11.0
M.P. 10.0
M.P. 9.0
M.P. 14.0
M.P. 13.0
M.P. 15.91
EXISTING 10" LAFITTE
ALLIANCE P/L
EXISTING 10" P66
ALLIANCE P/L
M.P. 15.0
S
ACCES'±
OSED
PROP ROAD 4509
PROPOSED
ACCESS ROAD
LA.PL.019.00
Section 17
M.P.
3.0
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
Section 16
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
PROPOSED
HDD ENTRY
PROPOSED 12" HPGT
WEST POINTE A LA
HACHE PIPELINE (HDD)
PROPOSED
HDD EXIT
NATURAL GROUND
PLAN VIEW
HORIZONTAL SCALE 1" = 600'
NATURAL GROUND
PROPOSED 12" HPGT WEST POINTE A LA
HACHE PIPELINE (HDD)
PROFILE VIEW
HORIZONTAL SCALE 1" = 600'
VERTICAL SCALE 1" = 60'
cti
on
6
PROPOSED 200' x 200'
EXTRA TEMPORARY
WORK SPACE
GRAVEL RD. Section 7
Se
Section 8
20" GULF SOUTH
P/L 4.8' COVER
Section 5
Section 4
Section 3
STA. 68+72
HDD EXIT
8" GULF SOUTH
P/L 2.5' COVER
PROPOSED 200' x 200'
EXTRA TEMPORARY
WORK SPACE
PROPOSED 12" HPGT WEST
POINTE A LA HACHE PIPELINE
STA. 9+91
HDD ENTRY
EXISTING 26" LAKE
WASHINGTON LOOP LINE
PLAN VIEW
SCALE 1" = 1,000'
PROPOSED 12" HPGT WEST POINTE A LA
HACHE PIPELINE (HDD)
PROFILE VIEW
HORIZONTAL SCALE 1" = 1,000'
VERTICAL SCALE 1" = 500'
Section 2
PROPOSED 150' x 300'
EXTRA TEMPORARY
WORK SPACE
Section 4
PROPOSED 200' x 200'
EXTRA TEMPORARY
WORK SPACE
C/L OF LAKE
HERMITAGE ROAD
STA. 487+39
HDD ENTRY
Section 7
STA. 429+44
HDD EXIT
SHELL ROAD
PROPOSED 12" HPGT WEST
POINTE A LA HACHE PIPELINE
PLAN VIEW
n 5
Sectio
STA. 429+44
HDD ENTRY
STA. 487+39
HDD ENTRY
SCALE 1" = 1,000'
PROPOSED 12" HPGT WEST POINTE A LA
HACHE PIPELINE (HDD)
PROFILE VIEW
HORIZONTAL SCALE 1" = 1,000'
VERTICAL SCALE 1" = 500'
Section 10
PROPOSED 200' x 200'
EXTRA TEMPORARY
WORK SPACE
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
STA. 495+92
HDD ENTRY
PROPOSED 12" HPGT WEST
POINTE A LA HACHE PIPELINE
STA. 545+55
HDD EXIT
PROPOSED HDD 4961'±
Section 8
Section 9
Section 7
PLAN VIEW
SCALE 1" = 1,000'
PROPOSED 12" HPGT WEST POINTE A LA
HACHE PIPELINE (HDD)
PROFILE VIEW
HORIZONTAL SCALE 1" = 1,000'
VERTICAL SCALE 1" = 500'
STA. 617+66
HDD ENTRY
LIMITS OF PROPOSED LEVEE
PERMANENT EASEMENT
STA. 593+70
HDD EXIT
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
PROPOSED 12" HPGT
WEST POINTE A LA
HACHE PIPELINE (HDD)
LIMITS OF PROPOSED DRAINAGE
CANAL/DITCH PERMANENT EASEMENT
LIMITS OF PROPOSED DRAINAGE
CANAL/DITCH PERMANENT EASEMENT
PLAN VIEW
HES
STA. 593+70
HDD ENTRY
DITC
SCALE 1" = 500'
STA. 617+66
HDD ENTRY
FIELD
PROPOSED 20' x 2254'
EXTRA TEMPORARY
WORK SPACE FOR DRILL
BACKSTRING
PROPOSED 12" HPGT WEST POINTE A LA
HACHE PIPELINE (HDD)
PROFILE VIEW
HORIZONTAL SCALE 1" = 500'
VERTICAL SCALE 1" = 50'
MID-BARATARIA SEDIMENT
DIVERSION PROJECT LIMITS
CONV
EYA
CHAN NCE
NE
LIMITS L
SHEE
CUTOF T PILE
F WAL
L
PROPOSED 12" HPGT
WEST POINTE A LA
HACHE PIPELINE (HDD)
STA. 761+17
HDD ENTRY
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
SHEE
CUTOF T PILE
F WAL
L
CONV
EYA
CHAN NCE
NE
LIMITS L
STA. 742+28
HDD EXIT
LIMITS OF PROPOSED DRAINAGE
CANAL/DITCH PERMANENT EASEMENT
400'
PLAN
VIEW
C/L BASELINE
CHANNEL
STA. 761+17
HDD ENTRY
SCALE 1" = 500' 400'
Secti
o
PROPOSED CHANNEL
ELEVATION -25'
PROPOSED 12" HPGT WEST POINTE A LA
HACHE PIPELINE (HDD)
PROFILE VIEW
HORIZONTAL SCALE 1" = 500'
VERTICAL SCALE 1" = 50'
n 17
STA. 742+28
HDD EXIT
PROPOSED 200' x 200'
(0.92± ACRES) EXTRA
TEMPORARY WORK SPACE
M.P.
14.0
75' WORKSPACE
C/L PROPOSED 12" PIPELINE
25'
LIMITS OF WORKSPACE
62.5'
LIMITS OF PERMANENT EASEMENT
LIMITS OF PERMANENT EASEMENT
12.5'
PROPOSED
TEMPORARY
SPOIL
75' WORKSPACE
62.5'
PROPOSED
TEMP.
SUBSOIL
12.5'
±13' TRAVEL LANE
±13' PIPE DITCH
PROPOSED
TEMP.
TOPSOIL
±4' PIPE STRING
2' MIN. SAFETY SET BACK
LIMITS OF WORKSPACE
WORKSPACE DETAIL
TYPICAL AT STATIONS
STA. 0+00 TO STA. 9+91
STA. 68+72 TO STA. 158+29
STA. 201+67 TO STA. 429+44
STA. 545+55 TO STA. 593+70
STA. 617+66 TO STA. 742+28
STA. 761+17 TO STA. 839+88
N.G.
N.G.
6'±
5'±
PROPOSED EXCAVATION
PROPOSED 12" PIPELINE
33'
8'x16'x0.5'
TIMBER MATS
39'
DITCH DETAIL
3'
0
0
HORIZONTAL GRAPHIC SCALE
10'
20'
10'
20'
VERTICAL GRAPHIC SCALE
40'
40'
AREA
PROPOSED C/L
AD
ED
A
LAC CCE
RO SS E
SSE XIS
LAN TING
E
RO
PO
S
PR
O
PROPOSED
HDD ENTRY
STA. 158+29
PROPOSED C/L
PROPOSED
HDD EXIT
STA. 201+67
PRO
EXI POSED
PRI STING ACCE
VAT RO SS
E RO AD
AD
DRA
INA
GE
CAN
AL
PROPOSED C/L
T 17 S R 26 E
T 17 S R 25 E
PROPOSED C/L
PROPOSED C/L
PROPOSED C/L
M
ER
H
KE
LA
GE
ITA
.
RD
PROPOSED C/L
.
E RD
ITAG
RM
E HE
LAK
PROPOSED ACCESS
ROAD 25' WIDE
862'± LONG
AQUA
TIC R
E
IN TH SOURCES
IS AR
DELIN
EA
EA
THIS P
ROJE ; HOWEVER TED
C
,
T
WILL
NO IM
C
AQUA PACTS TO AUSE
TIC R
THE
ESO
THIS A URCES IN
REA.
OSPREY LANE
OA
GR
N
I
T
XIS
SS E NA
CCE AVEN RD.)
A
ED
TR
TE
POS WES PRIVA
(
PRO
D
ROA
D
PROPOSED C/L
PROPOSED
12" PIPELINE
PUSH
DIRECTION
PIPE DITCH
75' TEMP.
WORKSPACE
PROPOSED
TEMP. SPOIL
ACCESS-WAY
(MATS AS-REQUIRED)
SIDE BOOM TRACTOR
MATERIAL &
EQUIPMENT LAY DOWN
AREA
CRANE
TRAILER
PUSH SITE PLAN
300'
NOT TO SCALE
TOP OF WATER
PIPE DITCH
TO BE
BACKFILLED
NATURAL GROUND
TEMP. BOARD MATS
5'±
PUSH SITE PROFILE
NOT TO SCALE
N.G.
40.5'
PROPOSED
TEMP. SPOIL
34'
NOT TO SCALE
34.5'
±13' PIPE DITCH
2' MIN. SAFETY
SET BACK
30'
PUSH DITCH DETAIL
75' WORKSPACE
5'±
1
LIMITS OF WORKSPACE
MLW -1.0'
PROPOSED 12" PIPELINE
LIMITS OF WORKSPACE
MHW +1.0'
PIPE OFFLOADING
AREA
PIPE STORAGE
AREA
OFFICE
150'
TYPICAL AT STATIONS
STA. 487+39 TO STA. 495+92
N.G.
6'±
1
3'
PROPOSED EXCAVATION
PROPOSED 12" PIPELINE