You can copy from here when filling out the rest of the page.
BARGE FLEETING
ASCENSION PARISH, LOUISIANA
NAME OF APPLICANT: Carline Management Company, Inc., c/o Gulf South Engineering & Testing, Attention: Chad Poche, 2201 Aberdeen Street, Suite B, Kenner, Louisiana 70062.
LOCATION OF WORK: In the Mississippi River, left descending bank, approximately 171 miles above Head of Passes, near Burnside, Louisiana, in Ascension Parish, as shown on the attached drawings.
HUC: 08070100 Lower Mississippi River – Baton Rouge
Latitude: 30.13889 Longitude: -90.94292
CHARACTER OF WORK: The applicant has requested Department of the Army authorization for the installation and maintenance of barge fleeting and anchorage in the Mississippi River. The operation will consist of nine (9) mooring piles and twelve (12) anchor pile deadmen with chains. A preliminary analysis has determined that the proposed project would directly impact 0.002 of an acre of forested wetlands on the batture.
The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The applicant proposes to perform all batture work from the waterway utilizing a barge. No permanent adverse impacts to special aquatic sites are proposed; no compensatory mitigation is anticipated at this time.
JOINT PUBLIC NOTICE
November 23, 2015
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2278
Project Manager
Christine Thibodeaux
Christine.Thibodeaux@usace.army.mil
MVN 2014-01461-ST
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 141008-01
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of
the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X]
Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of
Section 401 of the Clean Water Act.
BARGE FLEETING
ASCENSION PARISH, LOUISIANA
NAME OF APPLICANT: Carline Management Company, Inc., c/o Gulf South Engineering
& Testing, Attention: Chad Poche, 2201 Aberdeen Street, Suite B, Kenner, Louisiana
70062.
LOCATION OF WORK: In the Mississippi River, left descending bank, approximately 171
miles above Head of Passes, near Burnside, Louisiana, in Ascension Parish, as shown on
the attached drawings.
HUC: 08070100 Lower Mississippi River Baton Rouge
Latitude: 30.13889 Longitude: -90.94292
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization for the installation and maintenance of barge fleeting and anchorage in the
Mississippi River. The operation will consist of nine (9) mooring piles and twelve (12)
anchor pile deadmen with chains. A preliminary analysis has determined that the
proposed project would directly impact 0.002 of an acre of forested wetlands on the
batture.
The applicant has designed the project to avoid and minimize direct and secondary
adverse impacts to the maximum extent practicable. The applicant proposes to perform all
2
batture work from the waterway utilizing a barge. No permanent adverse impacts to
special aquatic sites are proposed; no compensatory mitigation is anticipated at this time.
The comment period for the Department of Army will close in 30 days from the date
of this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral
needs, considerations of property ownership and, in general, the needs and welfare of the
people.
The US Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
Houmas House Plantation and Gardens is listed on the National Register of Historic
Places and located approximately 1,200 feet from the proposed work. The possibility
exists that the proposed work may damage or destroy presently unknown archeological,
scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the
3
State Archeologist and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed
as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. The
proposed work is located in waters known to be utilized by pallid sturgeon
(Scaphirhynchus albus) and is not likely to adversely affect the Pallid Sturgeon based on
the Standard Local Operating Procedure for Endangered Species of Louisiana (SLOPES)
dated October 22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and
Wildlife Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of up to 0 acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts
and the need for mitigation measures is subject to review by and coordination with the
National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate water quality standards will be
required from the Department of Environmental Quality, Office of Environmental Services
before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures
LEGEND:
Mooring Pile
(9 total)
Houmas House
Onshore Deadman
(12 total)
Mississippi River
Sailing Line
Sta. 2923+00
00
'
~7
30
'
210'
2
~1
Sta. 2913+00
Buzzi Unicem USA
(River Cement)
4 wide x 2 long
2
12
5'
Barge Fleeting Area
22
8'
Barge Wash and
Repair Area
MP
171
6 wide x 4 long
(TYP)
r
ive
iR
ipp
s
s
w
i
ss Flo
Mi
SCALE: FEET
0
500
1000
GULF SOUTH FILE 12-500
DATE: 11/12/15
CARLINE COMPANY
NEW BARGE FLEET
AND MOORING
BURNSIDE, LA
FOR
THE CARLINE COMPANIES
GONZALES, LA
SITE DETAIL
FIGURE NO. 2
UPSTREAM SECTION:
Protected Side
Levee (~Sta. 2913)
C
L
~240'
228' (6 Wide)
~200'
Flood Side
38'
(typ)
LA 44
Mississippi
River
10'
Deadman and
Anchor Chain
(Min. 18-in diameter
pipe pile, 20' long)
10'
LWRP El+3
48-in Diameter
Mooring Pile
(Min. 80-ft long)
DOWNSTREAM SECTION:
Protected Side
Levee (~Sta. 2923)
C
L
~350'
152' (4 Wide)
Flood Side
38'
(typ)
LA 44
Mississippi
River
10'
Deadman and
Anchor Chain
(Min. 18-in diameter
pipe pile, 20' long)
10'
LWRP El+3
48-in Diameter
Mooring Pile
(Min. 80-ft long)
GULF SOUTH FILE 12-500
DATE: 11/16/15
CARLINE COMPANY
NEW BARGE FLEET
AND MOORING
BURNSIDE, LA
FOR
THE CARLINE COMPANIES
GONZALES, LA
SECTIONS
FIGURE NO. 3