The application is for the placement of 3.35 acres of fill into waters of the United States associated with the construction of a shipping facility

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for the placement of 3.35 acres of fill into waters of the United States associated with the construction of a shipping facility, including access drives, employee and fleet parking lots, detention basin, sanitary sewer utility, and perimeter drainage swales.

The basic purpose of this work is to construct a commercial development. The overall purpose of this work is for the construction of a shipping facility within a 40-acre tract of land, which will serve Broken Arrow and the surrounding areas.

Original Proposal

Number or Location

Type of Waters

Impact Activity

Type of Fill Material

Qty of Material cys below OHWM

Footprint (ac and/or lf)

Wetland 1

Emergent Wetland

Placement of fill material

Earthen Material

1,533 cys

0.95 ac

Wetland 2

Forested Wetland

Placement of fill material

Earthen Material

484 cys

0.30 ac

Wetland 3

Forested Wetland

Placement of fill material

Earthen Material

2,500 cys

1.10 ac

Wetland 9

Forested Wetland

Placement of fill material

Earthen Material

1,775 cys

0.99 ac

Stream 2

Intermittent Stream

Placement of fill material

Earthen Material

16 cys

61 lf (Approximately 0.01 ac)

*Note: Earthen Material consists of clay, sand, and gravel.

cubic yards (cys), ordinary high water mark (OHWM), acre (ac), liner feet (lf)

The applicant’s proposal requires the placement of fill material (6,308 cys) into 3.34 ac of wetlands (1.94 ac of emergent wetlands, 1.40 ac of forested wetland) for commercial development, stormwater management basin, and parking areas; and 61 lf of intermittent stream for parking areas. The applicant has proposed the placement of approximately 1,533 cys of clay into Wetland 1; 484 cys of clay into Wetland 2; 2,500 cys into Wetland 3; 1,775 cys of clay into Wetland 9; and 16 cys of clay into Intermittent Stream 2. This project will require bulldozers, scrapers, front-end loaders, and trucks.

The project includes the avoidance of surface waters, including 1.01 acres of wetlands and 2,278 linear feet of intermittent stream. The applicant proposes to minimize impacts to jurisdictional waters through the construction of an offline wetland detention basin.

Preservation of existing riparian corridors and abutting wetlands within an approximate 10-acre preserved corridor located east of the project area. For unavoidable impacts to jurisdictional water, the applicant proposes to purchase mitigation credits from an approved provider.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas