Home

Alaska District

Run scraper

POA-1995-120

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The purpose of Donlin Gold’s proposed project is to profitably produce gold from ore reserves owned by Calista Corporation, an Alaska Native Claims Settlement Act (ANCSA) corporation, utilizing open-pit mining methods and conventional, proven milling processes suitable for the characteristics of the ore reserves and for application in remote western Alaska. The need for the proposed project is to enable Calista Corporation and The Kuskokwim Corporation (TKC) to maximize economic benefits for their Native shareholders, from lands selected under ANCSA for their mineral potential, by producing gold to meet world-wide demand. Gold is an established commodity with international markets. Donlin Gold is proposing the development of an open pit, hardrock gold mine. The proposed Donlin Gold project includes land leased from Calista Corporation (Calista), The Kuskokwim Corporation and CIRI. All three are Alaska Native Claims Settlement Act (ANCSA) regional corporations. Calista leases include a portion of the total surface estate and all of the sub-surface estate. Calista holds the subsurface (mineral) estate for ANCSA lands in the region. The Kuskokwim Corporation also owns a portion of the surface estate potentially impacted. CIRI owns a portion of the surface estate upon which a portion of the proposed pipeline would be built. The remainder of potentially affected lands (principally pipeline impacts) are owned primarily by the State of Alaska or U.S. Bureau of Land Management (BLM). Please contact Keith Gordon at (907) 753-5710, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at POA.donlingoldeis@usace.army.mil if further information is desired concerning this notice.

The purpose of Donlin Gold’s proposed project is to profitably produce gold from ore reserves owned by Calista Corporation, an Alaska Native Claims Settlement Act (ANCSA) corporation, utilizing open-pit mining methods and conventional, proven milling processes suitable for the characteristics of the ore reserves and for application in remote western Alaska. The need for the proposed project is to enable Calista Corporation and The Kuskokwim Corporation (TKC) to maximize economic benefits for their Native shareholders, from lands selected under ANCSA for their mineral potential, by producing gold to meet world-wide demand. Gold is an established commodity with international markets. Donlin Gold is proposing the development of an open pit, hardrock gold mine. The proposed Donlin Gold project includes land leased from Calista Corporation (Calista), The Kuskokwim Corporation and CIRI. All three are Alaska Native Claims Settlement Act (ANCSA) regional corporations. Calista leases include a portion of the total surface estate and all of the sub-surface estate. Calista holds the subsurface (mineral) estate for ANCSA lands in the region. The Kuskokwim Corporation also owns a portion of the surface estate potentially impacted. CIRI owns a portion of the surface estate upon which a portion of the proposed pipeline would be built. The remainder of potentially affected lands (principally pipeline impacts) are owned primarily by the State of Alaska or U.S. Bureau of Land Management (BLM). Please contact Keith Gordon at (907) 753-5710, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at POA.donlingoldeis@usace.army.mil if further information is desired concerning this notice. POA-1995-120 Crooked Creek Donlin 404 Section 10_PN PN Drawings_Part1 PN Drawings_Part2 PN Drawings_Part3 PN Drawings_Part4 PN Drawings_Part5 PN Drawings_Part6 PN Drawings_Part7 PN Drawings_Part8 PN Drawings_Part9 PN Drawings_Part10 PN Drawings_Part11 PN Drawings_Part12 PN Drawings_Part13 PN Drawings_Part14 PN Drawings_Part15 PN Drawings_Part16 PN Drawings_Part17 PN Drawings_Part18 PN Drawings_Part19 PN Drawings_Part20

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas