The U.S. Army Corps of Engineers, Albuquerque District, (Corps) and the New Mexico Environment Department’s Surface Water Quality Bureau (SWQB) are evaluating an application for the Milan Tract Farms Flood Control Diversion Channel Project on the Rio San Jose, located in Milan, Cibola County, New Mexico. The proposed project would result in impacts to approximately 4.65 acres of waters of the United States in the Rio San Jose. This notice is to inform interested parties of the proposed activity and to solicit comments.
JOINT PUBLIC NOTICE
Application Number:
SPA-2014-00408-ABQ
Date:
December 1, 2015
Comments Due: December 31, 2015
SUBJECT:
The U.S. Army Corps of Engineers, Albuquerque District, (Corps) and the New
Mexico Environment Department’s Surface Water Quality Bureau (SWQB) are
evaluating an application for the Milan Tract Farms Flood Control Diversion
Channel Project on the Rio San Jose, located in Milan, Cibola County, New Mexico. The proposed project would result
in impacts to approximately 4.65 acres of waters of the United States in the Rio San Jose. This notice
is to inform interested parties of the proposed activity and to solicit
comments.
AUTHORITY:
This application is being evaluated under Sections 404 and 401 of the Clean
Water Act (CWA) for the discharge of dredged or fill material in waters of the
United States (U.S.). State water
quality certification is provided under the authority of 20.6.2 New Mexico
Administrative Code.
APPLICANT: Village of
Milan (Village)
Attn:
Marcella Sandoval, Village Manager
623
Uranium Avenue
Milan,
New Mexico 87021
AGENT: Theresa Knoblock
Tierra
Right of Way
1575
E. River Road, Suite 201
Tucson,
Arizona 85718
LOCATION: The project site is located on the Rio San Jose, at Latitude 35.20007,
Longitude -107.89305, Milan, Cibola County, New Mexico.
PROJECT DESCRIPTION: The Village
proposes to construct a flood control project (Project) along
approximately 9581 linear feet of the Rio San Jose within the Village of Milan. The Project would include:
Relocation of the existing
river segment between Mills and Nursery Road and filling in the original
channel; and
Excavation of a new portion
of channel west of the existing along Nursery Road.
The existing channel is 14 feet wide from toe to toe
of the channel slope with an average depth of four feet from the top of bank to
the channel bottom. The proposed channel
width is 80 feet wide with an average depth of seven feet. Channel bank armoring in the form of riprap
would be placed at all channel turning points.
A low-flow channel would be allowed to form within the 80-foot channel
bottom. The Project would impact 4.65 acres
of waters of the U.S. (Preliminary Jurisdictional Delineation).
The Village
has stated the basic project purpose is flood control and the overall project
purpose is to reduce flood risk in the vicinity of the Rio San Jose. Further refinements of the overall project
purpose may be developed by the Corps during the project evaluation. The Village believes there is a need to reduce
flood risk to the properties adjacent to the Rio San Jose and accommodate the
100-year flood event within the channel of the proposed project. The attached drawings provide additional
project details.
PROPOSED MITIGATION: The Village
proposes to allow the Rio San Jose to develop natural stream morphology and
riparian habitat within the 80-foot flood control channel. The Village proposes to balance operation and
maintenance needs with the formation and management of riparian habitat. Note that the existing channel is currently ephemeral
and does not support native riparian habitat.
ADDITIONAL INFORMATION:
Environmental Setting. There are
approximately 4.65 acres of the Rio San Jose that are waters of the U.S. within
the proposed project area. This reach of
the Rio San Jose is generally ephemeral, flowing only in response to rain
events. A biological assessment conducted by Tierra Right-of-Way Services, Inc.
(Biological Assessment for the Proposed Milan Tract Farms Flood Control Diversion
Channel Project, October 2015) for the Village indicate there is minimal
natural habitat in the vicinity of the Project. Vegetation is limited and
consists of upland or invasive species, including rabbitbrush (Chrysothamnus nauseosus), four-wing salt
bush (Atriplex canescens), salt cedar
(Tamarisk pentandra), kochia (Kochia scoparia), Russian thistle (Salsola kali) and Siberian elm (Ulmus pumila). Species or species sign observed included
only gopher mounds (Thomomys sp),
coyote scat (Canis latrans), and
Gunnison’s prairie dog (Cynomys gunnisoni). The Rio San Jose has been relocated from the
earliest recorded maps (GLO Maps from 1873), and is currently 500-1000 feet
east of the original channel alignment.
Local, non-engineered channelization has reduced the stream functions
and services to primarily flow and sediment conveyance and moderate
infiltration. Existing land use is
primarily fallow agricultural to the north, east and west of the Project. There is urban residential development to the
south and southeast.
Alternatives. The Village has provided information
concerning project alternatives and include the following:
No work within waters of the
U.S.: As the Project is water dependent, a “no work
within waters of the U.S.” alternative would effectively be a No Project
alternative (Alternative 1).
Widen and protect in place: In this alternative, the
village would only enlarge the existing Rio San Jose channel, reducing the
100-year floodplain but not confining it to the constructed channel. The Rio San Jose would remain in its current
location, with levees on both sides (Alternative 2).
Realign channel (Applicant preferred
alternative): For this alternative, the Village would realign the channel and widen it
to 80 feet, adding riprap slope protection at channel turns. The Rio San Jose would be allowed to develop
an interior low-flow channel and establish riparian habitat naturally (Alternative
3).
Realign channel and create a
low-flow channel: In this alternative, the Village
would not only create the relocated 80-foot wide channel, but would also design
a low-flow channel for the Rio San Jose instead of allowing the low-flow
channel to develop over time (Alternative 4).
Other alternatives may
develop during the review process for this permit application. All reasonable
project alternatives, in particular those which may be less damaging to the
aquatic environment, will be considered.
EVALUATION FACTORS: The decision whether to issue a permit will
be based on an evaluation of the probable impacts, including cumulative
impacts, of the described activity on the public interest. That decision will reflect the national
concern for both protection and utilization of important resources. The benefit, which reasonably may be expected
to accrue from the described activity, must be balanced against its reasonably
foreseeable detriments. All factors
which may be relevant to the described activity will be considered, including
the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish
and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of
the people. The activity's impact on the
public interest will include application of the Section 404(b)(1) guidelines
promulgated by the Administrator, Environmental Protection Agency (40 CFR Part
230).
HISTORIC PROPERTIES: The
Corps consulted district files and records, the latest version of the National
Register of Historic Places (NRHP), and state records of NRHP-eligible and
potentially eligible historic properties to determine if there are any historic
properties that may be affected by the proposed undertaking. Additionally, the project area has been
recently surveyed for historic properties. Based on this initial information, the Corps
has made a determination that the proposed project will not adversely affect historic
properties. Regardless the Corps will
consult with the New Mexico State Historic Preservation Officer regarding the
Project.
ENDANGERED SPECIES: The Corps has reviewed the U.S. Fish and
Wildlife Service's latest published version of Federally-listed endangered and
threatened species located in Cibola County, New Mexico to determine if any listed species or their
critical habitat may occur in the proposed project area. Based upon this review and the submitted
biological assessment, the Corps has made a preliminary determination that the
proposed project will not affect any Federally-listed endangered or threatened
species or their critical habitat protected by the Endangered Species Act.
FLOODPLAIN
MANAGEMENT: The Corps is sending a copy of this public
notice to the local floodplain administrator.
In accordance with 44 CFR part 60 (Flood Plain Management Regulations
Criteria for Land Management and Use), the floodplain administrators of
participating communities are required to review all proposed development to
determine if a floodplain development permit is required and maintain records
of such review.
COMMENT SUBMITTAL AND DEADLINES: The Corps and SWQB are soliciting comments from all
interested parties in to consider and evaluate the impacts of this proposed
activity. Any comments received will be
considered to determine whether to issue, issue with special conditions, or
deny a permit for this proposal.
Submittal of Corps
Permit Application Comments: All comments regarding the Corps
permit application for the above-described project must be received on or
before December 31, 2015, which is the close of the
comment period. Comments on state
Section 401 certification must be submitted as described below under “Water
Quality Certification Comments”. Extensions of the comment period may be granted
for valid reasons provided a written request is received by the limiting
date. If no comments are received by
that date, it will be considered that there are no objections. Anyone may request, in writing, that a public
hearing be held to consider this application.
Requests shall specifically state the particular reason(s) for holding a
public hearing. If the Corps determines
that the information received in response to this notice is inadequate for
thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested
parties will be notified of the time, date, and location. Comments and requests for additional
information on the Corps permitting action should be submitted to:
Deanna
L. Cummings, Senior Project Manager
US
Army Corps of Engineers, Albuquerque District
4101
Jefferson Plaza NE
Albuquerque,
New Mexico 87109
Deanna.L.Cummings@usace.army.mil
Submittal of Water
Quality Certification Comments: Section 401 requires that any applicant for an individual
Section 404 permit provide proof of water quality certification to the Corps
prior to permit issuance. For the above described project, the applicant is
required to obtain water quality certification, under Section 401 of the CWA,
from the SWQB.
This
notice serves to notify the public that the SWQB will consider issuing a
certification under Section 401 of the CWA.
The purpose of such certification is to reasonably ensure that the
permitted activities will be conducted in a manner compliant with applicable
New Mexico water quality standards, including the antidegradation policy, and
the statewide water quality management plan.
This Notice, including notice of the 30-day public comment period, is
also posted on the SWQB website at: http://www.nmenv.state.nm.us/swqb/WQA/Notice/.
SWQB
will accept and consider written comments regarding the state certification
received during the public comment period.
Comments may be submitted electronically or by hard copy to:
Greg
Kaufman
New
Mexico Environment Department SWQB
P.O.
Box 5469
Santa
Fe, NM 87502-5469
505-827-0572
FAX
505-827-0160
E-mail:
greg.kaufman@state.nm.us
Please note that names and
addresses of those who submit comments in response to this public notice may be
made publicly available through the Freedom of Information Act, the New Mexico
Inspection of Public Records Act, or both.