Home

New England District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The District Engineer has received a permit application from the Maine DoT to place permanent and

The District Engineer has received a permit application from the Maine DoT to place permanent and temporary filI below the ordinary high water line of the East Machias River and in adjacent freshwater wetlands at East Machias, ME in order to facilitate the replacement of the existing deteriorated Jacksonville Bridge (Route 191).

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas