You can copy from here when filling out the rest of the page.
DREDGING AND CREST WIER CONSTRUCTION FOR MARSH CREATION IN TERREBONNE PARISH
NAME OF APPLICANT: United States Fish and Wildlife Service, c/o Louisiana Coastal Protection and Restoration Authority, Attn: Sydney Dobson, P.O. Box 44027, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: In Lost Lake, Bayou DeCade, and Carencro Bayou, Sections 1, 2, 3, 4, 5, 6, 20, 21, 28, 29, 32, 33, and 34, T19 and 20S-R14E, approximately 23 miles southwesterly from Houma, Louisiana, in Terrebonne Parish, within the West Central Louisiana Coastal Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to hydraulically dredge Lost Lake and provide material for 643 acres of marsh creation in eight (8) different areas to include terraces. Additionally, five (5) fixed crest weir structures will be replaced with variable crest structures to improve hydrology within two (2) of the semi-impounded marsh creation areas. A dredge pipeline will be installed temporarily for the movement of the dredged material to the marsh creation areas. A permit for the primary activity was issued on February 24, 2014 and modified on November 24, 2014. The following items are additional modifications to the original authorization. The applicant will add three (3) new areas of creation, modify the location of four (4) terraces, one (1) control structure will be extended, dykes will be modified to increase slope stability, one of the creation areas will be split into two sections to avoid a pipeline, a switch will be made from semi contained dykes to full earthen containment dykes, the depth of the dredged access channel will be increased by dredging, and the dredge pipeline will be buried under Bayou Decade and floated on pontoons to cross Whitson Pipeline and the rock revetment at Bayou Decade. Approximately 8,699,041.25 cubic yards of material will be dredged and deposited in areas of degraded marsh for marsh re-creation and construction of terraces covering 643 acres.
A Preliminary analysis has determined that the proposed project would temporarily impact 608 acres of jurisdictional waters bottoms at the project site.
The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The purpose of the project is to create marsh and further protect additional marsh from erosion, therefore not mitigation will be required.
JOINT PUBLIC NOTICE
December 14, 2015
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN 2011-0954-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
130319-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of
the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X]
Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of
the Clean Water Act.
DREDGING AND CREST WIER CONSTRUCTION FOR MARSH CREATION IN
TERREBONNE PARISH
NAME OF APPLICANT: United States Fish and Wildlife Service, c/o Louisiana Coastal
Protection and Restoration Authority, Attn: Sydney Dobson, P.O. Box 44027, Baton
Rouge, Louisiana 70804.
LOCATION OF WORK: In Lost Lake, Bayou DeCade, and Carencro Bayou, Sections 1,
2, 3, 4, 5, 6, 20, 21, 28, 29, 32, 33, and 34, T19 and 20S-R14E, approximately 23 miles
southwesterly from Houma, Louisiana, in Terrebonne Parish, within the West Central
Louisiana Coastal Basin in hydrologic unit (HUC 08090302), as shown on the attached
drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to hydraulically dredge Lost Lake and provide material for 643 acres of
marsh creation in eight (8) different areas to include terraces. Additionally, five (5) fixed
crest weir structures will be replaced with variable crest structures to improve hydrology
within two (2) of the semi-impounded marsh creation areas. A dredge pipeline will be
installed temporarily for the movement of the dredged material to the marsh creation
areas. A permit for the primary activity was issued on February 24, 2014 and modified on
November 24, 2014. The following items are additional modifications to the original
2
authorization. The applicant will add three (3) new areas of creation, modify the location of
four (4) terraces, one (1) control structure will be extended, dykes will be modified to
increase slope stability, one of the creation areas will be split into two sections to avoid a
pipeline, a switch will be made from semi contained dykes to full earthen containment
dykes, the depth of the dredged access channel will be increased by dredging, and the
dredge pipeline will be buried under Bayou Decade and floated on pontoons to cross
Whitson Pipeline and the rock revetment at Bayou Decade. Approximately 8,699,041.25
cubic yards of material will be dredged and deposited in areas of degraded marsh for
marsh re-creation and construction of terraces covering 643 acres.
A Preliminary analysis has determined that the proposed project would temporarily impact
608 acres of jurisdictional waters bottoms at the project site.
The applicant has designed the project to avoid and minimize direct and secondary
adverse impacts to the maximum extent practicable. The purpose of the project is to
create marsh and further protect additional marsh from erosion, therefore not mitigation
will be required.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and
be mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
3
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land
use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral
needs, considerations of property ownership and, in general, the needs and welfare of the
people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used
to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, pre-historical, historical
sites, or data. Issuance of this public notice solicits input from the State Archeologist and
State Historic Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
The New Orleans District has determined that the proposed project is located in waters
known to be utilized by the West Indian Manatee (Trichechus manatus) and determined
that the proposed activity is not likely to adversely affect the species based on the
Standard Local Operating Procedure for Endangered Species of Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and
Wildlife Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 608 acres of EFH utilized by various
life stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
4
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued unless
the applicant received approval or a waiver of the Coastal Use Permit by the Department
of Natural Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures