The U.S. Army Corps of Engineers (Corps), Portland District, Regulatory Branch is providing the following emergency permitting procedures to the public:
The U.S. Army Corps of Engineers (Corps), Portland District, Regulatory Branch is providing the following emergency permitting procedures to the public:
The U.S. Army Corps of Engineers (Corps) defines emergency by our Regulations at 33 CFR Part 325.2(e)(4) as a situation which would result in an unacceptable hazard to life, a significant loss of property, or an immediate, unforeseen, and significant economic hardship if corrective action requiring a Department of the Army permit is not undertaken within a time period less than the normal time needed to process the application under standard procedures.
The Corps may not view an action as an emergency if the applicant has known of the deficient condition of the failing structure and has not made reasonable attempts to secure appropriate permits and conduct timely repairs. Emergency declarations by the state or a county government does not mean all repair activities qualify as emergency situations. The Corps makes emergency authorization decisions on a case-by-case basis.
You must notify the Corps Regulatory Branch of the need to perform emergency work. The Corps has the responsibility to determine if the proposed work is consistent with the Corps' definition of an emergency, whether authorization is needed, and if so, which type of authorization is required.
Contact the Corps Regulatory Branch Immediately - Call the Corps Regulatory Branch project manager for your region to discuss the situation as soon as possible. If the project managers are not available, contact the Section or Branch Chief (on same link). If you need to contact the Corps after work hours or on the weekends, please contact the Branch Chief, Shawn Zinszer, at 503-927-0363.
If the work meets the Corps' definition of an emergency, then the Corps will initiate the emergency authorization procedures. Emergency authorization procedures include coordinating with resource agencies, tribes, and our Division office. This process may take from a few hours to up to a week. Work cannot begin until the Corps indicates work may commence. The emergency work should be the minimum necessary to resolve the emergency situation. Following the emergency, additional coordination with the Corps will be required to remove or modify the emergency work or for additional proposed work to complete the final repairs. The project may require compensatory mitigation or other requirements. A final permit approval may take over 6 months to obtain.
In certain circumstances we may initiate "expedited" (not emergency) authorization procedures. This process may take several weeks to complete. In other cases, the proposed work will be subject to our regular permit process appropriate for the nature and location of the work.
It is important you contact the Corps prior to beginning work. Unauthorized discharges may be subject to an enforcement action.
SPECIAL PUBLIC NOTICE
Emergency Procedures
Point of Contact: Carrie Bond
Phone: (503) 808-4387
Email: Carrie.L.Bond@usace.army.mil
Issue Date: Dec. 21, 2015
The U.S. Army Corps of Engineers (Corps), Portland District, Regulatory Branch is providing
the following emergency permitting procedures to the public:
The U.S. Army Corps of Engineers (Corps) defines emergency by our Regulations at 33 CFR
Part 325.2(e)(4) as a situation which would result in an unacceptable hazard to life, a significant
loss of property, or an immediate, unforeseen, and significant economic hardship if corrective
action requiring a Department of the Army permit is not undertaken within a time period less
than the normal time needed to process the application under standard procedures.
The Corps may not view an action as an emergency if the applicant has known of the deficient
condition of the failing structure and has not made reasonable attempts to secure appropriate
permits and conduct timely repairs. Emergency declarations by the state or a county
government does not mean all repair activities qualify as emergency situations. The Corps
makes emergency authorization decisions on a case-by-case basis.
You must notify the Corps Regulatory Branch of the need to perform emergency work. The
Corps has the responsibility to determine if the proposed work is consistent with the Corps'
definition of an emergency, whether authorization is needed, and if so, which type of
authorization is required.
Contact the Corps Regulatory Branch Immediately - Call the Corps Regulatory Branch
project manager for your region to discuss the situation as soon as possible. For a list of link
visit
project
managers
and
their
regions,
http://www.nwp.usace.army.mil/Missions/Regulatory/Contact.aspx. If the project managers
are not available, contact the Section or Branch Chief (on same link). If you need to contact
the Corps after work hours or on the weekends, please contact the Branch Chief, Shawn
Zinszer, at 503-927-0363.
If the work meets the Corps' definition of an emergency, then the Corps will initiate the
emergency authorization procedures.
Emergency authorization procedures include
coordinating with resource agencies, tribes, and our Division office. This process may take
from a few hours to up to a week. Work cannot begin until the Corps indicates work may
commence. The emergency work should be the minimum necessary to resolve the emergency
situation. Following the emergency, additional coordination with the Corps will be required to
remove or modify the emergency work or for additional proposed work to complete the final
repairs. The project may require compensatory mitigation or other requirements. A final permit
approval may take over 6 months to obtain.
Page 1 of 2
In certain circumstances we may initiate "expedited" (not emergency) authorization
procedures. This process may take several weeks to complete. In other cases, the proposed
work will be subject to our regular permit process appropriate for the nature and location of the
work.
It is important you contact the Corps prior to beginning work. Unauthorized discharges may be
subject to an enforcement action.
--30--
Page 2 of 2