You can copy from here when filling out the rest of the page.
The applicant proposes to construct a ship docking facility in the Corpus Christi Ship Channel.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to:
1) Hydraulically and/or mechanically dredge a new 12.21-acre (492,000 cubic yards) basin to a depth of -45 feet mean low tide (MLT) in the CCSC with side slopes of the basin being constructed at 3:1;
2) Place the material in the following Dredged Material Placement Areas (DMPAs) – Suntide DMPA, DMPA No. 6, South Shore DMPA Cell A and DMPA Cell B, Herbie Maurer DMPA, or DMPA 1;
3) Construct a 50-foot-wide by 140-foot-long jetty platform;
4) Construct a 25- by 100-foot approach trestle;
5) Construct a 20- by 130-foot pipe rack;
6) Construct a 3- by 260-foot catwalk with four 72-inch diameter breasting structures. The catwalk will extend approximately 130 feet both east and west of the proposed jetty platform; and
7) Construct four 48-inch diameter fender monopoles.