You can copy from here when filling out the rest of the page.
Michael LaDouceur is the Regulatory point-of-contact for this application for a permit from Robert Evans Company, Inc., to conduct work impacting wetlands on property located at the intersection of NW Five Oaks Drive and NW Croeni Road near Hillsboro, Oregon.
PUBLIC NOTICE for Permit Application
Issue Date: December 24, 2015
Expiration Date: January 25, 2016
US Army Corps of Engineers No: NWP-2015-518
30-Day Notice Oregon Department of State Lands No: APP0058613
Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.
Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be emailed to Michael LaDouceur or mailed to the following address:
U.S. Army Corps of Engineers
Regulatory Branch
Mr. Michael LaDouceur, michael.a.ladouceur@usace.army.mil
P.O. 2946
Portland, Oregon 97208-2946
Applicant:Robert Evans Company, Inc., Mr. Robert Evans, 1505 NW 19th Avenue, Portland, Oregon 97209
Location:The proposed project is located at the intersection of NW Five Oaks Drive and NW Croeni Road near Hillsboro, Unincorporated Washington County, Oregon (latitude 45.558442, longitude -122.907897)
Waterway:The proposed project would impact Wetland A – a 1.46 acre palustrine emergent, seasonally flooded slope wetland, Wetland B a .02 acre palustrine scrub-shrub, seasonally flooded slope wetland, and a roadside ditch. Wetland B continues off-site to the south west.
Project Description:The applicant has proposed to permanently impact 1.48 acres of wetlands to construct multiple commercial buildings, parking, stormwater features, and storage areas. The 23 - acre site will be graded to facilitate building construction. In addition, NW Five Oaks Drive would be abandoned and improvements would be made to NW Croeni Road. Stormwater facilities would be installed to treat and detain runoff from the new impervious surfaces.
Mitigation: The applicant proposed purchasing 1.48 credits from the Tualatin Valley Environmental Mitigation Bank to compensate for the loss of 1.48 acres of wetland. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.
Purpose:To construct commercial and showroom facilities and attendant structures within the Portland Metro Area.
Drawing(s):Eight (8) drawings are attached and labeled Corps No. NWP-2015-518
Additional Information:Additional information may be obtained from Mr. Michael LaDouceur, Project Manager, U.S. Army Corps of Engineers at (503) 808-4337, or by e-mail at michael.a.ladouceur@usace.army.mil.
Authority:This permit will be issued or denied under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Water Quality Certification:A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.
Section 404(b)(1) Evaluation:The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.
Public Hearing:Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Endangered Species:Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.
Cultural Resources:An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.
Evaluation:The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Additional Requirements:State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.
, __.··e:
1·J
I
·',
"
\,_
NWP-2015-518
1 of 8
Project #5779
Date 9/17/15
~
Pacific Habitat Services, Inc.
9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
3
Aerial Photo ITJIGURE
Peterson Machinery Company, Oregon
Google Earth, 2015
2 of 8
NWP-2015-518
I
=
LEGEND
=
E2ITB
Phone: (503) 570-0800
Study Area Boundary (22.61 ac)
Wetland (1.48 ac)
Fax (503) 570-0855
Plans Provided by CIDA
Roadside Ditch
Pacific Habitat SeNices,lnc.
9450 SN Conmarcc Clrde, Stlltc 180Wlbofflille, Oregon 97070
0
100
200
SCALE IN FEET
400
Existing Conditions
Peterson Machinery Company - Hillsboro, OR
IFl:rl
12-07-2015
3 of 8
NWP-2015-518
'-,
LEGEND
-- = 1~ --
,,,____
__
-
-
~
-,_
Study Area Boundary (22.61 ac)
Existing Contours
Proposed Contours
Wetland A - 1.46 ac/ 20, 115 cy
Permanent Wetland Impact
Fill (1.48 ac/ 20, 146 cy)
act 31 cy
Plans Provided by CIDA
Wetland B - 0.02
~-
[Jt:JJD
Pacific Habitat Services,Inc.
9450 SN Commerce Circle, Suite 180 INllsoovD!o, Oregon 97070
P hone: (503) 570-0600
F3:io: (503) 570-0855
0
100
200
SCALE IN FEET
400
Proposed Site Plan, Grading and Cross Section Locations
Peterson Machinery Company - Hillsboro, OR
12-08-2015
m
4 of 8
NWP-2015-518
Plans Provided by CIDA
Cross Section 81 -81 '
I EXISTIN G GRAnF"
V#//fi'/,/,
'.:
,Kh
~#
I
----1
~-~------15.3-_---t---+--__J
r---+~-.k-~ ~~J-~
o~
'"=-g
1~-:iii
1-----1
9450 SN Commerce Clrde, Sulla 180 Wllsorivllle, Oregon 97070
Phone: (503) 570-0800
Fox (503) 570-0855
Pacific Habitat Services,Inc.
Cross Section A-A'
cc
~v1
EJi
'""""'
~"'
rc;-o
_, >
,
\
y ,-
..... 111\
" RADE
GRADE
Cross Section 82-82'
Cross Section of Wetland Impacts
Peterson Machinery Company - Hillsboro, OR
IFl?REI
12-03-2015
5 of 8
NWP-2015-518
'"..............
'
'·
'-,
I
I
l ,,
~s 'fJjfS.
I
~
~D/~'IJ,
:.:-....>~--"'- ····.,..____
'--.
~
<>0 . "- "-
(us 1-tii;y'..-.,
Existing Contours
Study Area Boundary (22.61 ac)
vv,q Y
/'f.t;Qf.t/A .'
v,vs.$"
S/fA,
LEGEND
--21~--
Proposed Contours
=
_ ,,,___
Fax (503) 570-0855
Plans Provided by CIDA
Concrete Washout
Construction Entrance
Inlet Protection
--o--- Sediment Fence
0
~
~
Phone: (503) 570-0800
9450 SN Commen:e Clrde, SUte 180 Wllsonvlle, Oregon 97010
Pacific Habitat Services,Inc.
',
"- """-
'
'
~',"
Sediment
Fence
100
200
NOTE: See Figure 8A for
Erosion Control notes.
0
SCALE IN FEET
"-
400
<1..
,,, l
IV llj
I
~I
I
~
l
I~
10
( 0::
\Z
~
,~
,~
~I
I
I
I
fl
L
rri
Ii I
I
Sediment
Fence
Construction
Entrance
Concrete Washout
IFl8REI
5'x5'x3' deep
Sediment and Erosion Control Plan
Peterson Machinery Company - Hillsboro, OR
12-07-2015
6 of 8
NWP-2015-518
GRADING & UTILITY EROSION &
SEDIMENT CONSTRUCTION NOTES
4.
3.
2.
STOCKPILED SOIL STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION
AND CONFIGURATION. DURING "WET WEATHER" PERIODS, STOCKPILES SHALL
BE COVERED WITH PLASTIC SHEETING OR STRAW MULCH. SEDIMENT FENCE
IS REQUIRED AROUND THE PERIMETER OF THE STOCKPILE.
TEMP ORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE: COVERING
EXPOSED SOIL WITH PLASTIC SHEETING, STRAW MULCHING, WOOD CHIPS, OR
OTHER APPROVED MEASURES.
LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE
ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA SEEDING WITH
APPROVED MI X AND APPLICATION RA TE.
SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE THE
SURFACE ROUGHED BY MEANS OF TRACK-WALKING OR THE USE OF OTHER
APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES THE SEED
BEDDING AND REDUCES RUN-OFF VELOCITY.
1.
~~~~uGft~~~M~1 N(J~O B1y8~ifHT)
SEED USED FOR TEMPORARY OR PERMANENT SEEDING SHALL BE COMPOSED
OF ONE OF THE FOLLOWING MIXTURES, UNLESS OTHERWISE AUTHORIZED:
A. VEGETATED CORRIDOR AREAS REQUIRE NATIVE SEED MIXES.
SEE RESTORATION PLAN FOR APPROPRIATE SEED MIX.
5.
EXPOSED CUT OR FILL AREAS SHALL
TEMPORARY SEEDING AND MULCHING,
MATS, MID-SLOPE SEDIMENT FENCES
MEASURES. SLOPES EXCEEDING 25l'.:
CONTROL MEASURES.
B.
2. TURF-TYPE FESCUE (60l'.: BY WEIGHT)
C. STANDARD HEIGHT GRASS MIX (MIN. 100 LBS/AC.)
1. DWARF PERENNIAL RYEGRASS (BOl'.: BY WEGHT)
2. CREEPING RED FESCUE (20l'.: BY WEIGHT)
6.
AREAS SUBJECT TO WIND EROSION SHALL USE AP PROP RIA TE DUST CONTROL
MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF WATER,
PLASTIC SHEETING, STRAW MULCHING OR OTHER APPROVED MEASURES.
B.
CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES MAY INCLUDE, BUT NOT LIMITED TO. TIRE WASHES,
STREET SWEEPING AND VACUUMING (REQUIRED TO INSURE ALL PAVED
AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT).
BE STABILIZED THROUGH THE USE OF
EROSION CONTROL BLANKETS OR
OR WATTLES. OR OTHER APPROPRIATE
MAY REQUIRE ADDITIONAL EROSION
7.
9.
ACTIVE INLETS TO STORM WATER SYSTEMS SHALL BE PROTECTED THROUGH
THE USE OF APPROVED INLET PROTECTION MEASURES. ALL INLET
PROTECTION MEASURES ARE TO BE REGULARLY INSPECTED AND MAINTAINED
AS NEEDED.
10. SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE
TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE SPILLAGE OF
SEDIMENT AND SEDIMENT-LAIDEN WATER.
Plans Provided by CIDA
11 . AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE
TRUCKS IN A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN
ENTER THE STORM WATER SYSTEM. IF THE CONCRETE WASH-OUT AREA
CAN NOT BE CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE
POINT, SECONDARY MEASURES SUCH AS BERMS OR TEMPORARY SETTLING
PITS MAY BE REQUIRED. THE WASHOUT SHALL BE LOCATED WITHIN SIX
FEET OF TRUCK ACCESS AND BE CUEANED WHEN IT REACHES 50% OF
CAPACITY.
-~·
ot:-hJJI
9450 SN Common:e Circle, SUlte 180 Wllsoovllle, °'9gon 97070
Phone: (503) 570-0800
Fax (503) 570-0855
Pacific Habitat Services ,Inc.
12. SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE
TRANSFERRED TOT HE STORM WATER SYSTEM. SWEEPINGS SHALL BE
PICKED UP ANO DISPOSED OF IN THE TRASH.
13. AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF
INTO THE STORM WATER SYSTEM.
14. USE BMP's SUCH AS CHECK DAMS, BERMS, SEDIMENT FENCE AND INLET
PROTECTION TO PREVENT RUN-OFF FROM REACHING DISCHARGE POINTS.
15. COVER CATCHBASINS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN
APPLYING SEAL COAT, TACK COAT, ETC. TO PREVENT INTRODUCING THESE
MATERIALS TO THE STORM WATER SYSTEM.
4.
3.
2.
1.
INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING
ACTIVITIES.
THE STORMWATER FACILITY SHALL BE CONSTRUCTED AND FUNCTIONING PRIOR
TO SITE PAVING.
LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATllNG" SHALL BE
IN PLACEOVER ALL EXPOSED SOILS BY OCTOBER 1.
ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE
INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED GRADE AS
SHOWN ON THESE PLANS.
ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCE, ETC.) MUST BE IN PLACE.
FUNCTIONAL AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
EROSION AND SEDIMENT CONTROL
BMP IMPLEMENTATION
5.
Erosion Control Notes
Peterson Machinery Company - Hillsboro, OR
IFBAEI
12-03-2015
7 of 8
NWP-2015-518
'"'-- ,._,
"
'
'
'
_
............
Plans Provided by CIDA
Proposed Contours
Study Area Boundary (22.61 ac)
-,
.........
-,_
.~-
"·""
-,,
-,
LEGEND
_,,,__
Pacific Habitat Services,Inc.
9450 SN Commerce Circle, Suite 180 wnsonvllle, Oregon 97070
Phono: (503) 570~800
Fax (503) 570-0855
0
100
200
SCALE IN FEET
"
400
·~,
.
";?'&~
l
,~
I
,~
~z
~
(er:
10
I~
l
~i
Stormwater Plan
Peterson Machinery Company - Hillsboro, OR
I FlgREI
12-08-2015
8 of 8
NWP-2015-518
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Corps of Engineers No: NWP-2015-518
Notice Issued: December 24, 2015
Oregon Department of State Lands No: 58613Written Comments Due: January 25, 2016
WHO IS THE APPLICANT: Robert Evans Company, Inc., Mr. Robert Evans, 1505 NW 19 th
Avenue, Portland, Oregon 97209
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No.: NWP-2015-518
Page 1 of 2
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No.: NWP-2015-518