Michael LaDouceur is the Regulatory point-of-contact for this application for a permit from Robert Evans Company, Inc., to conduct work impacting wetlands on property located at the intersection of NW Five Oaks Drive and NW Croeni Road near Hillsboro, Oregon.

PUBLIC NOTICE for Permit Application

Issue Date: December 24, 2015 Expiration Date: January 25, 2016 US Army Corps of Engineers No: NWP-2015-518 30-Day Notice Oregon Department of State Lands No: APP0058613

Interested parties are hereby notified that an application has been received for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plan.

Comments: Comments on the described work should reference the U.S. Army Corps of Engineers (Corps) number shown above and reach this office no later than the above expiration date of this Public Notice to become part of the record and be considered in the decision. Comments should be emailed to Michael LaDouceur or mailed to the following address:

U.S. Army Corps of Engineers Regulatory Branch Mr. Michael LaDouceur, michael.a.ladouceur@usace.army.mil P.O. 2946 Portland, Oregon 97208-2946

Applicant:Robert Evans Company, Inc., Mr. Robert Evans, 1505 NW 19th Avenue, Portland, Oregon 97209

Location:The proposed project is located at the intersection of NW Five Oaks Drive and NW Croeni Road near Hillsboro, Unincorporated Washington County, Oregon (latitude 45.558442, longitude -122.907897)

Waterway:The proposed project would impact Wetland A – a 1.46 acre palustrine emergent, seasonally flooded slope wetland, Wetland B a .02 acre palustrine scrub-shrub, seasonally flooded slope wetland, and a roadside ditch. Wetland B continues off-site to the south west.

Project Description:The applicant has proposed to permanently impact 1.48 acres of wetlands to construct multiple commercial buildings, parking, stormwater features, and storage areas. The 23 - acre site will be graded to facilitate building construction. In addition, NW Five Oaks Drive would be abandoned and improvements would be made to NW Croeni Road. Stormwater facilities would be installed to treat and detain runoff from the new impervious surfaces. Mitigation: The applicant proposed purchasing 1.48 credits from the Tualatin Valley Environmental Mitigation Bank to compensate for the loss of 1.48 acres of wetland. If a permit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shall be commensurate with the anticipated impacts of the project.

Purpose:To construct commercial and showroom facilities and attendant structures within the Portland Metro Area.

Drawing(s):Eight (8) drawings are attached and labeled Corps No. NWP-2015-518

Additional Information:Additional information may be obtained from Mr. Michael LaDouceur, Project Manager, U.S. Army Corps of Engineers at (503) 808-4337, or by e-mail at michael.a.ladouceur@usace.army.mil.

Authority:This permit will be issued or denied under the following:

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Water Quality Certification:A permit for the described work will not be issued until certification, as required under Section 401 of the Clean Water Act (P.L. 95‑217), has been received or is waived from the certifying state. Attached is the state's notice advertising the request for certification.

Section 404(b)(1) Evaluation:The impact of the activity on the public interest will be evaluated in accordance with the Environmental Protection Agency guidelines pursuant to Section 404(b)(1) of the Clean Water Act.

Public Hearing:Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Endangered Species:Preliminary determinations indicate that the described activity may affect an endangered or threatened species or its critical habitat. Consultation under Section 7 of the Endangered Species Act of 1973 (87 Stat. 844) will be initiated. A permit for the proposed activity will not be issued until the consultation process is completed.

Cultural Resources:An initial evaluation of the proposed project area indicates that the permit area is likely to yield resources eligible for inclusion in the National Register of Historic Places. This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.

Evaluation:The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Additional Requirements:State law requires that leases, easements, or permits be obtained for certain works or activity in the described waters. These State requirements must be met where applicable, and a Department of the Army permit must be obtained before any work within the applicable Statutory Authority previously indicated may be accomplished. Other local governmental agencies may also have ordinances or requirements, which must be satisfied before the work is accomplished.

, __.··e: 1·J I

·',

"

\,_

NWP-2015-518

1 of 8

Project #5779 Date 9/17/15

~ Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070

3

Aerial Photo ITJIGURE Peterson Machinery Company, Oregon Google Earth, 2015

2 of 8

NWP-2015-518

I

=

LEGEND

=

E2ITB

Phone: (503) 570-0800

Study Area Boundary (22.61 ac) Wetland (1.48 ac)

Fax (503) 570-0855

Plans Provided by CIDA

Roadside Ditch

Pacific Habitat SeNices,lnc. 9450 SN Conmarcc Clrde, Stlltc 180Wlbofflille, Oregon 97070

0

100

200

SCALE IN FEET

400

Existing Conditions

Peterson Machinery Company - Hillsboro, OR

IFl:rl

12-07-2015

3 of 8

NWP-2015-518

'-,

LEGEND

-- = 1~ --

,,,____

__ -

-

~

-,_

Study Area Boundary (22.61 ac) Existing Contours Proposed Contours

Wetland A - 1.46 ac/ 20, 115 cy

Permanent Wetland Impact Fill (1.48 ac/ 20, 146 cy)

act 31 cy

Plans Provided by CIDA

Wetland B - 0.02

~-

[Jt:JJD

Pacific Habitat Services,Inc. 9450 SN Commerce Circle, Suite 180 INllsoovD!o, Oregon 97070 P hone: (503) 570-0600 F3:io: (503) 570-0855

0

100

200

SCALE IN FEET

400

Proposed Site Plan, Grading and Cross Section Locations

Peterson Machinery Company - Hillsboro, OR

12-08-2015

m

4 of 8

NWP-2015-518

Plans Provided by CIDA

Cross Section 81 -81 '

I EXISTIN G GRAnF"

V#//fi'/,/, '.:

,Kh ~#

I

----1

~-~------15.3-_---t---+--__J

r---+~-.k-~ ~~J-~ o~ '"=-g 1~-:iii 1-----1

9450 SN Commerce Clrde, Sulla 180 Wllsorivllle, Oregon 97070 Phone: (503) 570-0800 Fox (503) 570-0855

Pacific Habitat Services,Inc.

Cross Section A-A'

cc

~v1

EJi

'""""' ~"'

rc;-o _, >

, \

y ,-

..... 111\

" RADE

GRADE

Cross Section 82-82'

Cross Section of Wetland Impacts

Peterson Machinery Company - Hillsboro, OR

IFl?REI

12-03-2015

5 of 8

NWP-2015-518

'"..............

' '· '-,

I I

l ,,

~s 'fJjfS.

I

~

~D/~'IJ,

:.:-....>~--"'- ····.,..____

'--.

~

<>0 . "- "-

(us 1-tii;y'..-.,

Existing Contours

Study Area Boundary (22.61 ac)

vv,q Y

/'f.t;Qf.t/A .'

v,vs.$"

S/fA,

LEGEND

--21~--

Proposed Contours

= _ ,,,___

Fax (503) 570-0855

Plans Provided by CIDA

Concrete Washout

Construction Entrance

Inlet Protection

--o--- Sediment Fence

0 ~ ~

Phone: (503) 570-0800

9450 SN Commen:e Clrde, SUte 180 Wllsonvlle, Oregon 97010

Pacific Habitat Services,Inc.

',

"- """-

'

'

~'," Sediment Fence

100

200

NOTE: See Figure 8A for Erosion Control notes.

0

SCALE IN FEET

"-

400

<1..

,,, l

IV llj

I ~I

I

~

l

I~

10

( 0::

\Z ~

,~

,~

~I I

I

I

fl

L

rri

Ii I I

Sediment Fence

Construction Entrance

Concrete Washout

IFl8REI

5'x5'x3' deep

Sediment and Erosion Control Plan

Peterson Machinery Company - Hillsboro, OR

12-07-2015

6 of 8

NWP-2015-518

GRADING & UTILITY EROSION & SEDIMENT CONSTRUCTION NOTES

4.

3.

2.

STOCKPILED SOIL STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION AND CONFIGURATION. DURING "WET WEATHER" PERIODS, STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING OR STRAW MULCH. SEDIMENT FENCE IS REQUIRED AROUND THE PERIMETER OF THE STOCKPILE.

TEMP ORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE: COVERING EXPOSED SOIL WITH PLASTIC SHEETING, STRAW MULCHING, WOOD CHIPS, OR OTHER APPROVED MEASURES.

LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA SEEDING WITH APPROVED MI X AND APPLICATION RA TE.

SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE THE SURFACE ROUGHED BY MEANS OF TRACK-WALKING OR THE USE OF OTHER APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES THE SEED BEDDING AND REDUCES RUN-OFF VELOCITY.

1.

~~~~uGft~~~M~1 N(J~O B1y8~ifHT)

SEED USED FOR TEMPORARY OR PERMANENT SEEDING SHALL BE COMPOSED OF ONE OF THE FOLLOWING MIXTURES, UNLESS OTHERWISE AUTHORIZED: A. VEGETATED CORRIDOR AREAS REQUIRE NATIVE SEED MIXES. SEE RESTORATION PLAN FOR APPROPRIATE SEED MIX.

5.

EXPOSED CUT OR FILL AREAS SHALL TEMPORARY SEEDING AND MULCHING, MATS, MID-SLOPE SEDIMENT FENCES MEASURES. SLOPES EXCEEDING 25l'.: CONTROL MEASURES.

B. 2. TURF-TYPE FESCUE (60l'.: BY WEIGHT) C. STANDARD HEIGHT GRASS MIX (MIN. 100 LBS/AC.) 1. DWARF PERENNIAL RYEGRASS (BOl'.: BY WEGHT) 2. CREEPING RED FESCUE (20l'.: BY WEIGHT)

6.

AREAS SUBJECT TO WIND EROSION SHALL USE AP PROP RIA TE DUST CONTROL MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF WATER, PLASTIC SHEETING, STRAW MULCHING OR OTHER APPROVED MEASURES.

B.

CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY INCLUDE, BUT NOT LIMITED TO. TIRE WASHES, STREET SWEEPING AND VACUUMING (REQUIRED TO INSURE ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT).

BE STABILIZED THROUGH THE USE OF EROSION CONTROL BLANKETS OR OR WATTLES. OR OTHER APPROPRIATE MAY REQUIRE ADDITIONAL EROSION

7.

9.

ACTIVE INLETS TO STORM WATER SYSTEMS SHALL BE PROTECTED THROUGH THE USE OF APPROVED INLET PROTECTION MEASURES. ALL INLET PROTECTION MEASURES ARE TO BE REGULARLY INSPECTED AND MAINTAINED AS NEEDED.

10. SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE SPILLAGE OF SEDIMENT AND SEDIMENT-LAIDEN WATER.

Plans Provided by CIDA

11 . AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE TRUCKS IN A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN ENTER THE STORM WATER SYSTEM. IF THE CONCRETE WASH-OUT AREA CAN NOT BE CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE POINT, SECONDARY MEASURES SUCH AS BERMS OR TEMPORARY SETTLING PITS MAY BE REQUIRED. THE WASHOUT SHALL BE LOCATED WITHIN SIX FEET OF TRUCK ACCESS AND BE CUEANED WHEN IT REACHES 50% OF CAPACITY.

-~·

ot:-hJJI 9450 SN Common:e Circle, SUlte 180 Wllsoovllle, °'9gon 97070 Phone: (503) 570-0800 Fax (503) 570-0855

Pacific Habitat Services ,Inc.

12. SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE TRANSFERRED TOT HE STORM WATER SYSTEM. SWEEPINGS SHALL BE PICKED UP ANO DISPOSED OF IN THE TRASH. 13. AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF INTO THE STORM WATER SYSTEM. 14. USE BMP's SUCH AS CHECK DAMS, BERMS, SEDIMENT FENCE AND INLET PROTECTION TO PREVENT RUN-OFF FROM REACHING DISCHARGE POINTS. 15. COVER CATCHBASINS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN APPLYING SEAL COAT, TACK COAT, ETC. TO PREVENT INTRODUCING THESE MATERIALS TO THE STORM WATER SYSTEM.

4.

3.

2.

1.

INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING ACTIVITIES.

THE STORMWATER FACILITY SHALL BE CONSTRUCTED AND FUNCTIONING PRIOR TO SITE PAVING.

LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATllNG" SHALL BE IN PLACEOVER ALL EXPOSED SOILS BY OCTOBER 1.

ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED GRADE AS SHOWN ON THESE PLANS.

ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT CONTROL, GRAVEL CONSTRUCTION ENTRANCE, ETC.) MUST BE IN PLACE. FUNCTIONAL AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.

EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION

5.

Erosion Control Notes

Peterson Machinery Company - Hillsboro, OR

IFBAEI

12-03-2015

7 of 8

NWP-2015-518

'"'-- ,._,

"

'

' '

_

............

Plans Provided by CIDA

Proposed Contours

Study Area Boundary (22.61 ac)

-,

.........

-,_

.~-

"·""

-,, -,

LEGEND

_,,,__

Pacific Habitat Services,Inc. 9450 SN Commerce Circle, Suite 180 wnsonvllle, Oregon 97070 Phono: (503) 570~800 Fax (503) 570-0855

0

100

200

SCALE IN FEET

" 400

·~,

.

";?'&~

l

,~

I

,~

~z

~ (er:

10

I~ l

~i

Stormwater Plan

Peterson Machinery Company - Hillsboro, OR

I FlgREI

12-08-2015

8 of 8

NWP-2015-518

PUBLIC NOTICE Oregon Department of Environmental Quality (DEQ) Water Quality 401 Certification

Corps of Engineers No: NWP-2015-518 Notice Issued: December 24, 2015 Oregon Department of State Lands No: 58613Written Comments Due: January 25, 2016 WHO IS THE APPLICANT: Robert Evans Company, Inc., Mr. Robert Evans, 1505 NW 19 th Avenue, Portland, Oregon 97209 LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice. WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project. NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state. DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project. WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice. Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263. Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.

Corps No.: NWP-2015-518

Page 1 of 2

PUBLIC PARTICIPATION: Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing." Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below: Email - 401publiccomments@deq.state.or.us Mail - Oregon Department of Environmental Quality, Northwest Region 700 NE Multnomah Street, Suite 600 Portland, Oregon 97232 Attn: 401 Water Quality Certification Coordinator Fax - (503) 229-6957 WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address. ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.

Corps No.: NWP-2015-518

Page 2 of 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas