Home

Fort Worth District

Run scraper

The Sulphur River Basin Authority (SRBA) Wright Patman NOI EIS

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

View full notice of intentThe U.S. Army Corps of Engineers (USACE) will prepare an integrated Draft

View full notice of intent The U.S. Army Corps of Engineers (USACE) will prepare an integrated Draft Feasibility Report and Draft Environmental Impact Statement (EIS) that describes the results of investigations and analyses used to make determinations as to whether and/or what amount of flood storage might be reallocated to water supply to meet the needs of Region C and Region D. The Sulphur River Basin Authority (SRBA) is the non-federal sponsor to study the feasibility of reallocation (converting flood storage to water supply or raising the pool level) while protecting the City of Texarkana's water rights of 180,000 acre-feet (AF) per year. SRBA's sponsorship is for the study only. If reallocation is determined feasible and is pursued, the USACE will require a non-federal sponsor or sponsors for reallocation.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas