You can copy from here when filling out the rest of the page.
St. Charles Power Station Project in Montz, Louisiana
NAME OF APPLICANT: Entergy Louisiana, LLC ℅ CB&I, Attn: Deborah Saxton, 4171 Essen Lane, Baton Rouge, Louisiana, 70809.
LOCATION OF WORK: Within the existing boundary of the Entergy Louisiana, LLC, Little Gypsy Generating Plant, on the batture of the Mississippi River’s left descending bank, approximately 129.5 miles above Head of Passes, in Montz, Louisiana, St. Charles Parish, as shown on the enclosed drawings.
Latitude: 0.004511, Longitude: -90.464125
Hydrologic Unit Code: 08070204 – Lake Maurepas Watershed
CHARACTER OF WORK: The applicant proposes to install a combined cycle gas turbine, ancillary equipment, and appurtenances for the St. Charles Power Station. The proposed project is primarily located in disturbed uplands; however, the construction roads, power block, laydown yard, new gas lines, utilities, and metering station are anticipated to permanently impact 0.89 acres of Waters of the U.S. and temporarily impact 0.58 acres of Waters of the U.S. No mitigation plan was submitted with this action because the power plant design does not directly impact jurisdictional wetlands as proposed.
JOINT PUBLIC NOTICE
January 11, 2016
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2225
Brad.LaBorde@usace.army.mil
Project Manager
Brad LaBorde
Permit Application Number
MVN 2008-0031 EOO
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 160107-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
St. Charles Power Station Project in Montz, Louisiana
NAME OF APPLICANT: Entergy Louisiana, LLC CB&I, Attn: Deborah Saxton, 4171 Essen Lane,
Baton Rouge, Louisiana, 70809.
LOCATION OF WORK: Within the existing boundary of the Entergy Louisiana, LLC, Little Gypsy
Generating Plant, on the batture of the Mississippi River's left descending bank, approximately 129.5
miles above Head of Passes, in Montz, Louisiana, St. Charles Parish, as shown on the enclosed
drawings.
Latitude: 0.004511, Longitude: -90.464125
Hydrologic Unit Code: 08070204 Lake Maurepas Watershed
CHARACTER OF WORK: The applicant proposes to install a combined cycle gas turbine, ancillary
equipment, and appurtenances for the St. Charles Power Station. The proposed project is primarily
located in disturbed uplands; however, the construction roads, power block, laydown yard, new gas
lines, utilities, and metering station are anticipated to permanently impact 0.89 acres of Waters of the
U.S. and temporarily impact 0.58 acres of Waters of the U.S. No mitigation plan was submitted with
this action because the power plant design does not directly impact jurisdictional wetlands as
proposed.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
-2reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly notified of
the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total
of 30 calendar days. Similar letters concerning the Water Quality Certification must reference the
applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Department of Commerce, nor affect any habitat designated as critical to the
survival and recovery of any endangered species.
-3Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and the U.S. Fish
and Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity
would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of N/A acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
scps_152720_0002_site_location
DRAWING
NUMBER
SCPS
ENTRANCE
Lat: 30° 00' 16.24"
Long: 90° 27' 50.85"
BTR
OFFICE
D. Comeaux
DRAWN BY
09/16/15
CP
CHECKED BY
09/30/15
DCS
APPROVED BY
09/30/15
SITE
LOCATION
Copyright: © 2013 National Geographic Society
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
FIGURE
NUMBER
1
2,000
1,000
0
2,000
Feet
J:\Drafting\Entergy\152720\ArcView\GIS_Documents\Project_Maps\scps_152720_0002_site_location.mxd; Analyst: ben.holt; Date: 9/22/2015 10:21:36 AM
SITE LOCATION
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809
NOTES:
1. SEE FIGURE 2A FOR MATCH LINE.
REFERENCE: Source Drawing provided by CB&I Power, 152675-000-CV-02-00011 Rev B.
LEGEND:
DISTURBANCE AREA
TIMBER POWER POLES
ALTERNATE ROUTE FOR TIMBER
POWER POLES
STEEL PILE POLES
ELECTRICAL DUCT BANK/MANHOLE
EXTENT OF CONSTRUCTION
DISTRUBANCE - NORTH
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
FIGURE
NUMBER
2B
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809
NOTES:
1. See Figures 2A and 2B for more detail.
REFERENCE: Source Drawing provided by CB&I Power, 152675-000-CV-002-00010 Rev B and
152675-000-CV-02-00011 Rev B.
LEGEND:
DISTURBANCE AREA
TIMBER POWER POLES
ALTERNATE ROUTE FOR TIMBER
POWER POLES
STEEL PILE POLES
WATERS OF THE US
PERMANENT IMPACT TO WATERS
OF THE US (0.89 ACRES)
TEMPORARY IMPACT TO WATERS
OF THE US (0.58 ACRES)
WETLANDS
MIXED WETLAND
EXTENT OF CONSTRUCTION
DISTURBANCE
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
FIGURE
NUMBER
2C
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809
iDocs Document No.; Issue Statement; Rev. 0; 30Sep2015
APPROXIMATE ROUTE OF
PROPOSED 24" PIPELINE
APPROXIMATELY 700'
APPROXIMATE ROUTE OF
PROPOSED 24" PIPELINE
APPROXIMATELY 1,600'
Legend
300ft from Centerline of Levee
1500ft from Centerline of Levee
Secondary Fuel Supply Line
Primary Fuel Supply Line
Existing Pipeline
St. Charles Power Station
Property Boundary
PROPOSED
SCPS
APPROXIMATE
ENTERGY PROPERTY LINE
J:\Drafting\Entergy\152720\ArcView\GIS_Documents\Project_Maps\scps_152720_0001_pipeline_alignment.mxd; Analyst: ; Date: 9/30/2015 4:59:13 PM
GULF SOUTH
PERMANENT EASEMENT
NOTES:
1. SEE FIGURE 14B FOR DETAILS
AND CROSS-SECTIONS.
EXISTING
PIPELINE
ENTERGY
LITTLE GYPSY
PLANT
600
300
0
600
Feet
APPROXIMATE
ENTERGY PROPERTY LINE
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
FIGURE
NUMBER
14A
REFERENCE:
Source Drawing provided by Fenstermaker, 2152821-OPT2-003.
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,
CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP,
swisstopo, and the GIS User Community
NATURAL GAS
PIPELINE ALIGNMENTS
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809
10
10
68
8
6
8
8
0
12
12
4
12
1
Legend
14
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
1500ft from center of Levee
Property Boundary
REFERENCE:
LaPlace SW, LIDAR shapefile was downloaded from
http://atlas.lsu.edu/lidar
30282822 2
0
14
16 1282
10
202246 2246
16
14 14
16
32Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,
12
1DS,
18
CNES/Airbus
USDA, USGS, AEX, Getmapping, Aerogrid,
IGN,
IGP,
8
18
4
1
1
4
4
swisstopo,
and
the
GIS
User
Community
16
16
14
14
30
300ft from center of Levee
600
14
1
20
16 2 0
1 218
1 014
648
6
14
32
4
334
2
18
16
12
14 14
12
12
6 8
10
14
10
12 1
14
14
16
14
14
30
18
1
18
18
12
34
12
12
4
12
12
14
12
12
16
12
14
18
12
14
18
1
2
12
12
12
12 14
10
16
16
16
28
14
14
12
8
10
0
10
10
10
14 1
6
14
24
22
12
14
6
2
16
14
30
48
1
16
14
16
8
10
10
14
12
18
18
16
12
8
16
12
2
10
10
12
12
18
14
12
4
6
33 2
14
10
20
18 26
14
12
8
1
14
14
14
8
10
10
8
12
10
10 10
10
1 2 12
10
12
12
10
12
12
12
12
14
18
8
8
12
1
10
2
12
12
12
12
2
12
12
16 14
1
24 26
8
6
12
10
10
10
12
18
20
10
10
12
20
28
10
10
12
28
10
10
6
10
12
12
30
24
22
10 10
8
18
12
12
1
6
12
12
2
12
12
10
10
10
10
2
12
12
10
10
10
16
28
22 20
12
1
10
10
0
14
J:\Drafting\Entergy\152720\ArcView\GIS_Documents\Project_Maps\scps_152720_0004_LIDAR.mxd; Analyst: ; Date: 9/29/2015 7:08:45 PM
10
10
10
1
10
8
8
0
12
10 8
10
10
10
10
14
0
1
12
12
8
8
1
12
10
10
10
6
10
8
10
1
10
0
10
10
10
10
10
10
10
12
10
10
8
10
10
10
10
iDocs Document No.; Issue Statement; Rev. 0; 29Sep2015
10
FIGURE
NUMBER
300
0
600
Feet
19
LIDAR ELEVATIONS
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809
LEGEND:
WATERS OF THE US
PERMANENT IMPACT TO WATERS
OF THE US (0.89 ACRES)
TEMPORARY IMPACT TO WATERS
OF THE US (0.58 ACRES)
WETLANDS
MIXED WETLAND
TIMBER POWER POLES
ALTERNATE ROUTE FOR
TIMBER POWER POLES
STEEL PILE POLES
ELECTRICAL DUCT BANK/MANHOLE
NOTES:
1. SEE FIGURE 20A FOR MATCH LINE.
REFERENCE: Source Drawing provided by CB&I Power, 152675-000-CV-002-00010 Rev B.
WATERS OF THE US
IMPACT AREA - SOUTH
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
FIGURE
NUMBER
20A
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809
NOTES:
1. SEE FIGURE 20A FOR MATCH LINE.
REFERENCE: Source Drawing provided by CB&I Power, 152675-000-CV-02-00011 Rev B.
LEGEND:
WATERS OF THE US
PERMANENT IMPACT TO WATERS
OF THE US (0.89 ACRES)
WETLANDS
TEMPORARY IMPACT TO WATERS
OF THE US (0.58 ACRES)
TIMBER POWER POLES
ALTERNATE ROUTE FOR
TIMBER POWER POLES
STEEL PILE POLES
ELECTRICAL DUCT BANK/
MANHOLE
WATERS OF THE US
IMPACT AREA - NORTH
ST. CHARLES POWER STATION CCGT PROJECT
JOINT PERMIT APPLICATION
MONTZ, ST. CHARLES PARISH, LOUISIANA
FIGURE
NUMBER
20B
CB&I Government Solutions, Inc.
4171 Essen Lane
Baton Rouge, Louisiana 70809